Production à la commande et production pour stock dans un environnement MRP
Author
Abstract
Suggested Citation
Note: View the original document on HAL open archive server: https://hal.science/hal-00875557
Download full text from publisher
References listed on IDEAS
- Wijngaard, J. & Wortmann, J. C., 1985. "MRP and inventories," European Journal of Operational Research, Elsevier, vol. 20(3), pages 281-293, June.
- Inderfurth, Karl & Minner, Stefan, 1998. "Safety stocks in multi-stage inventory systems under different service measures," European Journal of Operational Research, Elsevier, vol. 106(1), pages 57-73, April.
- Lamouri, Samir & Thomas, Andre, 2000. "The two level master production schedule and planning bills in a just in time MRP context," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 409-415, March.
- Persona, Alessandro & Battini, Daria & Manzini, Riccardo & Pareschi, Arrigo, 2007. "Optimal safety stock levels of subassemblies and manufacturing components," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 147-159, October.
- Carole Camisullis & Vincent Giard & Gisele Mendy-Bilek, 2011. "Information to share in supply chains dedicated to the mass production of customized products for decentralized management," Working Papers hal-00876865, HAL.
- De Bodt, Marc A. & Van Wassenhove, Luk N. & Gelders, Ludo F., 1982. "Lot sizing and safety stock decisions in an MRP system with demand uncertainty," Engineering Costs and Production Economics, Elsevier, vol. 6(1), pages 67-75, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Vincent Giard & Mustapha Sali, 2012. "Pilotage d'une chaîne logistique par une approche de type MRP dans un environnement partiellement aléatoire," Working Papers hal-00875497, HAL.
- repec:dau:papers:123456789/9021 is not listed on IDEAS
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Vincent Giard & Mustapha Sali, 2012. "Pilotage d'une chaîne logistique par une approche de type MRP dans un environnement partiellement aléatoire," Working Papers hal-00875497, HAL.
- repec:dau:papers:123456789/9021 is not listed on IDEAS
- Vincent Giard & Mustapha Sali, 2012. "Monitoring of the upstream part of a supply chain dedicated to the customized mass production with a revisited version of MRP," Working Papers hal-00875498, HAL.
- repec:dau:papers:123456789/9020 is not listed on IDEAS
- Rafiei, Rezvan & Nourelfath, Mustapha & Gaudreault, Jonathan & De Santa-Eulalia, Luis Antonio & Bouchard, Mathieu, 2015. "Dynamic safety stock in co-production demand-driven wood remanufacturing mills: A case study," International Journal of Production Economics, Elsevier, vol. 165(C), pages 90-99.
- Osman, Hany & Demirli, Kudret, 2012. "Integrated safety stock optimization for multiple sourced stockpoints facing variable demand and lead time," International Journal of Production Economics, Elsevier, vol. 135(1), pages 299-307.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Hong, Zhaofu & Dai, Wei & Luh, Hsing & Yang, Chenchen, 2018. "Optimal configuration of a green product supply chain with guaranteed service time and emission constraints," European Journal of Operational Research, Elsevier, vol. 266(2), pages 663-677.
- Wilhelm, W. E. & Som, Pradip, 1998. "Analysis of a single-stage, single-product, stochastic, MRP-controlled assembly system," European Journal of Operational Research, Elsevier, vol. 108(1), pages 74-93, July.
- Riyadh Jamegh & AllaEldin Kassam & Sawsan Sabih, 2019. "Employment of advanced approach to control inventory level by monitoring Safety Stock in Supply Chain under Uncertain environment," Proceedings of International Academic Conferences 8711585, International Institute of Social and Economic Sciences.
- Kevin H. Shang & Jing-Sheng Song, 2006. "A Closed-Form Approximation for Serial Inventory Systems and Its Application to System Design," Manufacturing & Service Operations Management, INFORMS, vol. 8(4), pages 394-406, September.
- Daria Battini & Nils Boysen & Simon Emde, 2013. "Just-in-Time supermarkets for part supply in the automobile industry," Metrika: International Journal for Theoretical and Applied Statistics, Springer, vol. 24(2), pages 209-217, July.
- Inderfurth, Karl & Minner, Stefan, 1998. "Safety stocks in multi-stage inventory systems under different service measures," European Journal of Operational Research, Elsevier, vol. 106(1), pages 57-73, April.
- van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
- Amini, Mehdi & Li, Haitao, 2011. "Supply chain configuration for diffusion of new products: An integrated optimization approach," Omega, Elsevier, vol. 39(3), pages 313-322, June.
- Albrecht, Martin, 2014. "Determining near optimal base-stock levels in two-stage general inventory systems," European Journal of Operational Research, Elsevier, vol. 232(2), pages 342-349.
- Pujawan, I Nyoman & Silver, Edward A., 2008. "Augmenting the lot sizing order quantity when demand is probabilistic," European Journal of Operational Research, Elsevier, vol. 188(3), pages 705-722, August.
- Askin, Ronald G. & Krishnan, Shravan, 2009. "Defining inventory control points in multiproduct stochastic pull systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 418-429, August.
- Clément Chatras & Vincent Giard & Mustapha Sali, 2016. "Mass customisation impact on bill of materials structure and master production schedule development," International Journal of Production Research, Taylor & Francis Journals, vol. 54(18), pages 5634-5650, September.
- repec:dau:papers:123456789/2078 is not listed on IDEAS
- Schuster Puga, Matías & Minner, Stefan & Tancrez, Jean-Sébastien, 2019.
"Two-stage supply chain design with safety stock placement decisions,"
International Journal of Production Economics, Elsevier, vol. 209(C), pages 183-193.
- SCHUSTER Matias & MINNER Stefan & TANCREZ Jean-Sébastien, 2017. "Two-stage supply chain design with safety stock placement decisions," LIDAM Discussion Papers CORE 2017001, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Matias Schuster Puga & Stefan Minner & Jean-Sébastien Tancrez, 2019. "Two-stage supply chain design with safety stock placement decisions," LIDAM Reprints CORE 3033, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Aouam, Tarik & Kumar, Kunal, 2019. "On the effect of overtime and subcontracting on supply chain safety stocks," Omega, Elsevier, vol. 89(C), pages 1-20.
- Minner, Stefan, 2001. "Strategic safety stocks in reverse logistics supply chains," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 417-428, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:wpaper:hal-00875557. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.