Relations between cells in cellular manufacturing
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Nallan C. Suresh & Jack R. Meredith, 1994. "Coping with the Loss of Pooling Synergy in Cellular Manufacturing Systems," Management Science, INFORMS, vol. 40(4), pages 466-483, April.
- Dale, BG & Russell, D, 1983. "Production control systems for small group production," Omega, Elsevier, vol. 11(2), pages 175-185.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- repec:dgr:rugsom:97a21 is not listed on IDEAS
- Riezebos, J., 1997. "Modelling the trade off between period lenght and stages in a period batch control system," Research Report 97A21, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Molleman, Eric & Slomp, Jannes & Rolefes, Samantha, 2002. "The evolution of a cellular manufacturing system - a longitudinal case study," International Journal of Production Economics, Elsevier, vol. 75(3), pages 305-322, February.
- repec:dgr:rugsom:95a45 is not listed on IDEAS
- Cao, Qidong & Patterson, J. Wayne & Bai, Xue, 2005. "Reexamination of processing time uncertainty," European Journal of Operational Research, Elsevier, vol. 164(1), pages 185-194, July.
- Olorunniwo, Festus & Udo, Godwin, 2002. "The impact of management and employees on cellular manufacturing implementation," International Journal of Production Economics, Elsevier, vol. 76(1), pages 27-38, March.
- D'Angelo, Andrea & Gastaldi, Massimo & Levialdi, Nathan, 2000. "Production variability and shop configuration: An experimental analysis," International Journal of Production Economics, Elsevier, vol. 68(1), pages 43-57, October.
- Wenhui Zhou & Dongmei Wang & Weixiang Huang & Pengfei Guo, 2021. "To Pool or Not to Pool? The Effect of Loss Aversion on Queue Configurations," Production and Operations Management, Production and Operations Management Society, vol. 30(11), pages 4258-4272, November.
- Manning, William & Jensen, John, 2006. "Evaluating the shop-wide performance effect of pooling synergy with analytical models," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1009-1020, December.
- Kannan, V. R. & Ghosh, S., 1995. "Using dynamic cellular manufacturing to simplify scheduling in cell based production systems," Omega, Elsevier, vol. 23(4), pages 443-452, August.
- Riezebos, J., 1998. "Production planning systems for cellular manufacturing," Research Report 98A07, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Mor Armony & Guillaume Roels & Hummy Song, 2021. "Pooling Queues with Strategic Servers: The Effects of Customer Ownership," Operations Research, INFORMS, vol. 69(1), pages 13-29, January.
- van der Vaart, Taco & Wijngaard, Jacob, 2007. "The contribution of focus in collaborative planning for make-to-order production situation with large set-up times," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 436-443, July.
- repec:dgr:rugsom:98a07 is not listed on IDEAS
- Safaei, Nima & Tavakkoli-Moghaddam, Reza, 2009. "Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 301-314, August.
- Shambu, Girish & Suresh, Nallan C., 2000. "Performance of hybrid cellular manufacturing systems: A computer simulation investigation," European Journal of Operational Research, Elsevier, vol. 120(2), pages 436-458, January.
- Jensen, John B., 2000. "The impact of resource flexibility and staffing decisions on cellular and departmental shop performance," European Journal of Operational Research, Elsevier, vol. 127(2), pages 279-296, December.
- Saif Benjaafar & Sunderesh S. Heragu & Shahrukh A. Irani, 2002. "Next Generation Factory Layouts: Research Challenges and Recent Progress," Interfaces, INFORMS, vol. 32(6), pages 58-76, December.
- Shafer, S. M. & Meredith, J. R. & Marsh, R. F., 1995. "A taxonomy for alternative equipment groupings in batch environments," Omega, Elsevier, vol. 23(4), pages 361-376, August.
- Hamister, James W. & Suresh, Nallan C., 2008. "The impact of pricing policy on sales variability in a supermarket retail context," International Journal of Production Economics, Elsevier, vol. 111(2), pages 441-455, February.
- Nomden, Gert & van der Zee, Durk-Jouke, 2008. "Virtual cellular manufacturing: Configuring routing flexibility," International Journal of Production Economics, Elsevier, vol. 112(1), pages 439-451, March.
- Kannan, Vijay R. & Palocsay, Susan W., 1999. "Cellular vs process layouts: an analytic investigation of the impact of learning on shop performance," Omega, Elsevier, vol. 27(5), pages 583-592, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gro:rugsom:95a45. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Hanneke Tamling (email available below). General contact details of provider: https://edirc.repec.org/data/ferugnl.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.