Jan Riezebos
Personal Details
First Name: | Jan |
Middle Name: | |
Last Name: | Riezebos |
Suffix: | |
RePEc Short-ID: | pri5 |
[This author has chosen not to make the email address public] | |
http://www.rug.nl/staff/j.riezebos | |
P.O. box 800 NL-9700 AV Groningen The Netherlands | |
+31 50 363 4853 |
Affiliation
SOM Research Institute
Faculteit Economie en Bedrijfskunde
Rijksuniversiteit Groningen
Groningen, Netherlandshttp://www.rug.nl/research/som-ri/
RePEc:edi:sorugnl (more details at EDIRC)
Research output
Jump to: Working papers Articles ChaptersWorking papers
- M. Godinho Filho & A. Gilberto Marchesini & J. Riezebos & Nico Vandaele & G. Miller Devós Ganga, 2017.
"The extent of knowledge of Quick Response Manufacturing principles: an exploratory transnational study,"
Working Papers of Department of Decision Sciences and Information Management, Leuven
572152, KU Leuven, Faculty of Economics and Business (FEB), Department of Decision Sciences and Information Management, Leuven.
- Moacir Godinho Filho & Antonio Gilberto Marchesini & Jan Riezebos & Nico Vandaele & Gilberto Miller Devós Ganga, 2017. "The extent of knowledge of Quick Response Manufacturing principles: an exploratory transnational study," International Journal of Production Research, Taylor & Francis Journals, vol. 55(17), pages 4891-4911, September.
- Prak, Dennis R.J. & Teunter, Ruud & Riezebos, Jan, 2014.
"Periodic review and continuous ordering,"
Research Report
14005-OPERA, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Prak, Dennis & Teunter, Ruud & Riezebos, Jan, 2015. "Periodic review and continuous ordering," European Journal of Operational Research, Elsevier, vol. 242(3), pages 820-827.
- Jan Riezebos, 2004. "Design of a Period Batch Control planning system for cellular manufacturing," Industrial Organization 0410004, University Library of Munich, Germany.
- Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Riezebos, J., 1998. "Production planning systems for cellular manufacturing," Research Report 98A07, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Riezebos, J., 1997. "Modelling the trade off between period lenght and stages in a period batch control system," Research Report 97A21, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Riezebos, J. & Gaalman, G.J.C., 1996. "Heuristics for flow shop scheduling with multiple operations and time lags," Research Report 96A08, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Riezebos, J. & Gaalman, G.J.C., 1995. "Relations between cells in cellular manufacturing," Research Report 95A45, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
Articles
- Riezebos, Jan & Zhu, Stuart X., 2020. "Inventory control with seasonality of lead times," Omega, Elsevier, vol. 92(C).
- Godinho Filho, Moacir & Marchesini, Antonio Gilberto & Riezebos, Jan & Vandaele, Nico & Ganga, Gilberto Miller Devós, 2017. "The application of Quick Response Manufacturing practices in Brazil, Europe, and the USA: An exploratory study," International Journal of Production Economics, Elsevier, vol. 193(C), pages 437-448.
- Moacir Godinho Filho & Antonio Gilberto Marchesini & Jan Riezebos & Nico Vandaele & Gilberto Miller Devós Ganga, 2017.
"The extent of knowledge of Quick Response Manufacturing principles: an exploratory transnational study,"
International Journal of Production Research, Taylor & Francis Journals, vol. 55(17), pages 4891-4911, September.
- M. Godinho Filho & A. Gilberto Marchesini & J. Riezebos & Nico Vandaele & G. Miller Devós Ganga, 2017. "The extent of knowledge of Quick Response Manufacturing principles: an exploratory transnational study," Working Papers of Department of Decision Sciences and Information Management, Leuven 572152, KU Leuven, Faculty of Economics and Business (FEB), Department of Decision Sciences and Information Management, Leuven.
- Beemsterboer, Bart & Teunter, Ruud & Riezebos, Jan, 2016. "Two-product storage-capacitated inventory systems: A technical note," International Journal of Production Economics, Elsevier, vol. 176(C), pages 92-97.
- Prak, Dennis & Teunter, Ruud & Riezebos, Jan, 2015.
"Periodic review and continuous ordering,"
European Journal of Operational Research, Elsevier, vol. 242(3), pages 820-827.
- Prak, Dennis R.J. & Teunter, Ruud & Riezebos, Jan, 2014. "Periodic review and continuous ordering," Research Report 14005-OPERA, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Jan Riezebos & Stuart X. Zhu, 2015. "MRP Planned Orders in a Multiple-Supplier Environment with Differing Lead Times," Production and Operations Management, Production and Operations Management Society, vol. 24(6), pages 883-895, June.
- Bakker, Monique & Riezebos, Jan & Teunter, Ruud H., 2012. "Review of inventory systems with deterioration since 2001," European Journal of Operational Research, Elsevier, vol. 221(2), pages 275-284.
- Riezebos, J. & Gaalman, G.J.C., 2009. "A single-item inventory model for expected inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 121(2), pages 601-609, October.
- Riezebos, Jan, 2006. "Inventory order crossovers," International Journal of Production Economics, Elsevier, vol. 104(2), pages 666-675, December.
- Riezebos, J. & Gaalman, G. J. C., 1998. "Time lag size in multiple operations flow shop scheduling heuristics," European Journal of Operational Research, Elsevier, vol. 105(1), pages 72-90, February.
Chapters
- Cees Snoo & Wout Wezel & Jan Riezebos, 2010. "A Sample of Hopsopedia Term Descriptions," Springer Books, in: Jan C. Fransoo & Toni Waefler & John R. Wilson (ed.), Behavioral Operations in Planning and Scheduling, chapter 0, pages 443-460, Springer.
- Wout Wezel & Jan Riezebos, 2010. "Case Study: Advanced Decision Support for Train Shunting Scheduling," Springer Books, in: Jan C. Fransoo & Toni Waefler & John R. Wilson (ed.), Behavioral Operations in Planning and Scheduling, chapter 0, pages 413-430, Springer.
- Cees Snoo & Wout Wezel & Jan Riezebos, 2010. "An Open Source Encyclopedia and Debating Instrument for Planning Terms: The Hopsopedia," Springer Books, in: Jan C. Fransoo & Toni Waefler & John R. Wilson (ed.), Behavioral Operations in Planning and Scheduling, chapter 0, pages 433-442, Springer.
- Jan Riezebos & Jean-Michel Hoc & Nasser Mebarki & Christos Dimopoulos & Wout Wezel & Guillaume Pinot, 2010. "Design of Scheduling Algorithms," Springer Books, in: Jan C. Fransoo & Toni Waefler & John R. Wilson (ed.), Behavioral Operations in Planning and Scheduling, chapter 0, pages 299-321, Springer.
- Jan Riezebos & Jean-Michel Hoc & Nasser Mebarki & Christos Dimopoulos & Wout Wezel & Guillaume Pinot, 2010. "Design of Scheduling Algorithms: Applications," Springer Books, in: Jan C. Fransoo & Toni Waefler & John R. Wilson (ed.), Behavioral Operations in Planning and Scheduling, chapter 0, pages 371-412, Springer.
More information
Research fields, statistics, top rankings, if available.Statistics
Access and download statistics for all items
NEP Fields
NEP is an announcement service for new working papers, with a weekly report in each of many fields. This author has had 2 papers announced in NEP. These are the fields, ordered by number of announcements, along with their dates. If the author is listed in the directory of specialists for this field, a link is also provided.- NEP-INO: Innovation (1) 2004-10-21
- NEP-KNM: Knowledge Management and Knowledge Economy (1) 2017-02-26
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.
To update listings or check citations waiting for approval, Jan Riezebos should log into the RePEc Author Service.
To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.
To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.
Please note that most corrections can take a couple of weeks to filter through the various RePEc services.