IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v112y2008i1p439-451.html
   My bibliography  Save this article

Virtual cellular manufacturing: Configuring routing flexibility

Author

Listed:
  • Nomden, Gert
  • van der Zee, Durk-Jouke

Abstract

Virtual cellular manufacturing (VCM) creates groups of products and machines in the production planning and control system. Similar groupings may help to reduce set-up times. Starting from two industrial cases, we study parallel machine shops assuming the implementation of VCM. We address the way mid-term investments in process planning, machines, and secondary resources may improve shop performance. Here our prime focus is on an increase of routing flexibility in terms of the number and distribution of alternative machines available for a product family, and the number of secondary resources. An extensive simulation study makes clear that: (1) a small number of alternative routes will mostly suffice, (2) a chained distribution of routes is preferable, and (3) additional secondary resources are relevant only under specific conditions.

Suggested Citation

  • Nomden, Gert & van der Zee, Durk-Jouke, 2008. "Virtual cellular manufacturing: Configuring routing flexibility," International Journal of Production Economics, Elsevier, vol. 112(1), pages 439-451, March.
  • Handle: RePEc:eee:proeco:v:112:y:2008:i:1:p:439-451
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(07)00230-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Garavelli, A. Claudio, 2001. "Performance analysis of a batch production system with limited flexibility," International Journal of Production Economics, Elsevier, vol. 69(1), pages 39-48, January.
    2. Nallan C. Suresh & Jack R. Meredith, 1994. "Coping with the Loss of Pooling Synergy in Cellular Manufacturing Systems," Management Science, INFORMS, vol. 40(4), pages 466-483, April.
    3. Shanker, Kripa & Agrawal, Anil Kumar, 1991. "Loading problem and resource considerations in FMS: a review," International Journal of Production Economics, Elsevier, vol. 25(1-3), pages 111-119.
    4. Andres, Carlos & Albarracin, Jose Miguel & Tormo, Guillermina & Vicens, Eduardo & Garcia-Sabater, Jose Pedro, 2005. "Group technology in a hybrid flowshop environment: A case study," European Journal of Operational Research, Elsevier, vol. 167(1), pages 272-281, November.
    5. Das, Sanchoy K. & Nagendra, Prashanth, 1997. "Selection of routes in a flexible manufacturing facility," International Journal of Production Economics, Elsevier, vol. 48(3), pages 237-247, February.
    6. William C. Jordan & Stephen C. Graves, 1995. "Principles on the Benefits of Manufacturing Process Flexibility," Management Science, INFORMS, vol. 41(4), pages 577-594, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Durk-Jouke van der Zee, 2017. "Coordinating batching decisions in manufacturing networks," International Journal of Production Research, Taylor & Francis Journals, vol. 55(18), pages 5405-5422, September.
    2. Baoyu Liao & Qingru Song & Jun Pei & Shanlin Yang & Panos M. Pardalos, 2020. "Parallel-machine group scheduling with inclusive processing set restrictions, outsourcing option and serial-batching under the effect of step-deterioration," Journal of Global Optimization, Springer, vol. 78(4), pages 717-742, December.
    3. A. Attila İşlier, 2015. "Cellular Manufacturing Systems: Organization, Trends and Innovative Methods," Alphanumeric Journal, Bahadir Fatih Yildirim, vol. 3(2), pages 13-26, December.
    4. Baykasoglu, Adil & ÖzbakIr, Lale, 2010. "Analyzing the effect of dispatching rules on the scheduling performance through grammar based flexible scheduling system," International Journal of Production Economics, Elsevier, vol. 124(2), pages 369-381, April.
    5. Safaei, Nima & Tavakkoli-Moghaddam, Reza, 2009. "Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems," International Journal of Production Economics, Elsevier, vol. 120(2), pages 301-314, August.
    6. Gultekin, Hakan, 2012. "Scheduling in flowshops with flexible operations: Throughput optimization and benefits of flexibility," International Journal of Production Economics, Elsevier, vol. 140(2), pages 900-911.
    7. Jing, Hao & Sheng, Lijuan & Luo, Chaorui & Kwak, Choonjong, 2021. "Statistical analysis of family based dispatching rules and preemption," International Journal of Production Economics, Elsevier, vol. 240(C).
    8. Legros, Benjamin & Jouini, Oualid & Dallery, Yves, 2015. "A flexible architecture for call centers with skill-based routing," International Journal of Production Economics, Elsevier, vol. 159(C), pages 192-207.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Garavelli, A. Claudio, 2003. "Flexibility configurations for the supply chain management," International Journal of Production Economics, Elsevier, vol. 85(2), pages 141-153, August.
    2. Garavelli, A. Claudio, 2001. "Performance analysis of a batch production system with limited flexibility," International Journal of Production Economics, Elsevier, vol. 69(1), pages 39-48, January.
    3. Legros, Benjamin & Jouini, Oualid & Dallery, Yves, 2015. "A flexible architecture for call centers with skill-based routing," International Journal of Production Economics, Elsevier, vol. 159(C), pages 192-207.
    4. Albino, Vito & Claudio Garavelli, A., 1999. "Limited flexibility in cellular manufacturing systems: A simulation study," International Journal of Production Economics, Elsevier, vol. 60(1), pages 447-455, April.
    5. Jan A. Van Mieghem & Nils Rudi, 2002. "Newsvendor Networks: Inventory Management and Capacity Investment with Discretionary Activities," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 313-335, August.
    6. Ho-Yin Mak & Zuo-Jun Max Shen, 2014. "Pooling and Dependence of Demand and Yield in Multiple-Location Inventory Systems," Manufacturing & Service Operations Management, INFORMS, vol. 16(2), pages 263-269, May.
    7. Hofmann, Christian, 1998. "Investments in modern production technology and the cash flow-oriented EPQ-model," International Journal of Production Economics, Elsevier, vol. 54(2), pages 193-206, January.
    8. Lauren Xiaoyuan Lu & Jan A. Van Mieghem, 2009. "Multimarket Facility Network Design with Offshoring Applications," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 90-108, October.
    9. Riezebos, J. & Gaalman, G.J.C., 1995. "Relations between cells in cellular manufacturing," Research Report 95A45, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
    10. Seebacher, Gottfried & Winkler, Herwig, 2014. "Evaluating flexibility in discrete manufacturing based on performance and efficiency," International Journal of Production Economics, Elsevier, vol. 153(C), pages 340-351.
    11. Brian Tomlin & Yimin Wang, 2005. "On the Value of Mix Flexibility and Dual Sourcing in Unreliable Newsvendor Networks," Manufacturing & Service Operations Management, INFORMS, vol. 7(1), pages 37-57, June.
    12. Vikrant Sharma & Sundeep Kumar & M. L. Meena, 2022. "Key criteria influencing cellular manufacturing system: a fuzzy AHP model," Journal of Business Economics, Springer, vol. 92(1), pages 65-84, January.
    13. Yanting Chen & Jingui Xie & Taozeng Zhu, 2023. "Overflow in systems with two servers: the negative consequences," Flexible Services and Manufacturing Journal, Springer, vol. 35(3), pages 838-863, September.
    14. Kim, Nayeon & Montreuil, Benoit & Klibi, Walid & Zied Babai, M., 2023. "Network inventory deployment for responsive fulfillment," International Journal of Production Economics, Elsevier, vol. 255(C).
    15. Patrick Afflerbach & Gregor Kastner & Felix Krause & Maximilian Röglinger, 2014. "The Business Value of Process Flexibility," Business & Information Systems Engineering: The International Journal of WIRTSCHAFTSINFORMATIK, Springer;Gesellschaft für Informatik e.V. (GI), vol. 6(4), pages 203-214, August.
    16. Crary, Michael & Nozick, L. K. & Whitaker, L. R., 2002. "Sizing the US destroyer fleet," European Journal of Operational Research, Elsevier, vol. 136(3), pages 680-695, February.
    17. Saurabh Bansal & James S. Dyer, 2017. "Technical Note—Multivariate Partial-Expectation Results for Exact Solutions of Two-Stage Problems," Operations Research, INFORMS, vol. 65(6), pages 1526-1534, December.
    18. Maria Isabella Leone & Raffaele Oriani & Toke Reichstein, 2015. "How much are flexibility and uncertainty worth in patent licensing?," Economia e Politica Industriale: Journal of Industrial and Business Economics, Springer;Associazione Amici di Economia e Politica Industriale, vol. 42(4), pages 371-394, December.
    19. Saravanan Kesavan & Susan J. Lambert & Joan C. Williams & Pradeep K. Pendem, 2022. "Doing Well by Doing Good: Improving Retail Store Performance with Responsible Scheduling Practices at the Gap, Inc," Management Science, INFORMS, vol. 68(11), pages 7818-7836, November.
    20. Cao, Qidong & Patterson, J. Wayne & Bai, Xue, 2005. "Reexamination of processing time uncertainty," European Journal of Operational Research, Elsevier, vol. 164(1), pages 185-194, July.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:112:y:2008:i:1:p:439-451. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.