Integrating Timetabling and Crew
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Freling, R. & Huisman, D. & Wagelmans, A.P.M., 2000. "Models and algorithms for Integration of Vehicle and Crew Scheduling," ERIM Report Series Research in Management ERS-2000-14-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Daniel Potthoff & Dennis Huisman & Guy Desaulniers, 2010. "Column Generation with Dynamic Duty Selection for Railway Crew Rescheduling," Transportation Science, INFORMS, vol. 44(4), pages 493-505, November.
- Ingmar Steinzen & Vitali Gintner & Leena Suhl & Natalia Kliewer, 2010. "A Time-Space Network Approach for the Integrated Vehicle- and Crew-Scheduling Problem with Multiple Depots," Transportation Science, INFORMS, vol. 44(3), pages 367-382, August.
- Kroon, L.G. & Huisman, D. & Abbink, E.J.W. & Fioole, P-J. & Fischetti, M. & Maróti, G. & Schrijver, A. & Steenbeek, A. & Ybema, R., 2008. "The new Dutch timetable: The OR revolution," Econometric Institute Research Papers EI 2008-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Vitali Gintner & Natalia Kliewer & Leena Suhl, 2008. "A Crew Scheduling Approach for Public Transit Enhanced with Aspects from Vehicle Scheduling," Lecture Notes in Economics and Mathematical Systems, in: Mark Hickman & Pitu Mirchandani & Stefan Voß (ed.), Computer-aided Systems in Public Transport, pages 25-42, Springer.
- Raymond Kwan & Ann Kwan, 2007. "Effective search space control for large and/or complex driver scheduling problems," Annals of Operations Research, Springer, vol. 155(1), pages 417-435, November.
- Potthoff, D. & Huisman, D. & Desaulniers, G., 2008. "Column generation with dynamic duty selection for railway crew rescheduling," Econometric Institute Research Papers EI 2008-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Dennis Huisman & Leo G. Kroon & Ramon M. Lentink & Michiel J. C. M. Vromans, 2005.
"Operations Research in passenger railway transportation,"
Statistica Neerlandica, Netherlands Society for Statistics and Operations Research, vol. 59(4), pages 467-497, November.
- Huisman, D. & Kroon, L.G. & Lentink, R.M. & Vromans, M.J.C.M., 2005. "Operations research in passenger railway transportation," Econometric Institute Research Papers EI 2005-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Huisman, D. & Kroon, L.G. & Lentink, R.M. & Vromans, M.J.C.M., 2005. "Operations Research in Passenger Railway Transportation," ERIM Report Series Research in Management ERS-2005-023-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Jütte, Silke & Thonemann, Ulrich W., 2012. "Divide-and-price: A decomposition algorithm for solving large railway crew scheduling problems," European Journal of Operational Research, Elsevier, vol. 219(2), pages 214-223.
- Veelenturf, L.P. & Potthoff, D. & Huisman, D. & Kroon, L.G., 2009. "Railway Crew Rescheduling with Retiming," Econometric Institute Research Papers EI 2009-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Abbink, E.J.W. & Albino, L. & Dollevoet, T.A.B. & Huisman, D. & Roussado, J. & Saldanha, R.L., 2010. "Solving Large Scale Crew Scheduling Problems in Practice," Econometric Institute Research Papers EI 2010-63, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Dennis Huisman & Richard Freling & Albert P. M. Wagelmans, 2005. "Multiple-Depot Integrated Vehicle and Crew Scheduling," Transportation Science, INFORMS, vol. 39(4), pages 491-502, November.
- Alberto Caprara & Matteo Fischetti & Paolo Toth, 1999. "A Heuristic Method for the Set Covering Problem," Operations Research, INFORMS, vol. 47(5), pages 730-743, October.
- Huisman, D. & Freling, R. & Wagelmans, A.P.M., 2003. "Multiple-Depot Integrated Vehicle and Crew Scheduling," Econometric Institute Research Papers EI 2003-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Leo Kroon & Dennis Huisman & Erwin Abbink & Pieter-Jan Fioole & Matteo Fischetti & Gábor Maróti & Alexander Schrijver & Adri Steenbeek & Roelof Ybema, 2009. "The New Dutch Timetable: The OR Revolution," Interfaces, INFORMS, vol. 39(1), pages 6-17, February.
- de Groot, S.W. & Huisman, D., 2004. "Vehicle and crew scheduling: solving large real-world instances with an integrated approach," Econometric Institute Research Papers EI 2004-13, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sebastiaan W. Groot & Dennis Huisman, 2008. "Vehicle and Crew Scheduling: Solving Large Real-World Instances with an Integrated Approach," Lecture Notes in Economics and Mathematical Systems, in: Mark Hickman & Pitu Mirchandani & Stefan Voß (ed.), Computer-aided Systems in Public Transport, pages 43-56, Springer.
- Huisman, Dennis, 2007. "A column generation approach for the rail crew re-scheduling problem," European Journal of Operational Research, Elsevier, vol. 180(1), pages 163-173, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lukas Bach & Twan Dollevoet & Dennis Huisman, 2016. "Integrating Timetabling and Crew Scheduling at a Freight Railway Operator," Transportation Science, INFORMS, vol. 50(3), pages 878-891, August.
- Heil, Julia & Hoffmann, Kirsten & Buscher, Udo, 2020. "Railway crew scheduling: Models, methods and applications," European Journal of Operational Research, Elsevier, vol. 283(2), pages 405-425.
- Lucas P. Veelenturf & Daniel Potthoff & Dennis Huisman & Leo G. Kroon & Gábor Maróti & Albert P. M. Wagelmans, 2016. "A Quasi-Robust Optimization Approach for Crew Rescheduling," Transportation Science, INFORMS, vol. 50(1), pages 204-215, February.
- Nielsen, Lars Kjær & Kroon, Leo & Maróti, Gábor, 2012. "A rolling horizon approach for disruption management of railway rolling stock," European Journal of Operational Research, Elsevier, vol. 220(2), pages 496-509.
- van Lieshout, R.N. & Mulder, J. & Huisman, D., 2016. "The Vehicle Rescheduling Problem with Retiming," Econometric Institute Research Papers EI2016-37, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Kroon, L.G. & Huisman, D., 2011. "Algorithmic Support for Disruption Management at Netherlands Railways," Econometric Institute Research Papers EI 2011-06, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Markó Horváth & Tamás Kis, 2019. "Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 27(1), pages 39-67, March.
- Veelenturf, L.P. & Potthoff, D. & Huisman, D. & Kroon, L.G. & Maróti, G. & Wagelmans, A.P.M., 2013. "A Quasi-Robust Optimization Approach for Resource Rescheduling," Econometric Institute Research Papers 50110, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- F. Zeynep Sargut & Caner Altuntaş & Dilek Cetin Tulazoğlu, 2017. "Multi-objective integrated acyclic crew rostering and vehicle assignment problem in public bus transportation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(4), pages 1071-1096, October.
- Ibarra-Rojas, O.J. & Delgado, F. & Giesen, R. & Muñoz, J.C., 2015. "Planning, operation, and control of bus transport systems: A literature review," Transportation Research Part B: Methodological, Elsevier, vol. 77(C), pages 38-75.
- Daniel Potthoff & Dennis Huisman & Guy Desaulniers, 2010. "Column Generation with Dynamic Duty Selection for Railway Crew Rescheduling," Transportation Science, INFORMS, vol. 44(4), pages 493-505, November.
- Perumal, Shyam S.G. & Lusby, Richard M. & Larsen, Jesper, 2022. "Electric bus planning & scheduling: A review of related problems and methodologies," European Journal of Operational Research, Elsevier, vol. 301(2), pages 395-413.
- Dekker, M.M. & van Lieshout, R.N. & Ball, R.C. & Bouman, P.C. & Dekker, S.C. & Dijkstra, H.A. & Goverde, R.M.P. & Huisman, D. & Panja, D. & Schaafsma, A.M. & van den Akker, M., 2018. "A Next Step in Disruption Management: Combining Operations Research and Complexity Science," Econometric Institute Research Papers EI2018-25, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Dauzère-Pérès, Stéphane & De Almeida, David & Guyon, Olivier & Benhizia, Faten, 2015. "A Lagrangian heuristic framework for a real-life integrated planning problem of railway transportation resources," Transportation Research Part B: Methodological, Elsevier, vol. 74(C), pages 138-150.
- Leo Kroon & Gábor Maróti & Lars Nielsen, 2015. "Rescheduling of Railway Rolling Stock with Dynamic Passenger Flows," Transportation Science, INFORMS, vol. 49(2), pages 165-184, May.
- Ingmar Steinzen & Vitali Gintner & Leena Suhl & Natalia Kliewer, 2010. "A Time-Space Network Approach for the Integrated Vehicle- and Crew-Scheduling Problem with Multiple Depots," Transportation Science, INFORMS, vol. 44(3), pages 367-382, August.
- Potthoff, D. & Huisman, D. & Desaulniers, G., 2008. "Column generation with dynamic duty selection for railway crew rescheduling," Econometric Institute Research Papers EI 2008-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Masoud Yaghini & Mohammad Karimi & Mohadeseh Rahbar, 2015. "A set covering approach for multi-depot train driver scheduling," Journal of Combinatorial Optimization, Springer, vol. 29(3), pages 636-654, April.
- Sato, Keisuke & Fukumura, Naoto, 2012. "Real-time freight locomotive rescheduling and uncovered train detection during disruption," European Journal of Operational Research, Elsevier, vol. 221(3), pages 636-648.
- Sels, P. & Dewilde, T. & Cattrysse, D. & Vansteenwegen, P., 2016. "Reducing the passenger travel time in practice by the automated construction of a robust railway timetable," Transportation Research Part B: Methodological, Elsevier, vol. 84(C), pages 124-156.
More about this item
Keywords
railway crew planning; vehicle and crew scheduling; partial integration; tome windows; branch-and-price;All these keywords.
NEP fields
This paper has been announced in the following NEP Reports:- NEP-CMP-2014-05-24 (Computational Economics)
- NEP-TRE-2014-05-24 (Transport Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ems:eureir:51318. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: RePub (email available below). General contact details of provider: https://edirc.repec.org/data/feeurnl.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.