IDEAS home Printed from https://ideas.repec.org/a/inm/ortrsc/v39y2005i4p491-502.html
   My bibliography  Save this article

Multiple-Depot Integrated Vehicle and Crew Scheduling

Author

Listed:
  • Dennis Huisman

    (Erasmus Center for Optimization in Public Transport (ECOPT) and Econometric Institute, Erasmus University Rotterdam, P.O. Box 1738, NL-3000 DR Rotterdam, The Netherlands)

  • Richard Freling

    (Erasmus Center for Optimization in Public Transport (ECOPT) and Econometric Institute, Erasmus University Rotterdam, P.O. Box 1738, NL-3000 DR Rotterdam, The Netherlands)

  • Albert P. M. Wagelmans

    (Erasmus Center for Optimization in Public Transport (ECOPT) and Econometric Institute, Erasmus University Rotterdam, P.O. Box 1738, NL-3000 DR Rotterdam, The Netherlands)

Abstract

This paper presents two different models and algorithms for integrated vehicle and crew scheduling in the multiple-depot case. The algorithms are both based on a combination of column generation and Lagrangian relaxation.Furthermore, we compare those integrated approaches with each other and with the traditional sequential one on randomly generated, as well as real-world, data instances for a suburban/extraurban mass transit system. To simulate such a transit system, we propose a new way of randomly generating data instances such that their properties are the same as for our real-world instances.

Suggested Citation

  • Dennis Huisman & Richard Freling & Albert P. M. Wagelmans, 2005. "Multiple-Depot Integrated Vehicle and Crew Scheduling," Transportation Science, INFORMS, vol. 39(4), pages 491-502, November.
  • Handle: RePEc:inm:ortrsc:v:39:y:2005:i:4:p:491-502
    DOI: 10.1287/trsc.1040.0104
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/trsc.1040.0104
    Download Restriction: no

    File URL: https://libkey.io/10.1287/trsc.1040.0104?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Mauro Dell'Amico & Matteo Fischetti & Paolo Toth, 1993. "Heuristic Algorithms for the Multiple Depot Vehicle Scheduling Problem," Management Science, INFORMS, vol. 39(1), pages 115-125, January.
    2. Matteo Fischetti & Silvano Martello & Paolo Toth, 1989. "The Fixed Job Schedule Problem with Working-Time Constraints," Operations Research, INFORMS, vol. 37(3), pages 395-403, June.
    3. Jean-François Cordeau & Goran Stojković & François Soumis & Jacques Desrosiers, 2001. "Benders Decomposition for Simultaneous Aircraft Routing and Crew Scheduling," Transportation Science, INFORMS, vol. 35(4), pages 375-388, November.
    4. Freling, R. & Huisman, D. & Wagelmans, A.P.M., 2000. "Models and algorithms for Integration of Vehicle and Crew Scheduling," ERIM Report Series Research in Management ERS-2000-14-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    5. Diego Klabjan & Ellis L. Johnson & George L. Nemhauser & Eric Gelman & Srini Ramaswamy, 2002. "Airline Crew Scheduling with Time Windows and Plane-Count Constraints," Transportation Science, INFORMS, vol. 36(3), pages 337-348, August.
    6. Freling, R. & Huisman, D. & Wagelmans, A.P.M., 2000. "Applying an Integrated Approach to Vehicle and Crew Scheduling in Practice," ERIM Report Series Research in Management ERS-2000-31-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    7. Dennis Huisman & Richard Freling & Albert P. M. Wagelmans, 2004. "A Robust Solution Approach to the Dynamic Vehicle Scheduling Problem," Transportation Science, INFORMS, vol. 38(4), pages 447-458, November.
    8. Knut Haase & Guy Desaulniers & Jacques Desrosiers, 2001. "Simultaneous Vehicle and Crew Scheduling in Urban Mass Transit Systems," Transportation Science, INFORMS, vol. 35(3), pages 286-303, August.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ingmar Steinzen & Vitali Gintner & Leena Suhl & Natalia Kliewer, 2010. "A Time-Space Network Approach for the Integrated Vehicle- and Crew-Scheduling Problem with Multiple Depots," Transportation Science, INFORMS, vol. 44(3), pages 367-382, August.
    2. Huisman, Dennis & Wagelmans, Albert P.M., 2006. "A solution approach for dynamic vehicle and crew scheduling," European Journal of Operational Research, Elsevier, vol. 172(2), pages 453-471, July.
    3. Zäpfel, Günther & Bögl, Michael, 2008. "Multi-period vehicle routing and crew scheduling with outsourcing options," International Journal of Production Economics, Elsevier, vol. 113(2), pages 980-996, June.
    4. Hollis, B.L. & Forbes, M.A. & Douglas, B.E., 2006. "Vehicle routing and crew scheduling for metropolitan mail distribution at Australia Post," European Journal of Operational Research, Elsevier, vol. 173(1), pages 133-150, August.
    5. Markó Horváth & Tamás Kis, 2019. "Computing strong lower and upper bounds for the integrated multiple-depot vehicle and crew scheduling problem with branch-and-price," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 27(1), pages 39-67, March.
    6. Asvin Goel & Thibaut Vidal, 2014. "Hours of Service Regulations in Road Freight Transport: An Optimization-Based International Assessment," Transportation Science, INFORMS, vol. 48(3), pages 391-412, August.
    7. Rivi Sandhu & Diego Klabjan, 2007. "Integrated Airline Fleeting and Crew-Pairing Decisions," Operations Research, INFORMS, vol. 55(3), pages 439-456, June.
    8. M E T Horn & H Jiang & P Kilby, 2007. "Scheduling patrol boats and crews for the Royal Australian Navy," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(10), pages 1284-1293, October.
    9. Asvin Goel, 2010. "Truck Driver Scheduling in the European Union," Transportation Science, INFORMS, vol. 44(4), pages 429-441, November.
    10. Oliver Faust & Jochen Gönsch & Robert Klein, 2017. "Demand-Oriented Integrated Scheduling for Point-to-Point Airlines," Transportation Science, INFORMS, vol. 51(1), pages 196-213, February.
    11. Hanif D. Sherali & Ki-Hwan Bae & Mohamed Haouari, 2013. "An Integrated Approach for Airline Flight Selection and Timing, Fleet Assignment, and Aircraft Routing," Transportation Science, INFORMS, vol. 47(4), pages 455-476, November.
    12. Zhe Liang & Wanpracha Art Chaovalitwongse, 2013. "A Network-Based Model for the Integrated Weekly Aircraft Maintenance Routing and Fleet Assignment Problem," Transportation Science, INFORMS, vol. 47(4), pages 493-507, November.
    13. Valentina Cacchiani & Juan-José Salazar-González, 2017. "Optimal Solutions to a Real-World Integrated Airline Scheduling Problem," Transportation Science, INFORMS, vol. 51(1), pages 250-268, February.
    14. Michelle Dunbar & Gary Froyland & Cheng-Lung Wu, 2012. "Robust Airline Schedule Planning: Minimizing Propagated Delay in an Integrated Routing and Crewing Framework," Transportation Science, INFORMS, vol. 46(2), pages 204-216, May.
    15. Sherali, Hanif D. & Bish, Ebru K. & Zhu, Xiaomei, 2006. "Airline fleet assignment concepts, models, and algorithms," European Journal of Operational Research, Elsevier, vol. 172(1), pages 1-30, July.
    16. Chris Martin & David Jones & Pinar Keskinocak, 2003. "Optimizing On-Demand Aircraft Schedules for Fractional Aircraft Operators," Interfaces, INFORMS, vol. 33(5), pages 22-35, October.
    17. Sarac, Abdulkadir & Batta, Rajan & Rump, Christopher M., 2006. "A branch-and-price approach for operational aircraft maintenance routing," European Journal of Operational Research, Elsevier, vol. 175(3), pages 1850-1869, December.
    18. Huisman, D. & Jans, R.F. & Peeters, M. & Wagelmans, A.P.M., 2003. "Combining Column Generation and Lagrangian Relaxation," ERIM Report Series Research in Management ERS-2003-092-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    19. Sebastian Ruther & Natashia Boland & Faramroze G. Engineer & Ian Evans, 2017. "Integrated Aircraft Routing, Crew Pairing, and Tail Assignment: Branch-and-Price with Many Pricing Problems," Transportation Science, INFORMS, vol. 51(1), pages 177-195, February.
    20. Atoosa Kasirzadeh & Mohammed Saddoune & François Soumis, 2017. "Airline crew scheduling: models, algorithms, and data sets," EURO Journal on Transportation and Logistics, Springer;EURO - The Association of European Operational Research Societies, vol. 6(2), pages 111-137, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ortrsc:v:39:y:2005:i:4:p:491-502. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.