IDEAS home Printed from https://ideas.repec.org/a/wly/riskan/v35y2015i2p252-264.html
   My bibliography  Save this article

Quantifying Flood Risks in the Netherlands

Author

Listed:
  • R. B. Jongejan
  • B. Maaskant

Abstract

The Flood Risk in the Netherlands project (Dutch acronym: VNK2) is a large‐scale probabilistic risk assessment for all major levee systems in the Netherlands. This article provides an overview of the methods and techniques used in the VNK2 project. It also discusses two examples that illustrate the potential of quantitative flood risk assessments such as VNK2 to improve flood risk management processes: (i) informing political debates about the risks of flooding and the effectiveness of risk management actions, and (ii) (re)directing research efforts towards important sources of uncertainty.

Suggested Citation

  • R. B. Jongejan & B. Maaskant, 2015. "Quantifying Flood Risks in the Netherlands," Risk Analysis, John Wiley & Sons, vol. 35(2), pages 252-264, February.
  • Handle: RePEc:wly:riskan:v:35:y:2015:i:2:p:252-264
    DOI: 10.1111/risa.12285
    as

    Download full text from publisher

    File URL: https://doi.org/10.1111/risa.12285
    Download Restriction: no

    File URL: https://libkey.io/10.1111/risa.12285?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Stanley Kaplan & B. John Garrick, 1981. "On The Quantitative Definition of Risk," Risk Analysis, John Wiley & Sons, vol. 1(1), pages 11-27, March.
    2. Aven, Terje & Zio, Enrico, 2011. "Some considerations on the treatment of uncertainties in risk assessment for practical decision making," Reliability Engineering and System Safety, Elsevier, vol. 96(1), pages 64-74.
    3. Zio, E., 2009. "Reliability engineering: Old problems and new challenges," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 125-141.
    4. Sebastiaan N. Jonkman & Ruben Jongejan & Bob Maaskant, 2011. "The Use of Individual and Societal Risk Criteria Within the Dutch Flood Safety Policy—Nationwide Estimates of Societal Risk and Policy Applications," Risk Analysis, John Wiley & Sons, vol. 31(2), pages 282-300, February.
    5. van Manen, Sipke E. & Brinkhuis, Martine, 2005. "Quantitative flood risk assessment for Polders," Reliability Engineering and System Safety, Elsevier, vol. 90(2), pages 229-237.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alessio Ciullo & Jan H. Kwakkel & Karin M. De Bruijn & Neelke Doorn & Frans Klijn, 2020. "Efficient or Fair? Operationalizing Ethical Principles in Flood Risk Management: A Case Study on the Dutch‐German Rhine," Risk Analysis, John Wiley & Sons, vol. 40(9), pages 1844-1862, September.
    2. Rongen, G. & Morales-Nápoles, O. & Kok, M., 2022. "Expert judgment-based reliability analysis of the Dutch flood defense system," Reliability Engineering and System Safety, Elsevier, vol. 224(C).
    3. Valentina Ferretti & Gilberto Montibeller, 2019. "An Integrated Framework for Environmental Multi‐Impact Spatial Risk Analysis," Risk Analysis, John Wiley & Sons, vol. 39(1), pages 257-273, January.
    4. Jongejan, R.B. & Diermanse, F. & Kanning, W. & Bottema, M., 2020. "Reliability-based partial factors for flood defenses," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
    5. Chengguang Lai & Xiaohong Chen & Zhaoli Wang & Haijun Yu & Xiaoyan Bai, 2020. "Flood Risk Assessment and Regionalization from Past and Future Perspectives at Basin Scale," Risk Analysis, John Wiley & Sons, vol. 40(7), pages 1399-1417, July.
    6. Zongzhi Wang & Jingjing Wu & Liang Cheng & Kelin Liu & Yi-Ming Wei, 2018. "Regional flood risk assessment via coupled fuzzy c-means clustering methods: an empirical analysis from China’s Huaihe River Basin," Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, Springer;International Society for the Prevention and Mitigation of Natural Hazards, vol. 93(2), pages 803-822, September.
    7. Klerk, Wouter Jan & Kanning, Wim & Kok, Matthijs & Wolfert, Rogier, 2021. "Optimal planning of flood defence system reinforcements using a greedy search algorithm," Reliability Engineering and System Safety, Elsevier, vol. 207(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Zio, E., 2018. "The future of risk assessment," Reliability Engineering and System Safety, Elsevier, vol. 177(C), pages 176-190.
    2. Amro Nasr & Oskar Larsson Ivanov & Ivar Björnsson & Jonas Johansson & Dániel Honfi, 2021. "Towards a Conceptual Framework for Built Infrastructure Design in an Uncertain Climate: Challenges and Research Needs," Sustainability, MDPI, vol. 13(21), pages 1-19, October.
    3. Ibsen Chivatá Cárdenas & Saad S.H. Al‐Jibouri & Johannes I.M. Halman & Frits A. van Tol, 2014. "Modeling Risk‐Related Knowledge in Tunneling Projects," Risk Analysis, John Wiley & Sons, vol. 34(2), pages 323-339, February.
    4. Baraldi, Piero & Podofillini, Luca & Mkrtchyan, Lusine & Zio, Enrico & Dang, Vinh N., 2015. "Comparing the treatment of uncertainty in Bayesian networks and fuzzy expert systems used for a human reliability analysis application," Reliability Engineering and System Safety, Elsevier, vol. 138(C), pages 176-193.
    5. Tim Bedford, 2013. "Decision Making for Group Risk Reduction: Dealing with Epistemic Uncertainty," Risk Analysis, John Wiley & Sons, vol. 33(10), pages 1884-1898, October.
    6. Johansson, Jonas & Hassel, Henrik & Zio, Enrico, 2013. "Reliability and vulnerability analyses of critical infrastructures: Comparing two approaches in the context of power systems," Reliability Engineering and System Safety, Elsevier, vol. 120(C), pages 27-38.
    7. Hu, Lunhu & Kang, Rui & Pan, Xing & Zuo, Dujun, 2020. "Risk assessment of uncertain random system—Level-1 and level-2 joint propagation of uncertainty and probability in fault tree analysis," Reliability Engineering and System Safety, Elsevier, vol. 198(C).
    8. Ibsen Chivatá Cárdenas & Saad S.H. Al‐jibouri & Johannes I.M. Halman & Frits A. van Tol, 2013. "Capturing and Integrating Knowledge for Managing Risks in Tunnel Works," Risk Analysis, John Wiley & Sons, vol. 33(1), pages 92-108, January.
    9. Konstantinos Kazaras & Konstantinos Kirytopoulos, 2014. "Challenges for current quantitative risk assessment (QRA) models to describe explicitly the road tunnel safety level," Journal of Risk Research, Taylor & Francis Journals, vol. 17(8), pages 953-968, September.
    10. Ruipeng Tong & Cunli Zhai & Qingli Jia & Chunlin Wu & Yan Liu & Surui Xue, 2018. "An Interactive Model among Potential Human Risk Factors: 331 Cases of Coal Mine Roof Accidents in China," IJERPH, MDPI, vol. 15(6), pages 1-20, June.
    11. Nguyen, Son & Chen, Peggy Shu-Ling & Du, Yuquan & Thai, Vinh V., 2021. "An Operational Risk Analysis Model for Container Shipping Systems considering Uncertainty Quantification," Reliability Engineering and System Safety, Elsevier, vol. 209(C).
    12. Gundula Glowka & Andreas Kallmünzer & Anita Zehrer, 2021. "Enterprise risk management in small and medium family enterprises: the role of family involvement and CEO tenure," International Entrepreneurship and Management Journal, Springer, vol. 17(3), pages 1213-1231, September.
    13. Benischke, Mirko H. & Guldiken, Orhun & Doh, Jonathan P. & Martin, Geoffrey & Zhang, Yanze, 2022. "Towards a behavioral theory of MNC response to political risk and uncertainty: The role of CEO wealth at risk," Journal of World Business, Elsevier, vol. 57(1).
    14. Asadzadeh, S.M. & Azadeh, A., 2014. "An integrated systemic model for optimization of condition-based maintenance with human error," Reliability Engineering and System Safety, Elsevier, vol. 124(C), pages 117-131.
    15. Rajkumar Bhimgonda Patil & Basavraj S Kothavale & Laxman Yadu Waghmode, 2019. "Selection of time-to-failure model for computerized numerical control turning center based on the assessment of trends in maintenance data," Journal of Risk and Reliability, , vol. 233(2), pages 105-117, April.
    16. S. Cucurachi & E. Borgonovo & R. Heijungs, 2016. "A Protocol for the Global Sensitivity Analysis of Impact Assessment Models in Life Cycle Assessment," Risk Analysis, John Wiley & Sons, vol. 36(2), pages 357-377, February.
    17. Giuliano Di Baldassarre & Attilio Castellarin & Alberto Montanari & Armando Brath, 2009. "Probability-weighted hazard maps for comparing different flood risk management strategies: a case study," Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, Springer;International Society for the Prevention and Mitigation of Natural Hazards, vol. 50(3), pages 479-496, September.
    18. K. Karthikeyan & S. Bharath & K. Ranjith Kumar, 2012. "An Empirical Study on Investors’ Perception towards Mutual Fund Products through Banks with Reference to Tiruchirapalli City, Tamil Nadu," Vision, , vol. 16(2), pages 101-108, June.
    19. Nicola Paltrinieri & Nicolas Dechy & Ernesto Salzano & Mike Wardman & Valerio Cozzani, 2012. "Lessons Learned from Toulouse and Buncefield Disasters: From Risk Analysis Failures to the Identification of Atypical Scenarios Through a Better Knowledge Management," Risk Analysis, John Wiley & Sons, vol. 32(8), pages 1404-1419, August.
    20. Louis Anthony (Tony) Cox, Jr., 2012. "Community Resilience and Decision Theory Challenges for Catastrophic Events," Risk Analysis, John Wiley & Sons, vol. 32(11), pages 1919-1934, November.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:riskan:v:35:y:2015:i:2:p:252-264. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1111/(ISSN)1539-6924 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.