Integrated maintenance and spare part optimization for moving assets
Author
Abstract
Suggested Citation
DOI: 10.1080/24725854.2017.1312037
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Geert-Jan van Houtum & Bram Kranenburg, 2015. "Spare Parts Inventory Control under System Availability Constraints," International Series in Operations Research and Management Science, Springer, edition 127, number 978-1-4899-7609-3, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Dursun, İpek & Akcay, Alp & van Houtum, Geert-Jan, 2024. "How good must failure predictions be to make local spare parts stock superfluous?," International Journal of Production Economics, Elsevier, vol. 267(C).
- Wakiru, James M. & Pintelon, Liliane & Muchiri, Peter N. & Chemweno, Peter K., 2019. "A simulation-based optimization approach evaluating maintenance and spare parts demand interaction effects," International Journal of Production Economics, Elsevier, vol. 208(C), pages 329-342.
- Barlow, E. & Bedford, T. & Revie, M. & Tan, J. & Walls, L., 2021. "A performance-centred approach to optimising maintenance of complex systems," European Journal of Operational Research, Elsevier, vol. 292(2), pages 579-595.
- Sun, Mingyao & Ng, Chi To & Wu, Feng & Cheng, T.C.E., 2022. "Optimization of after-sales services with spare parts consumption and repairman travel," International Journal of Production Economics, Elsevier, vol. 244(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Qin, Xuwei & Shao, Lusheng & Jiang, Zhong-Zhong, 2020. "Contract design for equipment after-sales service with business interruption insurance," European Journal of Operational Research, Elsevier, vol. 284(1), pages 176-187.
- Driessen, M.A. & van Houtum, G.J. & Zijm, W.H.M. & Rustenburg, W.D., 2020. "Capacity assignment in repair shops with high material uncertainty," International Journal of Production Economics, Elsevier, vol. 221(C).
- Christiane B. Haubitz & Ulrich W. Thonemann, 2021. "How to Change a Running System—Controlling the Transition to Optimized Spare Parts Inventory Policies," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1386-1405, May.
- Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
- Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Zheng, Meimei & Ye, Hongqing & Wang, Dong & Pan, Ershun, 2021. "Joint Optimization of Condition-Based Maintenance and Spare Parts Orders for Multi-Unit Systems with Dual Sourcing," Reliability Engineering and System Safety, Elsevier, vol. 210(C).
- S. Rahimi-Ghahroodi & A. Al Hanbali & W. H. M. Zijm & J. K. W. Ommeren & A. Sleptchenko, 2017. "Integrated planning of spare parts and service engineers with partial backlogging," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 711-748, July.
- Behfard, S. & Al Hanbali, A. & van der Heijden, M.C. & Zijm, W.H.M., 2018. "Last Time Buy and repair decisions for fast moving parts," International Journal of Production Economics, Elsevier, vol. 197(C), pages 158-173.
- N. Knofius & M. C. Heijden & A. Sleptchenko & W. H. M. Zijm, 2021. "Improving effectiveness of spare parts supply by additive manufacturing as dual sourcing option," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(1), pages 189-221, March.
- Topan, E. & van der Heijden, M.C., 2020. "Operational level planning of a multi-item two-echelon spare parts inventory system with reactive and proactive interventions," European Journal of Operational Research, Elsevier, vol. 284(1), pages 164-175.
- Kouki, Chaaben & Arts, Joachim & Babai, M. Zied, 2024. "Performance evaluation of a two-echelon inventory system with network lost sales," European Journal of Operational Research, Elsevier, vol. 314(2), pages 647-664.
- van Wingerden, E. & Tan, T. & Van Houtum, G.J., 2019. "The impact of an emergency warehouse in a two-echelon spare parts network," European Journal of Operational Research, Elsevier, vol. 276(3), pages 983-997.
- Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
- Yahel Giat, 2024. "Stock Levels and Repair Sourcing in a Periodic Review Exchangeable Item Repair System," Logistics, MDPI, vol. 8(2), pages 1-19, March.
- Knofius, N. & van der Heijden, M.C. & Zijm, W.H.M., 2019. "Consolidating spare parts for asset maintenance with additive manufacturing," International Journal of Production Economics, Elsevier, vol. 208(C), pages 269-280.
- Westerweel, Bram & Basten, Rob J.I. & van Houtum, Geert-Jan, 2018. "Traditional or Additive Manufacturing? Assessing Component Design Options through Lifecycle Cost Analysis," European Journal of Operational Research, Elsevier, vol. 270(2), pages 570-585.
- Sleptchenko, Andrei & Turan, Hasan Hüseyin & Pokharel, Shaligram & ElMekkawy, Tarek Y., 2019. "Cross-training policies for repair shops with spare part inventories," International Journal of Production Economics, Elsevier, vol. 209(C), pages 334-345.
- Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
- Akl, Amany M. & El Sawah, Sondoss & Chakrabortty, Ripon K. & Turan, Hasan Hüseyin, 2022. "A Joint Optimization of Strategic Workforce Planning and Preventive Maintenance Scheduling: A Simulation–Optimization Approach," Reliability Engineering and System Safety, Elsevier, vol. 219(C).
- Loe Schlicher & Marco Slikker & Geert‐Jan van Houtum, 2017. "Probabilistic resource pooling games," Naval Research Logistics (NRL), John Wiley & Sons, vol. 64(7), pages 531-546, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uiiexx:v:50:y:2018:i:3:p:230-245. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/uiie .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.