How good must failure predictions be to make local spare parts stock superfluous?
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2023.109060
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Saif Benjaafar & William L. Cooper & Setareh Mardan, 2011. "Production‐inventory systems with imperfect advance demand information and updating," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(2), pages 88-106, March.
- Tan, Tarkan & Gullu, Refik & Erkip, Nesim, 2007. "Modelling imperfect advance demand information and analysis of optimal inventory policies," European Journal of Operational Research, Elsevier, vol. 177(2), pages 897-923, March.
- Akcay, Alp, 2022. "An alert-assisted inspection policy for a production process with imperfect condition signals," European Journal of Operational Research, Elsevier, vol. 298(2), pages 510-525.
- Basten, Rob J.I. & Ryan, Jennifer K., 2019. "The value of maintenance delay flexibility for improved spare parts inventory management," European Journal of Operational Research, Elsevier, vol. 278(2), pages 646-657.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Tortorella, Guilherme Luz & Fogliatto, Flavio S. & Cauchick-Miguel, Paulo A. & Kurnia, Sherah & Jurburg, Daniel, 2021. "Integration of Industry 4.0 technologies into Total Productive Maintenance practices," International Journal of Production Economics, Elsevier, vol. 240(C).
- Berrade, M.D. & Scarf, P.A. & Cavalcante, C.A.V. & Dwight, R.A., 2013. "Imperfect inspection and replacement of a system with a defective state: A cost and reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 120(C), pages 80-87.
- Jing‐Sheng Song & Paul H. Zipkin, 2012. "Newsvendor problems with sequentially revealed demand information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(8), pages 601-612, December.
- Jiachen Shi & Heraldo Rozas & Murat Yildirim & Nagi Gebraeel, 2023. "A stochastic programming model for jointly optimizing maintenance and spare parts inventory for IoT applications," IISE Transactions, Taylor & Francis Journals, vol. 55(4), pages 419-431, April.
- Thonemann, U. W., 2002. "Improving supply-chain performance by sharing advance demand information," European Journal of Operational Research, Elsevier, vol. 142(1), pages 81-107, October.
- Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
- Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Vinayak Deshpande & Ananth V. Iyer & Richard Cho, 2006. "Efficient Supply Chain Management at the U.S. Coast Guard Using Part-Age Dependent Supply Replenishment Policies," Operations Research, INFORMS, vol. 54(6), pages 1028-1040, December.
- KarabaÄŸ, Oktay & Eruguz, Ayse Sena & Basten, Rob, 2020. "Integrated optimization of maintenance interventions and spare part selection for a partially observable multi-component system," Reliability Engineering and System Safety, Elsevier, vol. 200(C).
- Tortorella, Guilherme Luz & Saurin, Tarcisio A. & Hines, Peter & Antony, Jiju & Samson, Daniel, 2023. "Myths and facts of industry 4.0," International Journal of Production Economics, Elsevier, vol. 255(C).
- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Ayse Sena Eruguz & Tarkan Tan & Geert-Jan van Houtum, 2018. "Integrated maintenance and spare part optimization for moving assets," IISE Transactions, Taylor & Francis Journals, vol. 50(3), pages 230-245, March.
- Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
- van Donselaar, Karel & Rock Kopczak, Laura & Wouters, Marc, 2001. "The use of advance demand information in a project-based supply chain," European Journal of Operational Research, Elsevier, vol. 130(3), pages 519-538, May.
- Tan, Tarkan & Güllü, Refik & Erkip, Nesim, 2009. "Using imperfect advance demand information in ordering and rationing decisions," International Journal of Production Economics, Elsevier, vol. 121(2), pages 665-677, October.
- Engin Topan & Tarkan Tan & Geert-Jan van Houtum & Rommert Dekker, 2018. "Using imperfect advance demand information in lost-sales inventory systems with the option of returning inventory," IISE Transactions, Taylor & Francis Journals, vol. 50(3), pages 246-264, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Oguzhan Vicil, 2021. "Optimizing stock levels for service-differentiated demand classes with inventory rationing and demand lead times," Flexible Services and Manufacturing Journal, Springer, vol. 33(2), pages 381-424, June.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Feng, Haofang & Zhang, Sheng Hao & Zhang, Yong, 2023. "Managing production-inventory-maintenance systems with condition monitoring," European Journal of Operational Research, Elsevier, vol. 310(2), pages 698-711.
- Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
- Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
- Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
- Choi, Tsan-Ming & Sethi, Suresh, 2010. "Innovative quick response programs: A review," International Journal of Production Economics, Elsevier, vol. 127(1), pages 1-12, September.
- Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
- Mohammed Hichame Benbitour & Evren Sahin, 2015. "Evaluation of the Impact of Uncertain Advance Demand Information on Production/Inventory Systems," Post-Print hal-01199290, HAL.
- Van der Auweraer, Sarah & Zhu, Sha & Boute, Robert N., 2021. "The value of installed base information for spare part inventory control," International Journal of Production Economics, Elsevier, vol. 239(C).
- Alım, Muzaffer & Beullens, Patrick, 2022. "Improving inventory system performance by selective purchasing of buyers’ willingness to wait," European Journal of Operational Research, Elsevier, vol. 300(1), pages 124-136.
- Tan, Tarkan & Güllü, Refik & Erkip, Nesim, 2009. "Using imperfect advance demand information in ordering and rationing decisions," International Journal of Production Economics, Elsevier, vol. 121(2), pages 665-677, October.
- Sun, Mingyao & Ng, Chi To & Wu, Feng & Cheng, T.C.E., 2022. "Optimization of after-sales services with spare parts consumption and repairman travel," International Journal of Production Economics, Elsevier, vol. 244(C).
- Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
- Awi Federgruen & Min Wang, 2015. "Inventory Models with Shelf-Age and Delay-Dependent Inventory Costs," Operations Research, INFORMS, vol. 63(3), pages 701-715, June.
- Dursun, İpek & Grishina, Anastasiia & Akcay, Alp & van Houtum, Geert-Jan, 2024. "Spare parts recommendation for corrective maintenance of capital goods considering demand dependency," European Journal of Operational Research, Elsevier, vol. 318(1), pages 71-86.
- Akcay, Alp, 2022. "An alert-assisted inspection policy for a production process with imperfect condition signals," European Journal of Operational Research, Elsevier, vol. 298(2), pages 510-525.
- Fleuren, Tijn & Merzifonluoglu, Yasemin & Geunes, Joseph & Sotirov, Renata, 2024. "Integrated customer portfolio selection and procurement quantity planning for a supplier," Omega, Elsevier, vol. 128(C).
- Tan, Tarkan & Gullu, Refik & Erkip, Nesim, 2007. "Modelling imperfect advance demand information and analysis of optimal inventory policies," European Journal of Operational Research, Elsevier, vol. 177(2), pages 897-923, March.
More about this item
Keywords
Spare parts; Failure predictions; Prediction accuracy; Demand lead time;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:267:y:2024:i:c:s092552732300292x. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.