IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v30y1984i3p368-380.html
   My bibliography  Save this article

A Study of Production Smoothing in a Job Shop Environment

Author

Listed:
  • Allan B. Cruickshanks

    (Rolm Corp., Austin, Texas)

  • Robert D. Drescher

    (Rolm Corp., Austin, Texas)

  • Stephen C. Graves

    (Massachusetts Institute of Technology)

Abstract

We consider the problem of smoothing production in a job shop in which all production is to customer order and the demand process is a stationary stochastic process. We present an approach to production smoothing based on the concept of a planning window. A planning window is the difference between the promised delivery time and the planned production time for a product. It represents the degree of flexibility available for planning the production of committed orders. We characterize the production smoothing benefits for a range of planning windows by means of an approximate analytic model and a simulation study. These analyses show that substantial smoothing benefits result from small changes in the length of the planning window. We discuss the implementation of the production smoothing approach and illustrate this implementation with an industrial case study that was the motivation for this work.

Suggested Citation

  • Allan B. Cruickshanks & Robert D. Drescher & Stephen C. Graves, 1984. "A Study of Production Smoothing in a Job Shop Environment," Management Science, INFORMS, vol. 30(3), pages 368-380, March.
  • Handle: RePEc:inm:ormnsc:v:30:y:1984:i:3:p:368-380
    DOI: 10.1287/mnsc.30.3.368
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.30.3.368
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.30.3.368?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Scott Webster & Z. Kevin Weng, 2001. "Improving Repetitive Manufacturing Systems: Model and Insights," Operations Research, INFORMS, vol. 49(1), pages 99-106, February.
    2. Graves, Stephen C., 1984. "Operational analysis of a job shop," Working papers 1552-84., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    3. Rong Yuan & Stephen C. Graves, 2016. "Setting optimal production lot sizes and planned lead times in a job shop," International Journal of Production Research, Taylor & Francis Journals, vol. 54(20), pages 6105-6120, October.
    4. Graves, Stephen C., 1985. "Determining the spares and staffing level for a repair depot," Working papers 1699-85., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    5. Anantaram Balakrishnan & Joseph Geunes & Michael S. Pangburn, 2004. "Coordinating Supply Chains by Controlling Upstream Variability Propagation," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 163-183, July.
    6. Graves, Stephen C. & Meal, Harlan C. & Dasu, Sririam. & Qui, Yuping., 1985. "Two-stage production planning in a dynamic environment," Working papers 1698-85., Massachusetts Institute of Technology (MIT), Sloan School of Management.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:30:y:1984:i:3:p:368-380. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.