Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
Author
Abstract
Suggested Citation
DOI: 10.1007/s10951-019-00601-1
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Alexander Grigoriev & Martijn Holthuijsen & Joris van de Klundert, 2005. "Basic scheduling problems with raw material constraints," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 527-535, September.
- Slowinski, Roman, 1984. "Preemptive scheduling of independent jobs on parallel machines subject to financial constraints," European Journal of Operational Research, Elsevier, vol. 15(3), pages 366-373, March.
- Gafarov, Evgeny R. & Lazarev, Alexander A. & Werner, Frank, 2011. "Single machine scheduling problems with financial resource constraints: Some complexity results and properties," Mathematical Social Sciences, Elsevier, vol. 62(1), pages 7-13, July.
- Györgyi, Péter & Kis, Tamás, 2017. "Approximation schemes for parallel machine scheduling with non-renewable resources," European Journal of Operational Research, Elsevier, vol. 258(1), pages 113-123.
- Péter Györgyi & Tamás Kis, 2015. "Approximability of scheduling problems with resource consuming jobs," Annals of Operations Research, Springer, vol. 235(1), pages 319-336, December.
- Wayne E. Smith, 1956. "Various optimizers for single‐stage production," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 3(1‐2), pages 59-66, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Matthias Bentert & Robert Bredereck & Péter Györgyi & Andrzej Kaczmarczyk & Rolf Niedermeier, 2023. "A multivariate complexity analysis of the material consumption scheduling problem," Journal of Scheduling, Springer, vol. 26(4), pages 369-382, August.
- Susumu Hashimoto & Shinji Mizuno, 2021. "A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource," Journal of Scheduling, Springer, vol. 24(3), pages 259-267, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Matthias Bentert & Robert Bredereck & Péter Györgyi & Andrzej Kaczmarczyk & Rolf Niedermeier, 2023. "A multivariate complexity analysis of the material consumption scheduling problem," Journal of Scheduling, Springer, vol. 26(4), pages 369-382, August.
- Györgyi, Péter & Kis, Tamás, 2017. "Approximation schemes for parallel machine scheduling with non-renewable resources," European Journal of Operational Research, Elsevier, vol. 258(1), pages 113-123.
- Péter Györgyi & Tamás Kis, 2015. "Approximability of scheduling problems with resource consuming jobs," Annals of Operations Research, Springer, vol. 235(1), pages 319-336, December.
- Susumu Hashimoto & Shinji Mizuno, 2021. "A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource," Journal of Scheduling, Springer, vol. 24(3), pages 259-267, June.
- Lidong Wu & Cong-Dian Cheng, 2016. "On single machine scheduling with resource constraint," Journal of Combinatorial Optimization, Springer, vol. 31(2), pages 491-505, February.
- Davari, Morteza & Ranjbar, Mohammad & De Causmaecker, Patrick & Leus, Roel, 2020. "Minimizing makespan on a single machine with release dates and inventory constraints," European Journal of Operational Research, Elsevier, vol. 286(1), pages 115-128.
- Marieke Quant & Marc Meertens & Hans Reijnierse, 2008.
"Processing games with shared interest,"
Annals of Operations Research, Springer, vol. 158(1), pages 219-228, February.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2004. "Processing Games with Shared Interest," Other publications TiSEM 016ac415-c70e-453f-acfb-a, Tilburg University, School of Economics and Management.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2008. "Processing games with shared interest," Other publications TiSEM e83018e2-d6fb-4829-b6eb-f, Tilburg University, School of Economics and Management.
- Quant, M. & Meertens, M. & Reijnierse, J.H., 2004. "Processing Games with Shared Interest," Discussion Paper 2004-126, Tilburg University, Center for Economic Research.
- José R. Correa & Maurice Queyranne, 2012. "Efficiency of equilibria in restricted uniform machine scheduling with total weighted completion time as social cost," Naval Research Logistics (NRL), John Wiley & Sons, vol. 59(5), pages 384-395, August.
- Ben Hermans & Roel Leus & Jannik Matuschke, 2022. "Exact and Approximation Algorithms for the Expanding Search Problem," INFORMS Journal on Computing, INFORMS, vol. 34(1), pages 281-296, January.
- Qiuping Yu & Gad Allon & Achal Bassamboo & Seyed Iravani, 2018. "Managing Customer Expectations and Priorities in Service Systems," Management Science, INFORMS, vol. 64(8), pages 3942-3970, August.
- Lili Liu & Guochun Tang & Baoqiang Fan & Xingpeng Wang, 2015. "Two-person cooperative games on scheduling problems in outpatient pharmacy dispensing process," Journal of Combinatorial Optimization, Springer, vol. 30(4), pages 938-948, November.
- van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021.
"Cooperation and Competition in Linear Production and Sequencing Processes,"
Discussion Paper
2021-011, Tilburg University, Center for Economic Research.
- van Beek, Andries & Malmberg, Benjamin & Borm, Peter & Quant, Marieke & Schouten, Jop, 2021. "Cooperation and Competition in Linear Production and Sequencing Processes," Other publications TiSEM fd7a301b-7ef3-4142-835d-a, Tilburg University, School of Economics and Management.
- Gabriel Zayas‐Cabán & Emmett J. Lodree & David L. Kaufman, 2020. "Optimal Control of Parallel Queues for Managing Volunteer Convergence," Production and Operations Management, Production and Operations Management Society, vol. 29(10), pages 2268-2288, October.
- Kramer, Arthur & Dell’Amico, Mauro & Iori, Manuel, 2019. "Enhanced arc-flow formulations to minimize weighted completion time on identical parallel machines," European Journal of Operational Research, Elsevier, vol. 275(1), pages 67-79.
- Nicholas G. Hall & Marc E. Posner & Chris N. Potts, 2021. "Online production planning to maximize the number of on-time orders," Annals of Operations Research, Springer, vol. 298(1), pages 249-269, March.
- Bachtenkirch, David & Bock, Stefan, 2022. "Finding efficient make-to-order production and batch delivery schedules," European Journal of Operational Research, Elsevier, vol. 297(1), pages 133-152.
- Reijnierse, Hans & Borm, Peter & Quant, Marieke & Meertens, Marc, 2010.
"Processing games with restricted capacities,"
European Journal of Operational Research, Elsevier, vol. 202(3), pages 773-780, May.
- Meertens, M. & Borm, P.E.M. & Reijnierse, J.H. & Quant, M., 2004. "Processing Games with Restricted Capacities," Other publications TiSEM a769e434-b8c9-4116-8897-f, Tilburg University, School of Economics and Management.
- Meertens, M. & Borm, P.E.M. & Reijnierse, J.H. & Quant, M., 2004. "Processing Games with Restricted Capacities," Discussion Paper 2004-83, Tilburg University, Center for Economic Research.
- Xiangtong Qi, 2005. "A logistics scheduling model: Inventory cost reduction by batching," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(4), pages 312-320, June.
- Borm, Peter & Fiestras-Janeiro, Gloria & Hamers, Herbert & Sanchez, Estela & Voorneveld, Mark, 2002.
"On the convexity of games corresponding to sequencing situations with due dates,"
European Journal of Operational Research, Elsevier, vol. 136(3), pages 616-634, February.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 1999. "On the Convexity of Games Corresponding to Sequencing Situations with Due Dates," Other publications TiSEM 46a07ce4-57fe-4a08-bcb5-c, Tilburg University, School of Economics and Management.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 2002. "On the convexity of games corresponding to sequencing situations with due dates," Other publications TiSEM caf52141-b0aa-42ef-96ed-e, Tilburg University, School of Economics and Management.
- Borm, P.E.M. & Fiestras-Janeiro, G. & Hamers, H.J.M. & Sánchez, E. & Voorneveld, M., 1999. "On the Convexity of Games Corresponding to Sequencing Situations with Due Dates," Discussion Paper 1999-49, Tilburg University, Center for Economic Research.
- Rubing Chen & Jinjiang Yuan, 2020. "Single-machine scheduling of proportional-linearly deteriorating jobs with positional due indices," 4OR, Springer, vol. 18(2), pages 177-196, June.
More about this item
Keywords
Single-machine scheduling; Non-renewable resources; Approximation algorithms;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jsched:v:22:y:2019:i:6:d:10.1007_s10951-019-00601-1. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.