Approximation schemes for parallel machine scheduling with non-renewable resources
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2016.09.007
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Shabtay, Dvir & Kaspi, Moshe, 2006. "Parallel machine scheduling with a convex resource consumption function," European Journal of Operational Research, Elsevier, vol. 173(1), pages 92-107, August.
- Slowinski, Roman, 1984. "Preemptive scheduling of independent jobs on parallel machines subject to financial constraints," European Journal of Operational Research, Elsevier, vol. 15(3), pages 366-373, March.
- Gafarov, Evgeny R. & Lazarev, Alexander A. & Werner, Frank, 2011. "Single machine scheduling problems with financial resource constraints: Some complexity results and properties," Mathematical Social Sciences, Elsevier, vol. 62(1), pages 7-13, July.
- Sirdey, Renaud & Carlier, Jacques & Kerivin, Herve & Nace, Dritan, 2007. "On a resource-constrained scheduling problem with application to distributed systems reconfiguration," European Journal of Operational Research, Elsevier, vol. 183(2), pages 546-563, December.
- Péter Györgyi & Tamás Kis, 2015. "Approximability of scheduling problems with resource consuming jobs," Annals of Operations Research, Springer, vol. 235(1), pages 319-336, December.
- Herr, Oliver & Goel, Asvin, 2016. "Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints," European Journal of Operational Research, Elsevier, vol. 248(1), pages 123-135.
- Briskorn, Dirk & Choi, Byung-Cheon & Lee, Kangbok & Leung, Joseph & Pinedo, Michael, 2010. "Complexity of single machine scheduling subject to nonnegative inventory constraints," European Journal of Operational Research, Elsevier, vol. 207(2), pages 605-619, December.
- Klaus Neumann & Christoph Schwindt, 2003. "Project scheduling with inventory constraints," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 56(3), pages 513-533, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Matthias Bentert & Robert Bredereck & Péter Györgyi & Andrzej Kaczmarczyk & Rolf Niedermeier, 2023. "A multivariate complexity analysis of the material consumption scheduling problem," Journal of Scheduling, Springer, vol. 26(4), pages 369-382, August.
- Péter Györgyi & Tamás Kis, 2019. "Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints," Journal of Scheduling, Springer, vol. 22(6), pages 623-634, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Davari, Morteza & Ranjbar, Mohammad & De Causmaecker, Patrick & Leus, Roel, 2020. "Minimizing makespan on a single machine with release dates and inventory constraints," European Journal of Operational Research, Elsevier, vol. 286(1), pages 115-128.
- Matthias Bentert & Robert Bredereck & Péter Györgyi & Andrzej Kaczmarczyk & Rolf Niedermeier, 2023. "A multivariate complexity analysis of the material consumption scheduling problem," Journal of Scheduling, Springer, vol. 26(4), pages 369-382, August.
- Péter Györgyi & Tamás Kis, 2019. "Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints," Journal of Scheduling, Springer, vol. 22(6), pages 623-634, December.
- Péter Györgyi & Tamás Kis, 2015. "Approximability of scheduling problems with resource consuming jobs," Annals of Operations Research, Springer, vol. 235(1), pages 319-336, December.
- Susumu Hashimoto & Shinji Mizuno, 2021. "A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource," Journal of Scheduling, Springer, vol. 24(3), pages 259-267, June.
- Liu Guiqing & Li Kai & Cheng Bayi, 2015. "Preemptive Scheduling with Controllable Processing Times on Parallel Machines," Journal of Systems Science and Information, De Gruyter, vol. 3(1), pages 68-76, February.
- Sciau, Jean-Baptiste & Goyon, Agathe & Sarazin, Alexandre & Bascans, Jérémy & Prud’homme, Charles & Lorca, Xavier, 2024. "Using constraint programming to address the operational aircraft line maintenance scheduling problem," Journal of Air Transport Management, Elsevier, vol. 115(C).
- van der Beek, T. & Souravlias, D. & van Essen, J.T. & Pruyn, J. & Aardal, K., 2024. "Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources," European Journal of Operational Research, Elsevier, vol. 313(1), pages 92-111.
- Bahram Alidaee & Haibo Wang & R. Bryan Kethley & Frank Landram, 2019. "A unified view of parallel machine scheduling with interdependent processing rates," Journal of Scheduling, Springer, vol. 22(5), pages 499-515, October.
- Zhang, Haowei & Xie, Junwei & Ge, Jiaang & Zhang, Zhaojian & Zong, Binfeng, 2019. "A hybrid adaptively genetic algorithm for task scheduling problem in the phased array radar," European Journal of Operational Research, Elsevier, vol. 272(3), pages 868-878.
- Edis, Emrah B. & Oguz, Ceyda & Ozkarahan, Irem, 2013. "Parallel machine scheduling with additional resources: Notation, classification, models and solution methods," European Journal of Operational Research, Elsevier, vol. 230(3), pages 449-463.
- Saeid Rezaei & Amirsaman Kheirkhah, 2018. "A comprehensive approach in designing a sustainable closed-loop supply chain network using cross-docking operations," Computational and Mathematical Organization Theory, Springer, vol. 24(1), pages 51-98, March.
- Gehring, Marco & Volk, Rebekka & Schultmann, Frank, 2022. "On the integration of diverging material flows into resource‐constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1071-1087.
- Pei, Zhi & Lu, Haimin & Jin, Qingwei & Zhang, Lianmin, 2022. "Target-based distributionally robust optimization for single machine scheduling," European Journal of Operational Research, Elsevier, vol. 299(2), pages 420-431.
- T'kindt, V. & Billaut, J-C. & Proust, C., 2001. "Solving a bicriteria scheduling problem on unrelated parallel machines occurring in the glass bottle industry," European Journal of Operational Research, Elsevier, vol. 135(1), pages 42-49, November.
- Herr, Oliver & Goel, Asvin, 2016. "Minimising total tardiness for a single machine scheduling problem with family setups and resource constraints," European Journal of Operational Research, Elsevier, vol. 248(1), pages 123-135.
- Sandra Ulrich Ngueveu & Christian Artigues & Nabil Absi & Safia Kedad-Sidhoum, 2022. "Lower and upper bounds for scheduling energy-consuming tasks with storage resources and piecewise linear costs," Journal of Heuristics, Springer, vol. 28(1), pages 93-120, February.
- Nesello, Vitor & Subramanian, Anand & Battarra, Maria & Laporte, Gilbert, 2018. "Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 266(2), pages 498-507.
- Pei, Jun & Liu, Xinbao & Fan, Wenjuan & Pardalos, Panos M. & Lu, Shaojun, 2019. "A hybrid BA-VNS algorithm for coordinated serial-batching scheduling with deteriorating jobs, financial budget, and resource constraint in multiple manufacturers," Omega, Elsevier, vol. 82(C), pages 55-69.
- Wu, Xianyi & Zhou, Xian, 2008. "Stochastic scheduling to minimize expected maximum lateness," European Journal of Operational Research, Elsevier, vol. 190(1), pages 103-115, October.
More about this item
Keywords
Scheduling; Parallel machines; Non-renewable resources; Approximation schemes;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:258:y:2017:i:1:p:113-123. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.