Deadline-based incentive contracts in project management with cost salience
Author
Abstract
Suggested Citation
DOI: 10.1007/s10700-019-09302-y
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Christopher S. Tang & Kairen Zhang & Sean X. Zhou, 2015. "Incentive Contracts for Managing a Project with Uncertain Completion Time," Production and Operations Management, Production and Operations Management Society, vol. 24(12), pages 1945-1954, December.
- Wenqiang Xiao & Yi Xu, 2012. "The Impact of Royalty Contract Revision in a Multistage Strategic R&D Alliance," Management Science, INFORMS, vol. 58(12), pages 2251-2271, December.
- Tony Chen & Ted Klastorin & Michael R. Wagner, 2015. "Incentive Contracts in Serial Stochastic Projects," Manufacturing & Service Operations Management, INFORMS, vol. 17(3), pages 290-301, July.
- Akerlof, George A, 1991. "Procrastination and Obedience," American Economic Review, American Economic Association, vol. 81(2), pages 1-19, May.
- Juanjuan Zhang, 2016. "Deadlines in Product Development," Management Science, INFORMS, vol. 62(11), pages 3310-3326, November.
- Gibbons, Robert, 1987.
"Piece-Rate Incentive Schemes,"
Journal of Labor Economics, University of Chicago Press, vol. 5(4), pages 413-429, October.
- Robert Gibbons, 1986. "Piece-Rate Incentive Schemes," Working papers 424, Massachusetts Institute of Technology (MIT), Department of Economics.
- Ted O'Donoghue & Matthew Rabin, 1999.
"Incentives for Procrastinators,"
The Quarterly Journal of Economics, President and Fellows of Harvard College, vol. 114(3), pages 769-816.
- Ted O'Donoghue & Matthew Rabin, 1997. "Incentives for Procrastinators," Discussion Papers 1181, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
- Sunil Dutta, 2008. "Managerial Expertise, Private Information, and Pay-Performance Sensitivity," Management Science, INFORMS, vol. 54(3), pages 429-442, March.
- Dharma Kwon, H. & Lippman, Steven A. & Tang, Christopher S., 2010. "Optimal time-based and cost-based coordinated project contracts with unobservable work rates," International Journal of Production Economics, Elsevier, vol. 126(2), pages 247-254, August.
- Yaozhong Wu & Karthik Ramachandran & Vish Krishnan, 2014. "Managing Cost Salience and Procrastination in Projects: Compensation and Team Composition," Production and Operations Management, Production and Operations Management Society, vol. 23(8), pages 1299-1311, August.
- Keith Marzilli Ericson, 2017. "On the Interaction of Memory and Procrastination: Implications for Reminders, Deadlines, and Empirical Estimation," Journal of the European Economic Association, European Economic Association, vol. 15(3), pages 692-719.
- Zhihua Chen & Yanfei Lan & Ruiqing Zhao, 2018. "Impacts of risk attitude and outside option on compensation contracts under different information structures," Fuzzy Optimization and Decision Making, Springer, vol. 17(1), pages 13-47, March.
- Kerkhove, L.P. & Vanhoucke, M., 2016. "Incentive contract design for projects: The owner׳s perspective," Omega, Elsevier, vol. 62(C), pages 93-114.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Niu, Baozhuang & Zeng, Fanzhuo & Liu, Yaoqi, 2021. "Firms’ introduction of internet-based installment: Incremental demand vs. cash opportunity cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 152(C).
- Zhu, Kai & Ji, Kaiyuan & Shen, Jiayu, 2021. "A fixed charge transportation problem with damageable items under uncertain environment," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 581(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Nicholas G. Hall & Zhixin Liu, 2023. "Scheduling with present bias," Production and Operations Management, Production and Operations Management Society, vol. 32(6), pages 1743-1759, June.
- Morvarid Rahmani & Guillaume Roels & Uday S. Karmarkar, 2017. "Collaborative Work Dynamics in Projects with Co‐Production," Production and Operations Management, Production and Operations Management Society, vol. 26(4), pages 686-703, April.
- Morvarid Rahmani & Guillaume Roels & Uday S. Karmarkar, 2018. "Team Leadership and Performance: Combining the Roles of Direction and Contribution," Management Science, INFORMS, vol. 64(11), pages 5234-5249, November.
- Chen, Bo & Hall, Nicholas G., 2021. "Incentive schemes for resolving Parkinson’s Law in project management," European Journal of Operational Research, Elsevier, vol. 288(2), pages 666-681.
- Shivam Gupta & Anupam Agrawal & Jennifer K. Ryan, 2023. "Agile contracting: Managing incentives under uncertain needs," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 972-988, March.
- Bai, Jiaru & So, Kut C. & Tang, Christopher, 2016. "A queueing model for managing small projects under uncertainties," European Journal of Operational Research, Elsevier, vol. 253(3), pages 777-790.
- Shi Chen & Ted Klastorin & Michael R. Wagner, 2021. "Designing practical coordinating contracts in decentralized projects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 68(2), pages 183-198, March.
- Johannes Johnen, 2019.
"Automatic‐renewal contracts with heterogeneous consumer inertia,"
Journal of Economics & Management Strategy, Wiley Blackwell, vol. 28(4), pages 765-786, November.
- Johannes Johnen, 2019. "Automatic-renewal contracts with heterogeneous consumer inertia," LIDAM Reprints CORE 3017, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Lurås, Hilde, 2009. "A healthy lifestyle: The product of opportunities and preferences," HERO Online Working Paper Series 2001:11, University of Oslo, Health Economics Research Programme.
- O'Donoghue, Ted & Rabin, Matthew, 2008.
"Procrastination on long-term projects,"
Journal of Economic Behavior & Organization, Elsevier, vol. 66(2), pages 161-175, May.
- O'Donoghue, Ted & Rabin, Matthew, 2002. "Procrastination on Long-Term Projects," Department of Economics, Working Paper Series qt1bz181nv, Department of Economics, Institute for Business and Economic Research, UC Berkeley.
- O'Donoghue, Ted & Rabin, Matthew, 2002. "Procrastination on Long-Term Projects," Department of Economics, Working Paper Series qt5jv059fq, Department of Economics, Institute for Business and Economic Research, UC Berkeley.
- Ted O'Donoghue & Matthew Rabin, 2003. "Procrastination on Long-Term Projects," Method and Hist of Econ Thought 0303003, University Library of Munich, Germany.
- O'Donoghue, Ted & Rabin, Matthew, 2002. "Procrastination on Long-Term Projects," Working Papers 02-09, Cornell University, Center for Analytic Economics.
- O'Donoghue, Ted & Rabin, Matthew, 2012. "Procrastination on Long-Term Projects," Department of Economics, Working Paper Series qt5zb60651, Department of Economics, Institute for Business and Economic Research, UC Berkeley.
- Juan D. Carrillo & Mathias Dewatripont, 2008. "Promises, Promises, …," Economic Journal, Royal Economic Society, vol. 118(531), pages 1453-1473, August.
- Antinyan, Armenak & Asatryan, Zareh & Dai, Zhixin & Wang, Kezhi, 2021.
"Does the frequency of reminders matter for their effectiveness? A randomized controlled trial,"
Journal of Economic Behavior & Organization, Elsevier, vol. 191(C), pages 752-764.
- Antinyan, Armenak & Asatryan, Zareh & Dai, Zhixin & Wang, Kezhi, 2021. "Does the Frequency of Reminders Matter for their Effectiveness? A Randomized Controlled Trial," Cardiff Economics Working Papers E2021/17, Cardiff University, Cardiff Business School, Economics Section.
- Akin, Zafer, 2012.
"Intertemporal decision making with present biased preferences,"
Journal of Economic Psychology, Elsevier, vol. 33(1), pages 30-47.
- Zafer Akin, 2010. "Intertemporal Decision Making with Present Biased Preferences," Working Papers 1001, TOBB University of Economics and Technology, Department of Economics.
- Tyson, Christopher J., 2008.
"Management of a capital stock by Strotz's naive planner,"
Journal of Economic Dynamics and Control, Elsevier, vol. 32(7), pages 2214-2239, July.
- Christopher J. Tyson, 2006. "Management of a Capital Stock by Strotz's Naive Planner," Economics Papers 2006-W01, Economics Group, Nuffield College, University of Oxford.
- Christopher J. Tyson, 2007. "Management of a Capital Stock by Strotz's Naive Planner," Working Papers 615, Queen Mary University of London, School of Economics and Finance.
- Chen‐Nan Liao & Ying‐Ju Chen, 2021. "Design of Long‐Term Conditional Cash Transfer Program to Encourage Healthy Habits," Production and Operations Management, Production and Operations Management Society, vol. 30(11), pages 3987-4003, November.
- Jianjun Miao, 2008.
"Option exercise with temptation,"
Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 34(3), pages 473-501, March.
- Jianjun Miao, 2004. "Option Exercise with Temptation," Microeconomics 0409002, University Library of Munich, Germany.
- Junjian Miao, 2005. "Option Exercise with Temptation," Boston University - Department of Economics - Working Papers Series WP2005-007, Boston University - Department of Economics.
- Gilpatric, Scott M., 2008. "Present-biased preferences, self-awareness and shirking," Journal of Economic Behavior & Organization, Elsevier, vol. 67(3-4), pages 735-754, September.
- Hammond, Peter J & Zank, Horst, 2013. "Rationality and Dynamic Consistency under Risk and Uncertainty," The Warwick Economics Research Paper Series (TWERPS) 1033, University of Warwick, Department of Economics.
- Paul Heidhues & Philipp Strack, 2021.
"Identifying Present Bias from the Timing of Choices,"
American Economic Review, American Economic Association, vol. 111(8), pages 2594-2622, August.
- Paul Heidhues & Philipp Strack, 2019. "Identifying Present-Bias from the Timing of Choices," Papers 1905.03959, arXiv.org.
- Christian D. Schade & Avichai Snir, 2020. "A lab test on the decision not to decide," Business Research, Springer;German Academic Association for Business Research, vol. 13(3), pages 1253-1291, November.
More about this item
Keywords
Uncertainty theory; Incentive mechanism; Project management; Information asymmetry; Cost salience;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:fuzodm:v:18:y:2019:i:4:d:10.1007_s10700-019-09302-y. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.