IDEAS home Printed from https://ideas.repec.org/a/bla/popmgt/v24y2015i12p1945-1954.html
   My bibliography  Save this article

Incentive Contracts for Managing a Project with Uncertain Completion Time

Author

Listed:
  • Christopher S. Tang
  • Kairen Zhang
  • Sean X. Zhou

Abstract

type="main" xml:id="poms12387-abs-0001"> We examine two time-related incentive project management contracts (C1 and C2 contracts) when the manager conducts a reverse auction. Under the C1 contract, the contractor with the lowest bid price wins; however, the manager imposes a linear and symmetric incentive/disincentive for early/late completion according to a pre-specified due date. Under the C2 contract, the winning contractor has the lowest composite score that is based on the quoted price and the quoted due date; however, in addition to the linear and symmetric penalty/incentive, the contractor is subject to an additional penalty for late completion. While the C2 contract is more sophisticated than the C1 contract (in terms of the number of decisions that each party has to make), our analysis reveals that, unless the project is truly urgent, the more complicated C2 contract adds no value to the manager— the simple C1 contract will suffice.

Suggested Citation

  • Christopher S. Tang & Kairen Zhang & Sean X. Zhou, 2015. "Incentive Contracts for Managing a Project with Uncertain Completion Time," Production and Operations Management, Production and Operations Management Society, vol. 24(12), pages 1945-1954, December.
  • Handle: RePEc:bla:popmgt:v:24:y:2015:i:12:p:1945-1954
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1111/poms.2015.24.issue-12
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Qianqian Shi & Jianbo Zhu & Marcel Hertogh & Zhaohan Sheng, 2018. "Incentive Mechanism of Prefabrication in Mega Projects with Reputational Concerns," Sustainability, MDPI, vol. 10(4), pages 1-16, April.
    2. Zhihua Chen & Yanfei Lan & Ruiqing Zhao & Changjing Shang, 2019. "Deadline-based incentive contracts in project management with cost salience," Fuzzy Optimization and Decision Making, Springer, vol. 18(4), pages 451-473, December.
    3. Shi Chen & Ted Klastorin & Michael R. Wagner, 2021. "Designing practical coordinating contracts in decentralized projects," Naval Research Logistics (NRL), John Wiley & Sons, vol. 68(2), pages 183-198, March.
    4. Bai, Jiaru & So, Kut C. & Tang, Christopher, 2016. "A queueing model for managing small projects under uncertainties," European Journal of Operational Research, Elsevier, vol. 253(3), pages 777-790.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:bla:popmgt:v:24:y:2015:i:12:p:1945-1954. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: http://onlinelibrary.wiley.com/journal/10.1111/(ISSN)1937-5956 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.