IDEAS home Printed from https://ideas.repec.org/a/spr/fuzodm/v18y2019i1d10.1007_s10700-018-9283-6.html
   My bibliography  Save this article

Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility

Author

Listed:
  • Xingmei Li

    (North China Electric Power University)

  • Yaxian Wang

    (North China Electric Power University)

  • Qingyou Yan

    (North China Electric Power University)

  • Xinchao Zhao

    (Beijing University of Posts and Telecommunications)

Abstract

The project portfolio selection problem considering divisibility is a new research problem rising in recent years. However, two deficiencies are discovered in current divisible project portfolio selection research, one is that researchers always ignore the already started exiting projects when selecting a project portfolio, and the other is that the project parameters are all considered as exact values which are not consistent with practice situation. Under this circumstance, the paper first discusses the dynamic project portfolio selection problem with project divisibility. Meanwhile, due to the lack of correlative historical data, some project parameters are given by experts’ estimates and are treated as uncertain variables. Therefore, a mean-variance mixed integer nonlinear optimal selection model is first developed in this paper to deal with the uncertain dynamic project portfolio selection problem with divisibility. For the convenience of computations, an equivalent mixed integer linear programming representation is proposed. Numerical examples with two scenarios are presented to shed light on the characteristics of the proposed model.

Suggested Citation

  • Xingmei Li & Yaxian Wang & Qingyou Yan & Xinchao Zhao, 2019. "Uncertain mean-variance model for dynamic project portfolio selection problem with divisibility," Fuzzy Optimization and Decision Making, Springer, vol. 18(1), pages 37-56, March.
  • Handle: RePEc:spr:fuzodm:v:18:y:2019:i:1:d:10.1007_s10700-018-9283-6
    DOI: 10.1007/s10700-018-9283-6
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10700-018-9283-6
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10700-018-9283-6?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. James H. Lorie & Leonard J. Savage, 1955. "Three Problems in Rationing Capital," The Journal of Business, University of Chicago Press, vol. 28, pages 229-229.
    2. Qun Zhang & Xiaoxia Huang & Chao Zhang, 2015. "A mean-risk index model for uncertain capital budgeting," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(5), pages 761-770, May.
    3. Medaglia, Andres L. & Hueth, Darrell & Mendieta, Juan Carlos & Sefair, Jorge A., 2008. "A multiobjective model for the selection and timing of public enterprise projects," Socio-Economic Planning Sciences, Elsevier, vol. 42(1), pages 31-45, March.
    4. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    5. G Zhu & J F Bard & G Yu, 2005. "Disruption management for resource-constrained project scheduling," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(4), pages 365-381, April.
    6. Xingmei Li & Shu-Cherng Fang & Ye Tian & Xiaoling Guo, 2015. "Expanded model of the project portfolio selection problem with divisibility, time profile factors and cardinality constraints," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 66(7), pages 1132-1139, July.
    7. X. Cui & X. Zheng & S. Zhu & X. Sun, 2013. "Convex relaxations and MIQCQP reformulations for a class of cardinality-constrained portfolio selection problems," Journal of Global Optimization, Springer, vol. 56(4), pages 1409-1423, August.
    8. Eilat, Harel & Golany, Boaz & Shtub, Avraham, 2006. "Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology," European Journal of Operational Research, Elsevier, vol. 172(3), pages 1018-1039, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bo Li & Yufei Sun & Kok Lay Teo, 2022. "An analytic solution for multi-period uncertain portfolio selection problem," Fuzzy Optimization and Decision Making, Springer, vol. 21(2), pages 319-333, June.
    2. Xiaoxia Huang & Guowei Jiang, 2021. "Portfolio management with background risk under uncertain mean-variance utility," Fuzzy Optimization and Decision Making, Springer, vol. 20(3), pages 315-330, September.
    3. Fahime Lotfian Delouyi & Seyed Hassan Ghodsypour & Maryam Ashrafi, 2021. "Dynamic Portfolio Selection in Gas Transmission Projects Considering Sustainable Strategic Alignment and Project Interdependencies through Value Analysis," Sustainability, MDPI, vol. 13(10), pages 1-25, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ye Tian & Miao Sun & Zuoliang Ye & Wei Yang, 2016. "Expanded models of the project portfolio selection problem with loss in divisibility," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1097-1107, August.
    2. Pérez, Fátima & Gómez, Trinidad & Caballero, Rafael & Liern, Vicente, 2018. "Project portfolio selection and planning with fuzzy constraints," Technological Forecasting and Social Change, Elsevier, vol. 131(C), pages 117-129.
    3. Fernández Carazo, Ana & Gómez Núñez, Trinidad & Guerrero Casas, Flor M. & Caballero Fernández, Rafael, 2008. "Evaluación y clasificación de las técnicas utilizadas por las organizaciones, en las últimas décadas, para seleccionar proyectos = Evaluation and classification of the techniques used by organizations," Revista de Métodos Cuantitativos para la Economía y la Empresa = Journal of Quantitative Methods for Economics and Business Administration, Universidad Pablo de Olavide, Department of Quantitative Methods for Economics and Business Administration, vol. 5(1), pages 67-115, June.
    4. Javad Rezaeian & Reza Alizadeh Foroutan & Toraj Mojibi & Yacob Khojasteh, 2023. "Sensitivity Analysis of the Unrelated Parallel Machine Scheduling Problem with Rework Processes and Machine Eligibility Restrictions," SN Operations Research Forum, Springer, vol. 4(3), pages 1-24, September.
    5. Jahangoshai Rezaee, Mustafa & Jozmaleki, Mehrdad & Valipour, Mahsa, 2018. "Integrating dynamic fuzzy C-means, data envelopment analysis and artificial neural network to online prediction performance of companies in stock exchange," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 489(C), pages 78-93.
    6. Tobin, Roger L., 1999. "A fast interactive solution method for large capital expenditure selection problems," European Journal of Operational Research, Elsevier, vol. 116(1), pages 1-15, July.
    7. Marko Ɖurasević & Domagoj Jakobović, 2019. "Creating dispatching rules by simple ensemble combination," Journal of Heuristics, Springer, vol. 25(6), pages 959-1013, December.
    8. Li, Bo & Zhang, Ranran, 2021. "A new mean-variance-entropy model for uncertain portfolio optimization with liquidity and diversification," Chaos, Solitons & Fractals, Elsevier, vol. 146(C).
    9. Dongni Li & Xianwen Meng & Miao Li & Yunna Tian, 2016. "An ACO-based intercell scheduling approach for job shop cells with multiple single processing machines and one batch processing machine," Journal of Intelligent Manufacturing, Springer, vol. 27(2), pages 283-296, April.
    10. Byung-Cheon Choi & Myoung-Ju Park, 2015. "A Batch Scheduling Problem with Two Agents," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 32(06), pages 1-19, December.
    11. Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
    12. Weng, Wei & Fujimura, Shigeru, 2012. "Control methods for dynamic time-based manufacturing under customized product lead times," European Journal of Operational Research, Elsevier, vol. 218(1), pages 86-96.
    13. Omid Shahvari & Rasaratnam Logendran & Madjid Tavana, 2022. "An efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problems," Journal of Scheduling, Springer, vol. 25(5), pages 589-621, October.
    14. Rossi, Andrea, 2014. "Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships," International Journal of Production Economics, Elsevier, vol. 153(C), pages 253-267.
    15. Shi-Sheng Li & Ren-Xia Chen & Qi Feng, 2016. "Scheduling two job families on a single machine with two competitive agents," Journal of Combinatorial Optimization, Springer, vol. 32(3), pages 784-799, October.
    16. Jize Zhang & Tim Leung & Aleksandr Aravkin, 2018. "A Relaxed Optimization Approach for Cardinality-Constrained Portfolio Optimization," Papers 1810.10563, arXiv.org.
    17. Hanafi, Said & Freville, Arnaud, 1998. "An efficient tabu search approach for the 0-1 multidimensional knapsack problem," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 659-675, April.
    18. A. Dolgui & M. Kovalyov & K. Shchamialiova, 2011. "Multi-product lot-sizing and sequencing on a single imperfect machine," Computational Optimization and Applications, Springer, vol. 50(3), pages 465-482, December.
    19. Jose L. Andrade-Pineda & David Canca & Pedro L. Gonzalez-R & M. Calle, 2020. "Scheduling a dual-resource flexible job shop with makespan and due date-related criteria," Annals of Operations Research, Springer, vol. 291(1), pages 5-35, August.
    20. Spring C. Hsu, 2018. "Performance Analysis for Major Chain Convenience Stores in Taiwan," Journal of Social Science Studies, Macrothink Institute, vol. 5(1), pages 214-222, January.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:fuzodm:v:18:y:2019:i:1:d:10.1007_s10700-018-9283-6. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.