IDEAS home Printed from https://ideas.repec.org/a/taf/tsysxx/v44y2013i3p582-594.html
   My bibliography  Save this article

Maximising profits for an EPQ model with unreliable machine and rework of random defective items

Author

Listed:
  • Brojeswar Pal
  • Shib Sana
  • Kripasindhu Chaudhuri

Abstract

This article deals with an economic production quantity (EPQ) model in an imperfect production system. The production system may undergo in ‘out-of-control’ state from ‘in-control’ state, after a certain time that follows a probability density function. The density function varies with reliability of the machinery system that may be controlled by new technologies, investing more costs. The defective items produced in ‘out-of-control’ state are reworked at a cost just after the regular production time. Occurrence of the ‘out-of-control’ state during or after regular production-run time is analysed and also graphically illustrated separately. Finally, an expected profit function regarding the inventory cost, unit production cost and selling price is maximised analytically. Sensitivity analysis of the model with respect to key parameters of the system is carried out. Two numerical examples are considered to test the model and one of them is illustrated graphically.

Suggested Citation

  • Brojeswar Pal & Shib Sana & Kripasindhu Chaudhuri, 2013. "Maximising profits for an EPQ model with unreliable machine and rework of random defective items," International Journal of Systems Science, Taylor & Francis Journals, vol. 44(3), pages 582-594.
  • Handle: RePEc:taf:tsysxx:v:44:y:2013:i:3:p:582-594
    DOI: 10.1080/00207721.2011.617896
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207721.2011.617896
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207721.2011.617896?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yi-Kuei Lin & Ping-Chen Chang, 2015. "A novel model for a manufacturing system with joint production lines in terms of prior-set," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(2), pages 340-354, January.
    2. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Leopoldo Eduardo Cárdenas-Barrón, 2020. "A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints," Annals of Operations Research, Springer, vol. 286(1), pages 265-301, March.
    3. Chiu, Singa Wang & Chen, Hui-Cun & Wu, Hua-Yao & Chiu, Yuan-Shyi Peter, 2020. "A hybrid finite production rate system featuring random breakdown and rework," Operations Research Perspectives, Elsevier, vol. 7(C).
    4. M. Jaber & Z. Givi, 2015. "Imperfect production process with learning and forgetting effects," Computational Management Science, Springer, vol. 12(1), pages 129-152, January.
    5. Gerardo Treviño-Garza & Krystel K. Castillo-Villar & Leopoldo Eduardo Cárdenas-Barrón, 2015. "Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(9), pages 1705-1716, July.
    6. Song, Dong-Ping & Dong, Jing-Xin & Xu, Jingjing, 2014. "Integrated inventory management and supplier base reduction in a supply chain with multiple uncertainties," European Journal of Operational Research, Elsevier, vol. 232(3), pages 522-536.
    7. Amir Hossein Nobil & Amir Hosein Afshar Sedigh & Behrouz Afshar-Nadjafi, 2020. "Lot-sizing problem for a defective processing system with categorized items, backordering and pricing policy," Journal of Revenue and Pricing Management, Palgrave Macmillan, vol. 19(4), pages 255-265, August.
    8. Al-Salamah, Muhammad, 2019. "Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates," Operations Research Perspectives, Elsevier, vol. 6(C).
    9. Shaofu Du & Yujiao Zhu & Tengfei Nie & Haisuo Yu, 2018. "Loss-averse preferences in a two-echelon supply chain with yield risk and demand uncertainty," Operational Research, Springer, vol. 18(2), pages 361-388, July.
    10. Pal, Brojeswar & Sana, Shib Sankar & Chaudhuri, Kripasindhu, 2014. "Joint pricing and ordering policy for two echelon imperfect production inventory model with two cycles," International Journal of Production Economics, Elsevier, vol. 155(C), pages 229-238.
    11. Ata Allah Taleizadeh & Mahsa Noori-daryan, 2016. "Pricing, inventory and production policies in a supply chain of pharmacological products with rework process: a game theoretic approach," Operational Research, Springer, vol. 16(1), pages 89-115, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tsysxx:v:44:y:2013:i:3:p:582-594. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TSYS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.