IDEAS home Printed from https://ideas.repec.org/a/sae/jouinf/v3y2011i2p171-186.html
   My bibliography  Save this article

Project Risk Management in Hydropower Plant Projects

Author

Listed:
  • Weddy Bernadi Sudirman
  • Sarwono Hardjomuljadi

Abstract

The development of hydroelectric power plant is one of the efforts in utilising water resources for people’s welfare by generating the energy for electricity purpose. Nowadays, the installed capacity of hydro electric power plants is 3,529 MW from the total installed capacity 24,846 MW from various power plants owned by PT PLN (Persero) and the hydropower potential 75,000 MW all over Indonesia. Hydroelectric power plant has complex structures and involves large amounts of capital with a long-running construction period. This situation imposes uncertainty factors with considerably high risks. The construction phase is identified as a critical phase in hydropower projects where many unforeseen factors occur. Failure to manage project risks leads to significant problems for the client such as completion time delays and cost overruns. In order to prevent time delays and cost overruns in hydropower construction in PT PLN (Persero), the study on project risk management in the construction stage of hydropower plant projects had been conducted. The purpose of this study was to identify and measure the importance of construction risks and to determine the level of agreement or disagreement between the client, consultants and contractors on the ranking of construction risk in hydropower projects. The author selected the respondents from the clients, consultants and contractors’ personnel who had work experience in hydropower construction projects in PT PLN (Persero). JEL Classification: L74—Construction

Suggested Citation

  • Weddy Bernadi Sudirman & Sarwono Hardjomuljadi, 2011. "Project Risk Management in Hydropower Plant Projects," Journal of Infrastructure Development, India Development Foundation, vol. 3(2), pages 171-186, December.
  • Handle: RePEc:sae:jouinf:v:3:y:2011:i:2:p:171-186
    DOI: 10.1177/097493061100300205
    as

    Download full text from publisher

    File URL: https://journals.sagepub.com/doi/10.1177/097493061100300205
    Download Restriction: no

    File URL: https://libkey.io/10.1177/097493061100300205?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Mohammed Al-Khalil & Mohammed Al-Ghafly, 1999. "Important causes of delay in public utility projects in Saudi Arabia," Construction Management and Economics, Taylor & Francis Journals, vol. 17(5), pages 647-655.
    2. Scott Baker & David Ponniah & Simon Smith, 1999. "Risk response techniques employed currently for major projects," Construction Management and Economics, Taylor & Francis Journals, vol. 17(2), pages 205-213.
    3. Shou Qing Wang & Mohammed Fadhil Dulaimi & Muhammad Yousuf Aguria, 2004. "Risk management framework for construction projects in developing countries," Construction Management and Economics, Taylor & Francis Journals, vol. 22(3), pages 237-252.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    2. Ahsan Nawaz & Xing Su & Qaiser Mohi Ud Din & Muhammad Irslan Khalid & Muhammad Bilal & Syyed Adnan Raheel Shah, 2020. "Identification of the H&S (Health and Safety Factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project," IJERPH, MDPI, vol. 17(2), pages 1-18, January.
    3. Herve Kabanda & Alex Romard & Fuze Yurtsever & Anjali Wadhera & Joshua Andrews & Craig Merrett, 2021. "Construction Time Estimation Function for Canadian Utility Scale Power Plants," Energies, MDPI, vol. 14(17), pages 1-16, August.
    4. Fan, Miao & Lin, Neng-Pai & Sheu, Chwen, 2008. "Choosing a project risk-handling strategy: An analytical model," International Journal of Production Economics, Elsevier, vol. 112(2), pages 700-713, April.
    5. Hadi Sarvari & Alireza Valipour & Nordin Yahya & Norhazilan MD Noor & Michael Beer & Nerija Banaitiene, 2019. "Approaches to Risk Identification in Public–Private Partnership Projects: Malaysian Private Partners’ Overview," Administrative Sciences, MDPI, vol. 9(1), pages 1-18, February.
    6. Keonhyeong Lee & Liyuan Wang, 2023. "Chinese High-Tech Export Performance: Effects of Intellectual Capital Mediated by Dynamic and Risk Management Capabilities," SAGE Open, , vol. 13(1), pages 21582440231, February.
    7. Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
    8. Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
    9. Irem Dikmen & M. Talat Birgonul, 2006. "A review of international construction research: Ranko Bon's contribution," Construction Management and Economics, Taylor & Francis Journals, vol. 24(7), pages 725-733.
    10. Yin Chen & Mei Ye Kho & Othman Mohamed, 2024. "Developing a Conceptual Model for Promoting Risk Management for Public–Private Partnerships Projects," Sustainability, MDPI, vol. 16(18), pages 1-22, September.
    11. Palaco, Ileana & Park, Min Jae & Kim, Suk Kyoung & Rho, Jae Jeung, 2019. "Public–private partnerships for e-government in developing countries: An early stage assessment framework," Evaluation and Program Planning, Elsevier, vol. 72(C), pages 205-218.
    12. Mohamed, Emad & Seresht, Nima Gerami & Jafari, Parinaz & AbouRizk, Simaan, 2024. "Risk assessment for onshore wind projects in Canada," Renewable and Sustainable Energy Reviews, Elsevier, vol. 191(C).
    13. Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
    14. Ihab Hijazi & Umit Isikdag & Mohammed Abunemeh & Xin Li & Mariam Hashash & Rani El Meouche & Sergen Cansiz, 2018. "Mapping the Processes of Donor-Funded Construction Projects," Sustainability, MDPI, vol. 10(7), pages 1-25, July.
    15. John Malu Nzioki & Dr. Mary Nyawira Mwenda, 2021. "Enhancing Performance of the Building Construction Industry through Quantitative Risk Analysis and Risk Response: A Case of Exchequer Funded Building Construction Projects in Machakos County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(3), pages 31-39, March.
    16. Naomi Brookes, 2012. "What is engineering construction and why is it important? Towards a research agenda," Construction Management and Economics, Taylor & Francis Journals, vol. 30(8), pages 603-607, August.
    17. Agnieszka Leśniak & Filip Janowiec, 2019. "Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network," Sustainability, MDPI, vol. 11(19), pages 1-15, September.
    18. Cunbin Li & Yunqi Liu & Shuke Li, 2016. "Risk Evaluation of Qinghai–Tibet Power Grid Interconnection Project for Sustainability," Sustainability, MDPI, vol. 8(1), pages 1-19, January.
    19. Hamzeh Dehghani & Ali Hormozi & Mansour Nikpour, 2022. "Systematic risks assessment of precast concrete canal in irrigation projects using DEMATEL method," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(1), pages 123-130, February.
    20. Beata Sadowska & Adam Lulek, 2018. "The problem of risk in the economy of sustainable development on the example of the State Forests," Ekonomia i Prawo, Uniwersytet Mikolaja Kopernika, vol. 17(1), pages 103-120, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sae:jouinf:v:3:y:2011:i:2:p:171-186. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: SAGE Publications (email available below). General contact details of provider: http://www.idfresearch.org .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.