Development of Risk Quantification Models in Road Infrastructure Projects

Author

Listed:
  • Aleksandar Senić

    (Faculty of Civil Engineering, University of Belgrade, 11000 Belgrade, Serbia)

  • Momčilo Dobrodolac

    (Faculty of Transport and Traffic Engineering, University of Belgrade, 11000 Belgrade, Serbia)

  • Zoran Stojadinović

    (Faculty of Civil Engineering, University of Belgrade, 11000 Belgrade, Serbia)

Abstract

Road infrastructure is a significant factor in the development of any country, affecting economic growth, social development, and environmental sustainability. Large infrastructure projects often face significant risks and uncertainties, which can lead to delays, budget over-runs, and an insufficient quality of the completed work. These issues undermine the economic viability of projects and affect the overall efficiency of infrastructure development. For these reasons, based on a literature review and completed project analysis, the risks that lead to an increasing Contract Price (ICP) and an Extension of Time (EoT) for the construction of the project are identified. Based on the results of the completed project analysis, the values of the ICP and EoT were quantified. Also, the probability of the occurrence of each risk in new projects was calculated. Based on the obtained results, a model was defined that groups risks into clusters. Risks in the first cluster should have priority for funding, and preventive measures are defined for them. The model obtained in this way can greatly enhance project management in real-world conditions and can lead to a significant reduction in project time and budget over-runs.

Suggested Citation

  • Aleksandar Senić & Momčilo Dobrodolac & Zoran Stojadinović, 2024. "Development of Risk Quantification Models in Road Infrastructure Projects," Sustainability, MDPI, vol. 16(17), pages 1-20, September.
  • Handle: RePEc:gam:jsusta:v:16:y:2024:i:17:p:7694-:d:1471377
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/16/17/7694/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/16/17/7694/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Shou Qing Wang & Mohammed Fadhil Dulaimi & Muhammad Yousuf Aguria, 2004. "Risk management framework for construction projects in developing countries," Construction Management and Economics, Taylor & Francis Journals, vol. 22(3), pages 237-252.
    2. Satish Kumar Viswanathan & Kamalendra Kumar Tripathi & Kumar Neeraj Jha, 2020. "Influence of risk mitigation measures on international construction project success criteria – a survey of Indian experiences," Construction Management and Economics, Taylor & Francis Journals, vol. 38(3), pages 207-222, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahsan Nawaz & Xing Su & Qaiser Mohi Ud Din & Muhammad Irslan Khalid & Muhammad Bilal & Syyed Adnan Raheel Shah, 2020. "Identification of the H&S (Health and Safety Factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project," IJERPH, MDPI, vol. 17(2), pages 1-18, January.
    2. Akbari Ahmadabadi, Ali & Heravi, Gholamreza, 2019. "Risk assessment framework of PPP-megaprojects focusing on risk interaction and project success," Transportation Research Part A: Policy and Practice, Elsevier, vol. 124(C), pages 169-188.
    3. Hande Aladağ, 2023. "Assessing the Accuracy of ChatGPT Use for Risk Management in Construction Projects," Sustainability, MDPI, vol. 15(22), pages 1-27, November.
    4. Anuja Shaktawat & Shelly Vadhera, 2021. "Risk management of hydropower projects for sustainable development: a review," Environment, Development and Sustainability: A Multidisciplinary Approach to the Theory and Practice of Sustainable Development, Springer, vol. 23(1), pages 45-76, January.
    5. Edwin Thomas Banobi & Wooyong Jung, 2019. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects," Sustainability, MDPI, vol. 11(21), pages 1-16, October.
    6. Keonhyeong Lee & Liyuan Wang, 2023. "Chinese High-Tech Export Performance: Effects of Intellectual Capital Mediated by Dynamic and Risk Management Capabilities," SAGE Open, , vol. 13(1), pages 21582440231, February.
    7. Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
    8. Jin Woo Won & Wooyong Jung & Seung Heon Han & Sungmin Yun & Bonsang Koo, 2019. "What Enables a High-Risk Project to Yield High Return from a Construction Contractor’s Perspective?," Sustainability, MDPI, vol. 11(21), pages 1-17, October.
    9. Mónika Garai-Fodor & Tibor Pál Szemere & Ágnes Csiszárik-Kocsir, 2022. "Investor Segments by Perceived Project Risk and Their Characteristics Based on Primary Research Results," Risks, MDPI, vol. 10(8), pages 1-13, August.
    10. Weddy Bernadi Sudirman & Sarwono Hardjomuljadi, 2011. "Project Risk Management in Hydropower Plant Projects," Journal of Infrastructure Development, India Development Foundation, vol. 3(2), pages 171-186, December.
    11. Irem Dikmen & M. Talat Birgonul, 2006. "A review of international construction research: Ranko Bon's contribution," Construction Management and Economics, Taylor & Francis Journals, vol. 24(7), pages 725-733.
    12. Ing.Jakub Blatak, 2016. "Potential of Using Design-Build in Public Procurement," Applied Finance and Accounting, Redfame publishing, vol. 2(2), pages 77-85, August.
    13. Yin Chen & Mei Ye Kho & Othman Mohamed, 2024. "Developing a Conceptual Model for Promoting Risk Management for Public–Private Partnerships Projects," Sustainability, MDPI, vol. 16(18), pages 1-22, September.
    14. Palaco, Ileana & Park, Min Jae & Kim, Suk Kyoung & Rho, Jae Jeung, 2019. "Public–private partnerships for e-government in developing countries: An early stage assessment framework," Evaluation and Program Planning, Elsevier, vol. 72(C), pages 205-218.
    15. Ahsan Nawaz & Ahsan Waqar & Syyed Adnan Raheel Shah & Muhammad Sajid & Muhammad Irslan Khalid, 2019. "An Innovative Framework for Risk Management in Construction Projects in Developing Countries: Evidence from Pakistan," Risks, MDPI, vol. 7(1), pages 1-10, February.
    16. Mohamed, Emad & Seresht, Nima Gerami & Jafari, Parinaz & AbouRizk, Simaan, 2024. "Risk assessment for onshore wind projects in Canada," Renewable and Sustainable Energy Reviews, Elsevier, vol. 191(C).
    17. A. Garcia-Bernabeu & F. Mayor-Vitoria & F. Mas-Verdu, 2015. "Project Finance Recent Applications and Future Trends: The State of the Art," International Journal of Business and Economics, School of Management Development, Feng Chia University, Taichung, Taiwan, vol. 14(2), pages 159-178, December.
    18. John Malu Nzioki & Dr. Mary Nyawira Mwenda, 2021. "Enhancing Performance of the Building Construction Industry through Quantitative Risk Analysis and Risk Response: A Case of Exchequer Funded Building Construction Projects in Machakos County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(3), pages 31-39, March.
    19. Xiaoyan Jiang & Kun Lu & Bo Xia & Yong Liu & Caiyun Cui, 2019. "Identifying Significant Risks and Analyzing Risk Relationship for Construction PPP Projects in China Using Integrated FISM-MICMAC Approach," Sustainability, MDPI, vol. 11(19), pages 1-31, September.
    20. Agnieszka Leśniak & Filip Janowiec, 2019. "Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network," Sustainability, MDPI, vol. 11(19), pages 1-15, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:16:y:2024:i:17:p:7694-:d:1471377. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .