Important causes of delay in public utility projects in Saudi Arabia

Author

Listed:
  • Mohammed Al-Khalil
  • Mohammed Al-Ghafly

Abstract

This study was conducted to determine the most important causes of delay in public utility projects, based on the frequency and severity of the causes. A survey of randomly selected samples of contractors, consultants, and owners was carried out to assess the frequency of occurrence and the severity of impact of sixty potential delay causes. A frequency index and a severity index were determined for each cause. An importance index for each cause was then computed as the product of the frequency and severity indices. The results showed that the three parties surveyed generally agree on the importance ranking of delay causes. The causes were grouped also into six major categories of delay. The analysis showed lack of agreement among the parties on the ranking of the major categories of delay.

Suggested Citation

  • Mohammed Al-Khalil & Mohammed Al-Ghafly, 1999. "Important causes of delay in public utility projects in Saudi Arabia," Construction Management and Economics, Taylor & Francis Journals, vol. 17(5), pages 647-655.
  • Handle: RePEc:taf:conmgt:v:17:y:1999:i:5:p:647-655
    DOI: 10.1080/014461999371259
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/014461999371259
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/014461999371259?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2018. "Delay Factors in Reconstruction Projects: A Case Study of Mataf Expansion Project," Sustainability, MDPI, vol. 10(12), pages 1-18, December.
    2. Herve Kabanda & Alex Romard & Fuze Yurtsever & Anjali Wadhera & Joshua Andrews & Craig Merrett, 2021. "Construction Time Estimation Function for Canadian Utility Scale Power Plants," Energies, MDPI, vol. 14(17), pages 1-16, August.
    3. Weddy Bernadi Sudirman & Sarwono Hardjomuljadi, 2011. "Project Risk Management in Hydropower Plant Projects," Journal of Infrastructure Development, India Development Foundation, vol. 3(2), pages 171-186, December.
    4. Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
    5. Ihab Hijazi & Umit Isikdag & Mohammed Abunemeh & Xin Li & Mariam Hashash & Rani El Meouche & Sergen Cansiz, 2018. "Mapping the Processes of Donor-Funded Construction Projects," Sustainability, MDPI, vol. 10(7), pages 1-25, July.
    6. Mohammad Ajmal Nikjow & Li Liang & Xijing Qi & Samad M. E. Sepasgozar & Nicholas Chileshe, 2021. "Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects," Sustainability, MDPI, vol. 13(17), pages 1-21, August.
    7. Basem Al Khatib & Yap Soon Poh & Ahmed El-Shafie, 2020. "Delay Factors Management and Ranking for Reconstruction and Rehabilitation Projects Based on the Relative Importance Index (RII)," Sustainability, MDPI, vol. 12(15), pages 1-21, July.
    8. Deep Shumank & Asim Mohd & Khan Mohd Kashif, 2017. "Review of Various Delay Causing Factors and Their Resolution by Application of Lean Principles in India," Baltic Journal of Real Estate Economics and Construction Management, Sciendo, vol. 5(1), pages 101-117, November.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:17:y:1999:i:5:p:647-655. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.