A Model To Estimate The Time Overrun Risk In Construction Projects

Author

Listed:
  • S M RENUKA
  • S KAMAL
  • C UMARANI

Abstract

This paper aims to develop a model to find the expected percentage of time overrun (Delay Index) in a construction project, because time overrun is one of the major criteria which could affect the success of any construction projects. Therefore, it will be a serious issue in today’s construction. In view of that, six major groups causing the time delay in the project were identified from literature survey and opinions from the experts in construction sectors. A questionnaire was designed and the project managers were asked to fill the percentage of delay for each group related issues and the overall delay duration of the construction projects. Likewise, 112 completed project details were collected from various constructors. Then the collected data were analyzed using regression analysis. The results of a model were used to fine tune the relationship between the percentage of delay and the major group related issues that causes delay. This model estimates the expected percentage of the time overrun for a particular construction project during the planning stage itself. So that, the necessary action can be taken to minimize the delay and to complete the construction project on time and within budget.

Suggested Citation

  • S M Renuka & S Kamal & C Umarani, 2017. "A Model To Estimate The Time Overrun Risk In Construction Projects," Theoretical and Empirical Researches in Urban Management, Research Centre in Public Administration and Public Services, Bucharest, Romania, vol. 12(2), pages 64-76, April.
  • Handle: RePEc:rom:terumm:v:12:y:2017:i:2:p:64-76
    as

    Download full text from publisher

    File URL: https://um.ase.ro/no122/5.pdf
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. P. A. Koushki & K. Al-Rashid & N. Kartam, 2005. "Delays and cost increases in the construction of private residential projects in Kuwait," Construction Management and Economics, Taylor & Francis Journals, vol. 23(3), pages 285-294.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Martina KLIEROVA & Jan KUTIK, 2017. "One Stop Government – Strategy of Public Services for Citizens and Businesses in Slovakia," REVISTA ADMINISTRATIE SI MANAGEMENT PUBLIC, Faculty of Administration and Public Management, Academy of Economic Studies, Bucharest, Romania, vol. 2017(28), pages 66-80, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mauro Bambi & Cristina Girolami & Salvatore Federico & Fausto Gozzi, 2017. "Generically distributed investments on flexible projects and endogenous growth," Economic Theory, Springer;Society for the Advancement of Economic Theory (SAET), vol. 63(2), pages 521-558, February.
    2. Edwin Thomas Banobi & Wooyong Jung, 2019. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects," Sustainability, MDPI, vol. 11(21), pages 1-16, October.
    3. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 0. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 0, pages 1-10.
    4. Mohammad Ajmal Nikjow & Li Liang & Xijing Qi & Samad M. E. Sepasgozar & Nicholas Chileshe, 2021. "Triggers of Delays in International Projects Using Engineering Procurement and Construction Delivery Methods in the Belt and Road Initiative: Case Study of a High-Speed Railway Projects," Sustainability, MDPI, vol. 13(17), pages 1-21, August.
    5. Aftab Memon & Ismail Rahman, 2013. "Analysis of Cost Overrun Factors for Small Scale Construction Projects in Malaysia Using PLS-SEM Method," Modern Applied Science, Canadian Center of Science and Education, vol. 7(8), pages 1-78, August.
    6. Goutom K. Pall & Adrian J. Bridge & Jason Gray & Martin Skitmore, 2019. "Causes of Delay in Power Transmission Projects: An Empirical Study," Energies, MDPI, vol. 13(1), pages 1-29, December.
    7. Ihsan Issa Ahmad Hosani & Fikri T. Dweiri & Udechukwu Ojiako, 2020. "A study of cost overruns in complex multi-stakeholder road projects in the United Arab Emirates," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(6), pages 1250-1259, December.
    8. A .Q. Adeleke* & Abimbola Olukemi Windapo & Muhammad Waris Ali Khan & J.A. Bamgbade & Maruf Gbadebo Salimon & Gusman Nawanir, 2018. "Validating the Influence of Effective Communication, Team Competency and Skills, Active Leadership on Construction Risk Management Practices of Nigerian Construction Companies," The Journal of Social Sciences Research, Academic Research Publishing Group, pages 460-465:6.
    9. Myung-Hun Kim & Eul-Bum Lee & Han-Suk Choi, 2019. "A Forecast and Mitigation Model of Construction Performance by Assessing Detailed Engineering Maturity at Key Milestones for Offshore EPC Mega-Projects," Sustainability, MDPI, vol. 11(5), pages 1-21, February.
    10. Tirataci Hakan & Yaman Hakan, 2023. "Estimation of ideal construction duration in tender preparation stage for housing projects," Organization, Technology and Management in Construction, Sciendo, vol. 15(1), pages 192-212, January.
    11. Mauro Bambi & Cristina Di Girolami & Salvatore Federico & Fausto Gozzi, 2014. "On the Consequences of Generically Distributed Investments on Flexible Projects in an Endogenous Growth Model," Discussion Papers 14/15, Department of Economics, University of York.
    12. Oke Ayodeji Emmanuel, 2016. "Effect of bond administration on construction project delivery," Organization, Technology and Management in Construction, Sciendo, vol. 8(1), pages 1390-1396, December.
    13. Edyta Plebankiewicz, 2018. "Model of Predicting Cost Overrun in Construction Projects," Sustainability, MDPI, vol. 10(12), pages 1-14, November.
    14. Ismail Abdul Rahman & Aftab Memon & Ahmad Tarmizi Abd. Karim, 2013. "Relationship between Factors of Construction Resources Affecting Project Cost," Modern Applied Science, Canadian Center of Science and Education, vol. 7(1), pages 1-67, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:rom:terumm:v:12:y:2017:i:2:p:64-76. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Colesca Sofia (email available below). General contact details of provider: https://edirc.repec.org/data/ccasero.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.