Liberalization of network industries frequently separates the network from the other parts of the industry. This is important in particular for the electricity industry where private firms invest into generation facilities, while network investments usually are controlled by regulators. We discuss two regulatory regimes. First, the regulator can only decide on the network extension. Second, she can additionally use a “capacity market” with payments contingent on private generation investment. For the first case, we find that even absent asymmetric information, a lack of regulatory commitment can cause inefficiently high or inefficiently low investments. For the second case, we develop a standard handicap auction which implements the first best under asymmetric information if there are no shadow costs of public funds. With shadow costs, no simple mechanism can implement the second best outcome. Copyright Springer Science+Business Media New York 2013

Suggested Citation

  • Felix Höffler & Achim Wambach, 2013. "Investment coordination in network industries: the case of electricity grid and electricity generation," Journal of Regulatory Economics, Springer, vol. 44(3), pages 287-307, December.
  • Handle: RePEc:kap:regeco:v:44:y:2013:i:3:p:287-307
    DOI: 10.1007/s11149-013-9227-6
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/s11149-013-9227-6
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/s11149-013-9227-6?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, June.
    2. Péter Eső & Balázs Szentes, 2007. "Optimal Information Disclosure in Auctions and the Handicap Auction," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 74(3), pages 705-731.
    3. Werner Troesken, 2003. "Municipalizing American Waterworks, 1897--1915," The Journal of Law, Economics, and Organization, Oxford University Press, vol. 19(2), pages 373-400, October.
    4. Cramton, Peter & Stoft, Steven, 2005. "A Capacity Market that Makes Sense," The Electricity Journal, Elsevier, vol. 18(7), pages 43-54.
    5. Levy, Brian & Spiller, Pablo T, 1994. "The Institutional Foundations of Regulatory Commitment: A Comparative Analysis of Telecommunications Regulation," The Journal of Law, Economics, and Organization, Oxford University Press, vol. 10(2), pages 201-246, October.
    6. Rious Vincent & Perez Yannick & Glachant Jean-Michel, 2011. "Power Transmission Network Investment as an Anticipation Problem," Review of Network Economics, De Gruyter, vol. 10(4), pages 1-23, December.
    7. Sauma, Enzo E. & Oren, Shmuel S., 2009. "Do generation firms in restructured electricity markets have incentives to support social-welfare-improving transmission investments?," Energy Economics, Elsevier, vol. 31(5), pages 676-689, September.
    8. Joskow, Paul L., 2008. "Capacity payments in imperfect electricity markets: Need and design," Utilities Policy, Elsevier, vol. 16(3), pages 159-170, September.
    9. Enzo Sauma & Shmuel Oren, 2006. "Proactive planning and valuation of transmission investments in restructured electricity markets," Journal of Regulatory Economics, Springer, vol. 30(3), pages 358-387, November.
    10. Scott E. Masten, 2011. "Public Utility Ownership in 19th-Century America: The "Aberrant" Case of Water," The Journal of Law, Economics, and Organization, Oxford University Press, vol. 27(3), pages 604-654.
    11. Paul L. Joskow, 1997. "Restructuring, Competition and Regulatory Reform in the U.S. Electricity Sector," Journal of Economic Perspectives, American Economic Association, vol. 11(3), pages 119-138, Summer.
    12. Thomas-Olivier Leautier, 2000. "Regulation of an Electric Power Transmission Company," The Energy Journal, International Association for Energy Economics, vol. 0(Number 4), pages 61-92.
    13. Felix Höffler & Sebastian Kranz, 2015. "Using Forward Contracts to Reduce Regulatory Capture," Journal of Industrial Economics, Wiley Blackwell, vol. 63(4), pages 598-624, December.
    14. Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Journal of Regulatory Economics, Springer, vol. 36(2), pages 127-153, October.
    15. Chao, Hung-Po & Peck, Stephen, 1996. "A Market Mechanism for Electric Power Transmission," Journal of Regulatory Economics, Springer, vol. 10(1), pages 25-59, July.
    16. Bushnell, James B & Stoft, Steven E, 1996. "Electric Grid Investment under a Contract Network Regime," Journal of Regulatory Economics, Springer, vol. 10(1), pages 61-79, July.
    17. Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Post-Print hal-02402972, HAL.
    18. Enzo Sauma & Shmuel Oren, 2006. "Proactive planning and valuation of transmission investments in restructured electricity markets," Journal of Regulatory Economics, Springer, vol. 30(3), pages 261-290, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Veronika Grimm & Alexander Martin & Christian Sölch & Martin Weibelzahl & Gregor Zöttl, 2022. "Market-Based Redispatch May Result in Inefficient Dispatch," The Energy Journal, , vol. 43(5), pages 205-230, September.
    2. Neetzow, Paul & Pechan, Anna & Eisenack, Klaus, 2018. "Electricity storage and transmission: Complements or substitutes?," Energy Economics, Elsevier, vol. 76(C), pages 367-377.
    3. Chao, Hung-po & Wilson, Robert, 2020. "Coordination of electricity transmission and generation investments," Energy Economics, Elsevier, vol. 86(C).
    4. Ibarra-Yunez, Alejandro, 2015. "Energy reform in Mexico: Imperfect unbundling in the electricity sector," Utilities Policy, Elsevier, vol. 35(C), pages 19-27.
    5. Wagner, Johannes, 2016. "Grid Investment and Support Schemes for Renewable Electricity Generation," EWI Working Papers 2016-8, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI), revised 10 Aug 2017.
    6. Ochoa, Camila & van Ackere, Ann, 2015. "Winners and losers of market coupling," Energy, Elsevier, vol. 80(C), pages 522-534.
    7. Lukas Schmidt & Jonas Zinke, 2023. "One Price Fits All? On Inefficient Siting Incentives for Wind Power Expansion in Germany under Uniform Pricing," The Energy Journal, , vol. 44(4), pages 21-52, July.
    8. Feld, Lars P. & Fuest, Clemens & Haucap, Justus & Schweitzer, Heike & Wieland, Volker & Wigger, Berthold U., 2014. "Neustart in der Energiepolitik jetzt!," Kronberger Kreis-Studien 58, Stiftung Marktwirtschaft / The Market Economy Foundation, Berlin.
    9. Joachim Bertsch & Simeon Hagspiel & Lisa Just, 2016. "Congestion management in power systems," Journal of Regulatory Economics, Springer, vol. 50(3), pages 290-327, December.
    10. Malischek, Raimund & Trüby, Johannes, 2016. "The future of nuclear power in France: an analysis of the costs of phasing-out," Energy, Elsevier, vol. 116(P1), pages 908-921.
    11. Ruderer, Dominik & Zöttl, Gregor, 2018. "Transmission pricing and investment incentives," Utilities Policy, Elsevier, vol. 55(C), pages 14-30.
    12. Bertsch, Joachim & Hagspiel, Simeon & Just, Lisa, 2016. "Congestion management in power systems - Long-term modeling framework and large-scale application," EWI Working Papers 2015-3, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Höffler, Felix & Wambach, Achim, 2013. "Investment Coordination in Network Industries: The Case of Electricity Grid and Electricity," EWI Working Papers 2013-12, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
    2. Ruderer, Dominik & Zöttl, Gregor, 2018. "Transmission pricing and investment incentives," Utilities Policy, Elsevier, vol. 55(C), pages 14-30.
    3. Chao, Hung-po & Wilson, Robert, 2020. "Coordination of electricity transmission and generation investments," Energy Economics, Elsevier, vol. 86(C).
    4. Wolf-Peter Schill & Jonas Egerer & Juan Rosellón, 2015. "Testing regulatory regimes for power transmission expansion with fluctuating demand and wind generation," Journal of Regulatory Economics, Springer, vol. 47(1), pages 1-28, February.
    5. Stephen Littlechild, 2012. "Merchant and regulated transmission: theory, evidence and policy," Journal of Regulatory Economics, Springer, vol. 42(3), pages 308-335, December.
    6. Zenón, Eric & Rosellón, Juan, 2017. "Optimal transmission planning under the Mexican new electricity market," Energy Policy, Elsevier, vol. 104(C), pages 349-360.
    7. Ochoa, Camila & van Ackere, Ann, 2015. "Winners and losers of market coupling," Energy, Elsevier, vol. 80(C), pages 522-534.
    8. Groppi, Angelamaria & Fumagalli, Elena, 2014. "Network expansion by a proactive transmission system operator: A case study," Energy Policy, Elsevier, vol. 69(C), pages 610-623.
    9. Vincent Rious & Yannick Perez & Philippe Dessante, 2008. "Is combination of nodal pricing and average participation tariff the best solution to coordinate the location of power plants with lumpy transmission investments?," Post-Print hal-00323878, HAL.
    10. Vincent Rious & Yannick Perez & Philippe Dessante, 2008. "The efficiency of short run and long run locational signals to coordinate generation location with lumpy transmission investments," Post-Print hal-00339505, HAL.
    11. Siddiqui, Afzal S. & Tanaka, Makoto & Chen, Yihsu, 2019. "Sustainable transmission planning in imperfectly competitive electricity industries: Balancing economic and environmental outcomes," European Journal of Operational Research, Elsevier, vol. 275(1), pages 208-223.
    12. de Nooij, Michiel, 2011. "Social cost-benefit analysis of electricity interconnector investment: A critical appraisal," Energy Policy, Elsevier, vol. 39(6), pages 3096-3105, June.
    13. Biggar, Darryl R. & Hesamzadeh, Mohammad Reza, 2022. "An integrated theory of dispatch and hedging in wholesale electric power markets," Energy Economics, Elsevier, vol. 112(C).
    14. Leuthold, Florian & Jeske, Till & Weigt, Hannes & von Hirschhausen, Christian, 2009. "When the Wind Blows Over Europe: A Simulation Analysis and the Impact of Grid Extensions," MPRA Paper 65655, University Library of Munich, Germany.
    15. Richard O’Neill & Emily Fisher & Benjamin Hobbs & Ross Baldick, 2008. "Towards a complete real-time electricity market design," Journal of Regulatory Economics, Springer, vol. 34(3), pages 220-250, December.
    16. Stephen C. Littlechild & Carlos J. Skerk, 2004. "Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line," Working Papers EP61, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    17. Makoto TANAKA, 2005. "Optimal Transmission Capacity under Nodal Pricing and Incentive Regulation for Transco," Discussion papers 05021, Research Institute of Economy, Trade and Industry (RIETI).
    18. Matsukawa, Isamu, 2008. "The effects of average revenue regulation on electricity transmission investment and pricing," Energy Economics, Elsevier, vol. 30(3), pages 696-714, May.
    19. Francisco Munoz & Enzo Sauma & Benjamin Hobbs, 2013. "Approximations in power transmission planning: implications for the cost and performance of renewable portfolio standards," Journal of Regulatory Economics, Springer, vol. 43(3), pages 305-338, June.
    20. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 2: The Fourth Line revisited," Energy Economics, Elsevier, vol. 30(4), pages 1385-1419, July.

    More about this item

    Keywords

    Regulation; Commitment; Capacity markets; Transmission system investment; D44; D47; K23; L51; L94;
    All these keywords.

    JEL classification:

    • D44 - Microeconomics - - Market Structure, Pricing, and Design - - - Auctions
    • D47 - Microeconomics - - Market Structure, Pricing, and Design - - - Market Design
    • K23 - Law and Economics - - Regulation and Business Law - - - Regulated Industries and Administrative Law
    • L51 - Industrial Organization - - Regulation and Industrial Policy - - - Economics of Regulation
    • L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:kap:regeco:v:44:y:2013:i:3:p:287-307. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.