Network expansion by a proactive transmission system operator: A case study
Author
Abstract
Suggested Citation
DOI: 10.1016/j.enpol.2014.03.002
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Journal of Regulatory Economics, Springer, vol. 36(2), pages 127-153, October.
- Vajjhala, Shalini P. & Fischbeck, Paul S., 2007.
"Quantifying siting difficulty: A case study of US transmission line siting,"
Energy Policy, Elsevier, vol. 35(1), pages 650-671, January.
- Fischbeck, Paul & Vajjhala, Shalini, 2006. "Quantifying Siting Difficulty: A Case Study of U.S. Transmission Line Siting," RFF Working Paper Series dp-06-03, Resources for the Future.
- Wu, F.F & Zheng, F.L. & Wen, F.S., 2006. "Transmission investment and expansion planning in a restructured electricity market," Energy, Elsevier, vol. 31(6), pages 954-966.
- Severin Borenstein & James. Bushnell & Steven Stoft, 2000.
"The Competitive Effects of Transmission Capacity in A Deregulated Electricity Industry,"
RAND Journal of Economics, The RAND Corporation, vol. 31(2), pages 294-325, Summer.
- Severin Borenstein & James Bushnell & Steven Stoft, 1997. "The Competitive Effects of Transmission Capacity in a Deregulated Electricity Industry," NBER Working Papers 6293, National Bureau of Economic Research, Inc.
- Berenstein, Severin & Bushnell, James & Stoft, Steven, 2000. "The Competitive Effects of Transmission Capacity in a Deregulated Electricity Industry," Staff General Research Papers Archive 13145, Iowa State University, Department of Economics.
- Garrone, Paola & Groppi, Angelamaria, 2012. "Siting locally-unwanted facilities: What can be learnt from the location of Italian power plants," Energy Policy, Elsevier, vol. 45(C), pages 176-186.
- McLaren Loring, Joyce, 2007. "Wind energy planning in England, Wales and Denmark: Factors influencing project success," Energy Policy, Elsevier, vol. 35(4), pages 2648-2660, April.
- Vincent Rious & Yannick Perez & Philippe Dessante, 2008.
"Is combination of nodal pricing and average participation tariff the best solution to coordinate the location of power plants with lumpy transmission investments?,"
Post-Print
hal-00323878, HAL.
- Vincent Rious & Philippe Dessante & Yannick Perez, 2009. "Is combination of nodal pricing and average participation tariff the best solution to coordinate the location of power plants with lumpy transmission investments?," RSCAS Working Papers 2009/14, European University Institute.
- Hirst, Eric & Kirby, Brendan, 2001. "Key Transmission Planning Issues," The Electricity Journal, Elsevier, vol. 14(8), pages 59-70, October.
- Rious Vincent & Perez Yannick & Glachant Jean-Michel, 2011.
"Power Transmission Network Investment as an Anticipation Problem,"
Review of Network Economics, De Gruyter, vol. 10(4), pages 1-23, December.
- Vincent Rious & Yannick Perez & Jean-Michel Glachant, 2011. "Power Transmission Network Investment as an Anticipation Problem," Post-Print hal-01424616, HAL.
- Ciupuliga, A.R. & Cuppen, E., 2013. "The role of dialogue in fostering acceptance of transmission lines: the case of a France–Spain interconnection project," Energy Policy, Elsevier, vol. 60(C), pages 224-233.
- Benjamin, Richard, 2007. "Principles for Interregional Transmission Expansion," The Electricity Journal, Elsevier, vol. 20(8), pages 36-47, October.
- Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Post-Print hal-02402972, HAL.
- Buijs, Patrik & Bekaert, David & Cole, Stijn & Van Hertem, Dirk & Belmans, Ronnie, 2011. "Transmission investment problems in Europe: Going beyond standard solutions," Energy Policy, Elsevier, vol. 39(3), pages 1794-1801, March.
- Enzo Sauma & Shmuel Oren, 2006. "Proactive planning and valuation of transmission investments in restructured electricity markets," Journal of Regulatory Economics, Springer, vol. 30(3), pages 358-387, November.
- Vincent Rious & Jean-Michel Glachant & Philippe Dessante, 2010. "Transmission Network Investment as an Anticipation Problem," RSCAS Working Papers 2010/04, European University Institute.
- Enzo Sauma & Shmuel Oren, 2006. "Proactive planning and valuation of transmission investments in restructured electricity markets," Journal of Regulatory Economics, Springer, vol. 30(3), pages 261-290, November.
- Devine-Wright, Patrick & Devine-Wright, Hannah & Sherry-Brennan, Fionnguala, 2010. "Visible technologies, invisible organisations: An empirical study of public beliefs about electricity supply networks," Energy Policy, Elsevier, vol. 38(8), pages 4127-4134, August.
- Carlo Cambini & Laura Rondi, 2010. "Incentive regulation and investment: evidence from European energy utilities," Journal of Regulatory Economics, Springer, vol. 38(1), pages 1-26, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Athawale, Rasika & Felder, Frank A., 2023. "Overbuilding transmission: A case study and policy analysis of the Indian power sector," Energy Policy, Elsevier, vol. 174(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Höffler, Felix & Wambach, Achim, 2013. "Investment Coordination in Network Industries: The Case of Electricity Grid and Electricity," EWI Working Papers 2013-12, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Chao, Hung-po & Wilson, Robert, 2020. "Coordination of electricity transmission and generation investments," Energy Economics, Elsevier, vol. 86(C).
- de Nooij, Michiel, 2011. "Social cost-benefit analysis of electricity interconnector investment: A critical appraisal," Energy Policy, Elsevier, vol. 39(6), pages 3096-3105, June.
- Felix Höffler & Achim Wambach, 2013. "Investment coordination in network industries: the case of electricity grid and electricity generation," Journal of Regulatory Economics, Springer, vol. 44(3), pages 287-307, December.
- Nardi, Paolo, 2012. "Transmission network unbundling and grid investments: Evidence from the UCTE countries," Utilities Policy, Elsevier, vol. 23(C), pages 50-58.
- Rious Vincent & Perez Yannick & Glachant Jean-Michel, 2011.
"Power Transmission Network Investment as an Anticipation Problem,"
Review of Network Economics, De Gruyter, vol. 10(4), pages 1-23, December.
- Vincent Rious & Yannick Perez & Jean-Michel Glachant, 2011. "Power Transmission Network Investment as an Anticipation Problem," Post-Print hal-01424616, HAL.
- Wolf-Peter Schill & Jonas Egerer & Juan Rosellón, 2015.
"Testing regulatory regimes for power transmission expansion with fluctuating demand and wind generation,"
Journal of Regulatory Economics, Springer, vol. 47(1), pages 1-28, February.
- Schill, Wolf-Peter & Egerer, Jonas & Rosellón, Juan, 2015. "Testing Regulatory Regimes for Power Transmission Expansion with Fluctuating Demand and Wind Generation," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 47(1), pages 1-28.
- Ruderer, Dominik & Zöttl, Gregor, 2018. "Transmission pricing and investment incentives," Utilities Policy, Elsevier, vol. 55(C), pages 14-30.
- Zenón, Eric & Rosellón, Juan, 2017.
"Optimal transmission planning under the Mexican new electricity market,"
Energy Policy, Elsevier, vol. 104(C), pages 349-360.
- Juan Rosellón & Eric Zenón, 2016. "Optimal Transmission Planning under the Mexican New Electricity Market," Working Papers DTE 598, CIDE, División de Economía.
- Jacques Pelkmans & Lionel Kapff, 2010. "Interconnector Investment for a Well-functioning Internal Market. What EU regime of regulatory incentives?," Bruges European Economic Research Papers 18, European Economic Studies Department, College of Europe.
- Leuthold, Florian & Jeske, Till & Weigt, Hannes & von Hirschhausen, Christian, 2009. "When the Wind Blows Over Europe: A Simulation Analysis and the Impact of Grid Extensions," MPRA Paper 65655, University Library of Munich, Germany.
- Fürsch, Michaela & Hagspiel, Simeon & Jägemann, Cosima & Nagl, Stephan & Lindenberger, Dietmar & Tröster, Eckehard, 2013.
"The role of grid extensions in a cost-efficient transformation of the European electricity system until 2050,"
Applied Energy, Elsevier, vol. 104(C), pages 642-652.
- Fürsch, Michaela & Hagspiel, Simeon & Jägemann, Cosima & Nagl, Stephan & Lindenberger, Dietmar & Tröster, Eckehard, 2012. "The role of grid extensions in a cost-efficient transformation of the European electricity system until 2050," EWI Working Papers 2012-4, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Martin Weibelzahl & Alexandra Märtz, 2020. "Optimal storage and transmission investments in a bilevel electricity market model," Annals of Operations Research, Springer, vol. 287(2), pages 911-940, April.
- Paul Simshauser & Farhad Billimoria & Craig Rogers, 2021.
"Optimising VRE plant capacity in Renewable Energy Zones,"
Working Papers
EPRG2121, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P. & Billimoria, F. & Rogers, C., 2021. "Optimising VRE Plant Capacity in Renewable Energy Zones," Cambridge Working Papers in Economics 2164, Faculty of Economics, University of Cambridge.
- Leonardo Meeus, 2015.
"Offshore grids for renewables: do we need a particular regulatory framework?,"
Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 1).
- Leonardo Meeus, 2014. "Offshore grids for renewables: do we need a particular regulatory framework?," RSCAS Working Papers 2014/24, European University Institute.
- Grimm, Veronika & Martin, Alexander & Weibelzahl, Martin & Zöttl, Gregor, 2014. "Transmission and Generation Investment in Electricity Markets: The Effects of Market Splitting and Network Fee Regimes," Discussion Paper Series of SFB/TR 15 Governance and the Efficiency of Economic Systems 460, Free University of Berlin, Humboldt University of Berlin, University of Bonn, University of Mannheim, University of Munich.
- Simshauser, Paul, 2021.
"Renewable Energy Zones in Australia's National Electricity Market,"
Energy Economics, Elsevier, vol. 101(C).
- Paul Simshauser, 2021. "Renewable Energy Zones in Australia’s National Electricity Market," Working Papers EPRG2103, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, Paul & Billimoria, Farhad & Rogers, Craig, 2022. "Optimising VRE capacity in Renewable Energy Zones," Energy Economics, Elsevier, vol. 113(C).
- Bertsch, Joachim & Hagspiel, Simeon & Just, Lisa, 2016. "Congestion management in power systems - Long-term modeling framework and large-scale application," EWI Working Papers 2015-3, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Vincent Rious & Jean-Michel Glachant & Philippe Dessante, 2010. "Transmission Network Investment as an Anticipation Problem," RSCAS Working Papers 2010/04, European University Institute.
More about this item
Keywords
Transmission network; Investment planning; Anticipation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:enepol:v:69:y:2014:i:c:p:610-623. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/enpol .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.