Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.1040.0144
Download full text from publisher
References listed on IDEAS
- Armstrong, Ronald & Lei, Lei & Gu, Shanhong, 1994. "A bounding scheme for deriving the minimal cycle time of a single-transporter N-stage process with time-window constraints," European Journal of Operational Research, Elsevier, vol. 78(1), pages 130-140, October.
- Itzhak Gilboa, 1989.
"A Necessary but Insufficient Condition for the Stochastic Binary Choice Problem,"
Discussion Papers
818, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
- Itzhak Gilboa, 1990. "A necessary but insufficient condition for the stochastic binary choice problem," Post-Print hal-00481658, HAL.
- Y. Crama & V. Kats & J. van de Klundert & E. Levner, 2000. "Cyclic scheduling in robotic flowshops," Annals of Operations Research, Springer, vol. 96(1), pages 97-124, November.
- Leung, J. & Lee, J., 1994. "More facets from fences for linear ordering and acyclic subgraph polytopes," LIDAM Reprints CORE 1087, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Lei Lei & Tzyh-Jong Wang, 1991. "The Minimum Common-Cycle Algorithm for Cyclic Scheduling of Two Material Handling Hoists with Time Window Constraints," Management Science, INFORMS, vol. 37(12), pages 1629-1639, December.
- Hall, Nicholas G. & Kamoun, Hichem & Sriskandarajah, Chelliah, 1998. "Scheduling in robotic cells: Complexity and steady state analysis," European Journal of Operational Research, Elsevier, vol. 109(1), pages 43-65, August.
- Vladimir Kats & Eugene Levner, 1997. "Minimizing the number of robots to meet a given cyclic schedule," Annals of Operations Research, Springer, vol. 69(0), pages 209-226, January.
- Levner, Eugene & Kats, Vladimir & Levit, Vadim E., 1997. "An improved algorithm for cyclic flowshop scheduling in a robotic cell," European Journal of Operational Research, Elsevier, vol. 97(3), pages 500-508, March.
- Yves Crama & Joris van de Klundert, 1997. "Cyclic Scheduling of Identical Parts in a Robotic Cell," Operations Research, INFORMS, vol. 45(6), pages 952-965, December.
- Chung-Yee Lee & Lei Lei & Michael Pinedo, 1997. "Current trends in deterministic scheduling," Annals of Operations Research, Springer, vol. 70(0), pages 1-41, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Che, Ada & Feng, Jianguang & Chen, Haoxun & Chu, Chengbin, 2015. "Robust optimization for the cyclic hoist scheduling problem," European Journal of Operational Research, Elsevier, vol. 240(3), pages 627-636.
- Xin Li & Richard Y. K. Fung, 2016. "Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times," Journal of Scheduling, Springer, vol. 19(2), pages 165-176, April.
- Che, Ada & Chu, Chengbin, 2009. "Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots," European Journal of Operational Research, Elsevier, vol. 199(1), pages 77-88, November.
- Boysen, Nils & Briskorn, Dirk & Meisel, Frank, 2017. "A generalized classification scheme for crane scheduling with interference," European Journal of Operational Research, Elsevier, vol. 258(1), pages 343-357.
- Che, Ada & Kats, Vladimir & Levner, Eugene, 2017. "An efficient bicriteria algorithm for stable robotic flow shop scheduling," European Journal of Operational Research, Elsevier, vol. 260(3), pages 964-971.
- Reinhard Bürgy & Heinz Gröflin, 2016. "The blocking job shop with rail-bound transportation," Journal of Combinatorial Optimization, Springer, vol. 31(1), pages 152-181, January.
- Tharanga Rajapakshe & Milind Dawande & Chelliah Sriskandarajah, 2011. "Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-Cell Manufacturing," Operations Research, INFORMS, vol. 59(2), pages 440-454, April.
- Milind Dawande & Michael Pinedo & Chelliah Sriskandarajah, 2009. "Multiple Part-Type Production in Robotic Cells: Equivalence of Two Real-World Models," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 210-228, February.
- Boysen, Nils & Briskorn, Dirk & Fedtke, Stefan & Schmickerath, Marcel, 2019. "Automated sortation conveyors: A survey from an operational research perspective," European Journal of Operational Research, Elsevier, vol. 276(3), pages 796-815.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Drobouchevitch, Inna G. & Sethi, Suresh P. & Sriskandarajah, Chelliah, 2006. "Scheduling dual gripper robotic cell: One-unit cycles," European Journal of Operational Research, Elsevier, vol. 171(2), pages 598-631, June.
- Chelliah Sriskandarajah & Inna Drobouchevitch & Suresh P. Sethi & Ramaswamy Chandrasekaran, 2004. "Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot," Operations Research, INFORMS, vol. 52(1), pages 65-82, February.
- Drobouchevitch, Inna G. & Neil Geismar, H. & Sriskandarajah, Chelliah, 2010. "Throughput optimization in robotic cells with input and output machine buffers: A comparative study of two key models," European Journal of Operational Research, Elsevier, vol. 206(3), pages 623-633, November.
- Che, Ada & Chu, Chengbin, 2009. "Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots," European Journal of Operational Research, Elsevier, vol. 199(1), pages 77-88, November.
- Milind Dawande & Michael Pinedo & Chelliah Sriskandarajah, 2009. "Multiple Part-Type Production in Robotic Cells: Equivalence of Two Real-World Models," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 210-228, February.
- Jiyin Liu & Yun Jiang, 2005. "An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem," Operations Research, INFORMS, vol. 53(2), pages 313-327, April.
- Tharanga Rajapakshe & Milind Dawande & Chelliah Sriskandarajah, 2011. "Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-Cell Manufacturing," Operations Research, INFORMS, vol. 59(2), pages 440-454, April.
- W Zahrouni & H Kamoun, 2011. "Transforming part-sequencing problems in a robotic cell into a GTSP," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 114-123, January.
- Gultekin, Hakan & Akturk, M. Selim & Karasan, Oya Ekin, 2006. "Cyclic scheduling of a 2-machine robotic cell with tooling constraints," European Journal of Operational Research, Elsevier, vol. 174(2), pages 777-796, October.
- Che, Ada & Chabrol, Michelle & Gourgand, Michel & Wang, Yuan, 2012. "Scheduling multiple robots in a no-wait re-entrant robotic flowshop," International Journal of Production Economics, Elsevier, vol. 135(1), pages 199-208.
- Neil Geismar, H. & Dawande, Milind & Sriskandarajah, Chelliah, 2005. "Approximation algorithms for k-unit cyclic solutions in robotic cells," European Journal of Operational Research, Elsevier, vol. 162(2), pages 291-309, April.
- Xin Li & Richard Y. K. Fung, 2016. "Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times," Journal of Scheduling, Springer, vol. 19(2), pages 165-176, April.
- Paul, Henrik J. & Bierwirth, Christian & Kopfer, Herbert, 2007. "A heuristic scheduling procedure for multi-item hoist production lines," International Journal of Production Economics, Elsevier, vol. 105(1), pages 54-69, January.
- Kats, Vladimir & Lei, Lei & Levner, Eugene, 2008. "Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1196-1211, June.
- Zhili Zhou & Ling Li, 2009. "A solution for cyclic scheduling of multi-hoists without overlapping," Annals of Operations Research, Springer, vol. 168(1), pages 5-21, April.
- Sheen, Gwo-Ji & Liao, Lu-Wen, 2007. "A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags," European Journal of Operational Research, Elsevier, vol. 181(1), pages 102-116, August.
- Milind Dawande & Chelliah Sriskandarajah & Suresh Sethi, 2002. "On Throughput Maximization in Constant Travel-Time Robotic Cells," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 296-312, August.
- Che, Ada & Feng, Jianguang & Chen, Haoxun & Chu, Chengbin, 2015. "Robust optimization for the cyclic hoist scheduling problem," European Journal of Operational Research, Elsevier, vol. 240(3), pages 627-636.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
- Hichem Kamoun & Nicholas G. Hall & Chelliah Sriskandarajah, 1999. "Scheduling in Robotic Cells: Heuristics and Cell Design," Operations Research, INFORMS, vol. 47(6), pages 821-835, December.
More about this item
Keywords
mixed integer programming; applications; formulation; production/scheduling; applications; cyclic scheduling; industries; chemical; electric; hoist scheduling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:52:y:2004:i:6:p:965-976. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.