Optimal Updating of Forecasts for the Timing of Future Events
Author
Abstract
Suggested Citation
DOI: 10.1287/mnsc.44.3.321
Download full text from publisher
References listed on IDEAS
- Abraham Seidmann & Milton L. Smith, 1981. "Due Date Assignment for Production Systems," Management Science, INFORMS, vol. 27(5), pages 571-581, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Violetta Bacon-Gerasymenko & Russell Coff & Rodolphe Durand, 2016. "Taking a Second Look in a Warped Crystal Ball: Explaining the Accuracy of Revised Forecasts," Journal of Management Studies, Wiley Blackwell, vol. 53(8), pages 1292-1319, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Azaron, Amir & Fynes, Brian & Modarres, Mohammad, 2011. "Due date assignment in repetitive projects," International Journal of Production Economics, Elsevier, vol. 129(1), pages 79-85, January.
- Pinar Keskinocak & R. Ravi & Sridhar Tayur, 2001. "Scheduling and Reliable Lead-Time Quotation for Orders with Availability Intervals and Lead-Time Sensitive Revenues," Management Science, INFORMS, vol. 47(2), pages 264-279, February.
- Dellaert, N. P. & Melo, M. T., 1996. "Stochastic lot-sizing: Solution and heuristic methods," International Journal of Production Economics, Elsevier, vol. 46(1), pages 261-276, December.
- Mark L. Spearman & Rachel Q. Zhang, 1999. "Optimal Lead Time Policies," Management Science, INFORMS, vol. 45(2), pages 290-295, February.
- Enns, S. T., 1998. "Lead time selection and the behaviour of work flow in job shops," European Journal of Operational Research, Elsevier, vol. 109(1), pages 122-136, August.
- Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.
- (Van) Enns, S. T., 1995. "An economic approach to job shop performance analysis," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 117-131, March.
- van Ooijen, H. P. G. & Bertrand, J. W. M., 2001. "Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 261-268, December.
- Kedar S. Naphade & S. David Wu & Robert H. Storer & Bhavin J. Doshi, 2001. "Melt Scheduling to Trade Off Material Waste and Shipping Performance," Operations Research, INFORMS, vol. 49(5), pages 629-645, October.
- Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2006. "Modelling complex assemblies as a queueing network for lead time control," European Journal of Operational Research, Elsevier, vol. 174(1), pages 150-168, October.
- Seçil Savaşaneril & Paul M. Griffin & Pınar Keskinocak, 2010. "Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue," Operations Research, INFORMS, vol. 58(2), pages 383-395, April.
- Watanapa, Bunthit & Techanitisawad, Anulark, 2005. "Simultaneous price and due date settings for multiple customer classes," European Journal of Operational Research, Elsevier, vol. 166(2), pages 351-368, October.
- Ozturk, Atakan & Kayaligil, Sinan & Ozdemirel, Nur E., 2006. "Manufacturing lead time estimation using data mining," European Journal of Operational Research, Elsevier, vol. 173(2), pages 683-700, September.
- An Pan & Tsan-Ming Choi, 2016. "An agent-based negotiation model on price and delivery date in a fashion supply chain," Annals of Operations Research, Springer, vol. 242(2), pages 529-557, July.
- Perkgoz, Cahit & Azaron, Amir & Katagiri, Hideki & Kato, Kosuke & Sakawa, Masatoshi, 2007. "A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms," European Journal of Operational Research, Elsevier, vol. 180(1), pages 292-308, July.
- ElHafsi, Mohsen, 2000. "An operational decision model for lead-time and price quotation in congested manufacturing systems," European Journal of Operational Research, Elsevier, vol. 126(2), pages 355-370, October.
- Saeed Yaghoubi, 2015. "Due-date assignment for multi-server multi-stage assembly systems," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(7), pages 1246-1256, May.
More about this item
Keywords
Forecasting; Dynamic Programming Applications; Air Transportation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:44:y:1998:i:3:p:321-335. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.