Applications of Building Information Modelling in the Operation and Maintenance Phase of Construction Projects: A Framework for the Malaysian Construction Industry

Author

Listed:
  • Muhammad Ali Musarat

    (Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia
    Offshore Engineering Centre, Institute of Autonomous System, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia)

  • Wesam Salah Alaloul

    (Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia)

  • Lau Siew Cher

    (Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia)

  • Abdul Hannan Qureshi

    (Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia)

  • Aawag Mohsen Alawag

    (Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia)

  • Abdullah O. Baarimah

    (Department of Civil and Environmental Engineering, Universiti Teknologi PETRONAS, Bandar Seri Iskandar 32610, Malaysia)

Abstract

Building information modelling (BIM) is an inventive solution for enhancing the operation and maintenance (O&M) phase of construction projects. However, there is still a small and low level of BIM adoption in the O&M phase of construction projects in Malaysia. Hence, a framework is required for the Malaysian construction industry regarding the adoption of BIM in the O&M phase. The goal of this study is to examine the factors that influence the implementation of BIM technology during the O&M phase. A literature review was performed with more than 50 research papers from the past 10 years. This research was closely evaluated to create a list of barriers and drivers that might affect the application of BIM in the O&M phase. To ensure that these barriers and drivers match Malaysian conditions, a semi-structured interview was performed. Based on this interview, a refined questionnaire was created to gather feedback. Next, an online survey was conducted on 302 Malaysian construction professionals who work in the industry. The collected data were analysed for tests of reliability, validity, correlation, and a relative importance index. As per the findings, most of the respondents were familiar with the use of BIM technology, with 98.7% of the companies they worked at having more than 15 BIM engineers employed at the time of the survey. The lack of learning materials and equipment prepared by the academic institutions were identified as two main aspects requiring attention to improve the utilisation of BIM in the O&M stage. On the other hand, the utilisation of BIM, which increases the efficiency of data accessibility for the O&M personnel, has been rated as the most significant driver. Based on the findings, a conceptual framework was developed to provide insight into the matter and a future direction to overcome the matter. Therefore, this study managed to provide an in-depth perspective for future researchers into the factors that can enhance the implementation of BIM software during the O&M phase of a construction project.

Suggested Citation

  • Muhammad Ali Musarat & Wesam Salah Alaloul & Lau Siew Cher & Abdul Hannan Qureshi & Aawag Mohsen Alawag & Abdullah O. Baarimah, 2023. "Applications of Building Information Modelling in the Operation and Maintenance Phase of Construction Projects: A Framework for the Malaysian Construction Industry," Sustainability, MDPI, vol. 15(6), pages 1-28, March.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:6:p:5044-:d:1095284
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/6/5044/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/6/5044/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Wesam Salah Alaloul & Muhammad Ali Musarat & Muhammad Babar Ali Rabbani & Qaiser Iqbal & Ahsen Maqsoom & Waqas Farooq, 2021. "Construction Sector Contribution to Economic Stability: Malaysian GDP Distribution," Sustainability, MDPI, vol. 13(9), pages 1-26, April.
    2. Hamidreza Alavi & Nuria Forcada, 2022. "User-Centric BIM-Based Framework for HVAC Root-Cause Detection," Energies, MDPI, vol. 15(10), pages 1-13, May.
    3. Rossella Marmo & Maurizio Nicolella & Francesco Polverino & Andrej Tibaut, 2019. "A Methodology for a Performance Information Model to Support Facility Management," Sustainability, MDPI, vol. 11(24), pages 1-25, December.
    4. Muhammad Ali Musarat & Wesam Salah Alaloul & Nasir Hameed & Dhinaharan R & Abdul Hannan Qureshi & Mohamed Mubarak Abdul Wahab, 2022. "Efficient Construction Waste Management: A Solution through Industrial Revolution (IR) 4.0 Evaluated by AHP," Sustainability, MDPI, vol. 15(1), pages 1-16, December.
    5. Muhammad Ali Musarat & Wesam Salah Alaloul & Muhammad Irfan & Pravin Sreenivasan & Muhammad Babar Ali Rabbani, 2022. "Health and Safety Improvement through Industrial Revolution 4.0: Malaysian Construction Industry Case," Sustainability, MDPI, vol. 15(1), pages 1-26, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Guoliang Shi & Zhansheng Liu & Dengzhou Xian & Rongtian Zhang, 2023. "Intelligent Assessment Method of Structural Reliability Driven by Carrying Capacity Sustainable Target: Taking Bearing Capacity as Criterion," Sustainability, MDPI, vol. 15(13), pages 1-18, July.
    2. Muhammad Ali Musarat & Muhammad Irfan & Wesam Salah Alaloul & Ahsen Maqsoom & Maria Ghufran, 2023. "A Review on the Way Forward in Construction through Industrial Revolution 5.0," Sustainability, MDPI, vol. 15(18), pages 1-26, September.
    3. Yuken Ying & Jie Wu & Qilin Zhang & Jin Jin & Pengfei Wang, 2023. "Research on the POPi Digital Model Framework for BIM Implementation in High-Rise Megaprojects," Sustainability, MDPI, vol. 15(15), pages 1-21, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Muhammad Ali Musarat & Muhammad Irfan & Wesam Salah Alaloul & Ahsen Maqsoom & Maria Ghufran, 2023. "A Review on the Way Forward in Construction through Industrial Revolution 5.0," Sustainability, MDPI, vol. 15(18), pages 1-26, September.
    2. Rubén Muñoz Pavón & Antonio A. Arcos Alvarez & Marcos G. Alberti, 2020. "Possibilities of BIM-FM for the Management of COVID in Public Buildings," Sustainability, MDPI, vol. 12(23), pages 1-21, November.
    3. Maria Psillaki & Nikolaos Apostolopoulos & Ilias Makris & Panagiotis Liargovas & Sotiris Apostolopoulos & Panos Dimitrakopoulos & George Sklias, 2023. "Hospitals’ Energy Efficiency in the Perspective of Saving Resources and Providing Quality Services through Technological Options: A Systematic Literature Review," Energies, MDPI, vol. 16(2), pages 1-21, January.
    4. Mario Paguay & Juan Diego Febres & Eduardo Valarezo, 2023. "Occupational Accidents in Ecuador: An Approach from the Construction and Manufacturing Industries," Sustainability, MDPI, vol. 15(16), pages 1-14, August.
    5. Dania K. Abideen & Akilu Yunusa-Kaltungo & Patrick Manu & Clara Cheung, 2022. "A Systematic Review of the Extent to Which BIM Is Integrated into Operation and Maintenance," Sustainability, MDPI, vol. 14(14), pages 1-55, July.
    6. Mari-Isabella Stan, 2021. "Issues concerning the dynamics of labor productivity at the level of the companies in Constanta County operating in the "Construction" sector before and after the COVID-19 pandemic," Technium Social Sciences Journal, Technium Science, vol. 25(1), pages 225-241, November.
    7. Muhammad Ali Musarat & Wesam Salah Alaloul & Nasir Hameed & Dhinaharan R & Abdul Hannan Qureshi & Mohamed Mubarak Abdul Wahab, 2022. "Efficient Construction Waste Management: A Solution through Industrial Revolution (IR) 4.0 Evaluated by AHP," Sustainability, MDPI, vol. 15(1), pages 1-16, December.
    8. M. R. Ibrahim & D. U. Muhammad & B. Muhammad & J. O. Alaezi & J. Agidani, 2023. "The Key to Organizational and construction Excellence: A Study of Total Quality Management," Papers 2305.13104, arXiv.org.
    9. Muhammad Ali Musarat & Alishba Sadiq & Wesam Salah Alaloul & Mohamed Mubarak Abdul Wahab, 2022. "A Systematic Review on Enhancement in Quality of Life through Digitalization in the Construction Industry," Sustainability, MDPI, vol. 15(1), pages 1-20, December.
    10. Rafaela Bortolini & Raul Rodrigues & Hamidreza Alavi & Luisa Felix Dalla Vecchia & Núria Forcada, 2022. "Digital Twins’ Applications for Building Energy Efficiency: A Review," Energies, MDPI, vol. 15(19), pages 1-17, September.
    11. Carsten Juergens & Fabian M. Meyer-Heß & Marcus Goebel & Torsten Schmidt, 2021. "Remote Sensing for Short-Term Economic Forecasts," Sustainability, MDPI, vol. 13(17), pages 1-23, August.
    12. Ahmed Farouk Kineber & Maxwell Fordjour Antwi-Afari & Faris Elghaish & Ahmad M. A. Zamil & Mohammad Alhusban & Thikryat Jibril Obied Qaralleh, 2023. "Benefits of Implementing Occupational Health and Safety Management Systems for the Sustainable Construction Industry: A Systematic Literature Review," Sustainability, MDPI, vol. 15(17), pages 1-35, August.
    13. Rui Feng & Zhuqing Zhang & Zonghao Li & Ge Meng & Jian Liu, 2024. "Building a Sustainable Future: Enhancing Construction Safety through Macro-Level Analysis," Sustainability, MDPI, vol. 16(17), pages 1-27, September.
    14. Muhd Shafiq Johari & Syamsul Hendra Mahmud & Sarajul Fikri Mohamed & Mohd Saidin Misnan & Tantish Kamarudin & Mohd Azwarie Mat Dzahir, 2024. "A SWOT Analysis of Digitalization in the Construction Firm: Challenges and Barriers to Managers Level in Malaysia," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 8(3), pages 1520-1540, March.
    15. Sławomir Biruk & Piotr Jaśkowski & Magdalena Maciaszczyk, 2022. "Conceptual Framework of a Simulation-Based Manpower Planning Method for Construction Enterprises," Sustainability, MDPI, vol. 14(9), pages 1-13, April.
    16. Fatin Khalida Binti Abdul Khadir & Ng Cheng Yee & Husna Binti Takaijudin & Noor Amila Wan Abdullah Zawawi & Wesam Salah Alaloul & Muhammad Ali Musarat, 2023. "Evaluation of the Implementation of Sustainable Stormwater Management Practices for Landed Residential Areas: A Case Study in Malaysia," Sustainability, MDPI, vol. 15(13), pages 1-20, July.
    17. Muhammad Ali Musarat & Wesam Salah Alaloul & Muhammad Irfan & Pravin Sreenivasan & Muhammad Babar Ali Rabbani, 2022. "Health and Safety Improvement through Industrial Revolution 4.0: Malaysian Construction Industry Case," Sustainability, MDPI, vol. 15(1), pages 1-26, December.
    18. Mari-Isabella Stan & Dragos-Florian Vintila, 2021. "Can the Degree of Indebtedness of the Economic Agents Operating in the Construction Sector in Constanta County Influence the Development of the Coastal Area ?," Ovidius University Annals, Economic Sciences Series, Ovidius University of Constantza, Faculty of Economic Sciences, vol. 0(1), pages 163-170, August.
    19. Aawag Mohsen Alawag & Wesam Salah Alaloul & M. S. Liew & Abdullah O. Baarimah & Muhammad Ali Musarat & Al-Baraa Abdulrahman Al-Mekhlafi, 2023. "The Role of the Total-Quality-Management (TQM) Drivers in Overcoming the Challenges of Implementing TQM in Industrialized-Building-System (IBS) Projects in Malaysia: Experts’ Perspectives," Sustainability, MDPI, vol. 15(8), pages 1-21, April.
    20. Prabhu, R. Srinivas & Anuradha, R. & Belin Jude, A., 2022. "Understanding the mining waste as resources in self-compacting concrete: A numerical study on sustainable construction," Resources Policy, Elsevier, vol. 78(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:6:p:5044-:d:1095284. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.