Abstract

The construction industry has a great impact on the environment and, more than ever, bears responsibility for achieving global sustainability goals. Despite the increasing technological development in the industry, information asymmetry between construction project participants affects communication and causes risks that have the potential to seriously harm project goals. The main objective of this systematic review is to collect and analyze existing scientific papers to summarize knowledge on the risks influenced by information asymmetry in construction projects. The established PRISMA 2020 methodology was used to collect and analyze papers from the two largest databases of scientific literature, Web of Science and Scopus. The coding rules were set up to evaluate the 94 articles that were assessed as eligible. Furthermore, the content analysis was applied with a set of coding rules and with the help of the software Mendeley. This study finds that research on risks caused by information asymmetry is still new, limited and not well connected with theoretical concepts. The most common methods used by researchers are simulation and case study. With a thematic analysis of current knowledge, this study provides a synthesis of identified risks, consequences and mitigation measures, as well as directions for future research.

Suggested Citation

  • Ivona Ivić & Anita Cerić, 2023. "Risks Caused by Information Asymmetry in Construction Projects: A Systematic Literature Review," Sustainability, MDPI, vol. 15(13), pages 1-25, June.
  • Handle: RePEc:gam:jsusta:v:15:y:2023:i:13:p:9979-:d:1177502
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/15/13/9979/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/15/13/9979/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Feng Xue & Guangyu Chen & Shanming Huang & Huan Xie, 2022. "Design of Social Responsibility Incentive Contracts for Stakeholders of Megaprojects under Information Asymmetry," Sustainability, MDPI, vol. 14(3), pages 1-20, January.
    2. Kaixun Sha, 2019. "Incentive strategies for construction project manager: a common agency perspective," Construction Management and Economics, Taylor & Francis Journals, vol. 37(8), pages 461-471, August.
    3. Yanchao Du & Hengyu Zhou & Yongbo Yuan & Hong Xue, 2019. "Exploring the Moral Hazard Evolutionary Mechanism for BIM Implementation in an Integrated Project Team," Sustainability, MDPI, vol. 11(20), pages 1-28, October.
    4. Chen-Yu Chang & Graham Ive, 2007. "Reversal of bargaining power in construction projects: meaning, existence and implications," Construction Management and Economics, Taylor & Francis Journals, vol. 25(8), pages 845-855.
    5. Peiyang Su & Ying Peng & Qidan Hu & Ruwen Tan, 2020. "Incentive Mechanism and Subsidy Design for Construction and Demolition Waste Recycling under Information Asymmetry with Reciprocal Behaviors," IJERPH, MDPI, vol. 17(12), pages 1-26, June.
    6. Pengcheng Xiang & Fuyuan Jia & Xiaohui Li, 2018. "Critical Behavioral Risk Factors among Principal Participants in the Chinese Construction Industry," Sustainability, MDPI, vol. 10(9), pages 1-22, September.
    7. Guangdong Wu & Jian Zuo & Xianbo Zhao, 2017. "Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects," Sustainability, MDPI, vol. 9(7), pages 1-20, July.
    8. Huibing Cheng & Shanshui Zheng, 2022. "Incentive Compensation Mechanism for the Infrastructure Construction of Electric Vehicle Battery Swapping Station under Asymmetric Information," Sustainability, MDPI, vol. 14(12), pages 1-18, June.
    9. Gregory Lewis & Patrick Bajari, 2014. "Moral Hazard, Incentive Contracts, and Risk: Evidence from Procurement," The Review of Economic Studies, Review of Economic Studies Ltd, vol. 81(3), pages 1201-1228.
    10. Tim Snippert & Wiebe Witteveen & Hans Boes & Hans Voordijk, 2015. "Barriers to realizing a stewardship relation between client and vendor: the Best Value approach," Construction Management and Economics, Taylor & Francis Journals, vol. 33(7), pages 569-586, July.
    11. Xin Liang & Geoffrey Qiping Shen & Li Guo, 2019. "Optimizing Incentive Policy of Energy-Efficiency Retrofit in Public Buildings: A Principal-Agent Model," Sustainability, MDPI, vol. 11(12), pages 1-19, June.
    12. Feser, Daniel & Runst, Petrik, 2016. "Energy efficiency consultants as change agents? Examining the reasons for EECs’ limited success," Energy Policy, Elsevier, vol. 98(C), pages 309-317.
    13. Gonzalez-Diaz, Manuel & Arrunada, Benito & Fernandez, Alberto, 2000. "Causes of subcontracting: evidence from panel data on construction firms," Journal of Economic Behavior & Organization, Elsevier, vol. 42(2), pages 167-187, June.
    14. Wang, Yinglin & Gao, Huaizhu Oliver & Liu, Jicai, 2019. "Incentive game of investor speculation in PPP highway projects based on the government minimum revenue guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 125(C), pages 20-34.
    15. Jin Wook Kim & Cheong Kyu Park, 2023. "Can ESG Performance Mitigate Information Asymmetry? Moderating Effect of Assurance Services," Applied Economics, Taylor & Francis Journals, vol. 55(26), pages 2993-3007, June.
    16. Haikun Han & Juqin Shen & Bo Liu & Han Han, 2022. "Dynamic Incentive Mechanism for Large-scale Projects Based on the Reputation Effects," SAGE Open, , vol. 12(4), pages 21582440221, October.
    17. Bent Flyvbjerg, 2014. "What You Should Know About Megaprojects, and Why: An Overview," Papers 1409.0003, arXiv.org.
    18. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
    19. Giraudet, Louis-Gaëtan, 2020. "Energy efficiency as a credence good: A review of informational barriers to energy savings in the building sector," Energy Economics, Elsevier, vol. 87(C).
    20. Graham Ive & Chen-Yu Chang, 2007. "The principle of inconsistent trinity in the selection of procurement systems," Construction Management and Economics, Taylor & Francis Journals, vol. 25(7), pages 677-690.
    21. Reza Kiani Mavi & Denise Gengatharen & Neda Kiani Mavi & Richard Hughes & Alistair Campbell & Ross Yates, 2021. "Sustainability in Construction Projects: A Systematic Literature Review," Sustainability, MDPI, vol. 13(4), pages 1-24, February.
    22. Tianyu Ma & Zhuofu Wang & Jiyong Ding, 2018. "Governing the Moral Hazard in China’s Sponge City Projects: A Managerial Analysis of the Construction in the Non-Public Land," Sustainability, MDPI, vol. 10(9), pages 1-15, August.
    23. Xun Liu & Sen Lin & Lixing Liu & Fei Qian & Kun Zhang, 2020. "Exploring the Factors Triggering Occupational Ethics Risk of Technology Transaction in Chinese Construction Industry," IJERPH, MDPI, vol. 17(4), pages 1-18, February.
    24. Chantal C. Cantarelli & Caspar G. Chorus & Scott W. Cunningham, 2013. "Explaining Cost Overruns of Large-Scale Transportation Infrastructure Projects using a Signalling Game," Papers 1307.2180, arXiv.org.
    25. Missbauer, Hubert & Hauber, Wolfgang, 2006. "Bid calculation for construction projects: Regulations and incentive effects of unit price contracts," European Journal of Operational Research, Elsevier, vol. 171(3), pages 1005-1019, June.
    26. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    27. Lampel, Joseph & Miller, Roger & Floricel, Serghei, 1996. "Impact of owner involvement on innovation in large projects: Lessons from power plants construction," International Business Review, Elsevier, vol. 5(6), pages 561-578, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Iliyasu Abdullahi & Casey Watters & Georgios Kapogiannis & Michal K. Lemański, 2023. "Role of Digital Strategy in Managing the Planning Complexity of Mega Construction Projects," Sustainability, MDPI, vol. 15(18), pages 1-18, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ivona Ivić & Anita Cerić, 2024. "Mitigation Measures for Information Asymmetry between Participants in Construction Projects: The Impact of Trust," Sustainability, MDPI, vol. 16(16), pages 1-27, August.
    2. Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
    3. Ginés de Rus & Javier Campos & Daniel Graham & M. Pilar Socorro & Jorge Valido, 2020. "Evaluación Económica de Proyectos y Políticas de Transporte: Metodología y Aplicaciones. Parte 1: Metodología para el análisis coste-beneficio de proyectos y políticas de transporte," Working Papers 2020-11, FEDEA.
    4. Flyvbjerg, Bent & Bester, Dirk W., 2021. "The Cost-Benefit Fallacy: Why Cost-Benefit Analysis Is Broken and How to Fix It," Journal of Benefit-Cost Analysis, Cambridge University Press, vol. 12(3), pages 395-419, October.
    5. Alfonso Marino & Paolo Pariso & Michele Picariello, 2023. "Energy use and End-use Technologies: Organizational and Energy Analysis in Italian Hospitals," International Journal of Energy Economics and Policy, Econjournals, vol. 13(3), pages 36-45, May.
    6. Zeng, Nengmin & Wu, Guangdong & Zeng, Dongling & Liu, Ang & Ren, Tinghai & Liu, Bingsheng, 2023. "Optimal mechanism for project splitting with time cost and asymmetric information," International Journal of Production Economics, Elsevier, vol. 264(C).
    7. Tianyu Ma & Jiyong Ding & Zhuofu Wang & Miroslaw J. Skibniewski, 2020. "Governing Government-Project Owner Relationships in Water Megaprojects: a Concession Game Analysis on Allocation of Control Rights," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 34(13), pages 4003-4018, October.
    8. Shi, Shasha & Tuo, Yuhui & Pan, Meixu & Yin, Yafeng & Chen, Yue & Zhou, Xiongwei & Chen, Ke, 2024. "Signaling contracts design for Build–Operate–Transfer roads under asymmetric traffic demand information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 183(C).
    9. Ceric Anita & Ivic Ivona, 2021. "Network analysis of interconnections between theoretical concepts associated with principal–agent theory concerning construction projects," Organization, Technology and Management in Construction, Sciendo, vol. 13(2), pages 2450-2464, January.
    10. Diane Coyle & Marianne Sensier, 2020. "The imperial treasury: appraisal methodology and regional economic performance in the UK," Regional Studies, Taylor & Francis Journals, vol. 54(3), pages 283-295, March.
    11. Schreiner, Lena & Madlener, Reinhard, 2022. "Investing in power grid infrastructure as a flexibility option: A DSGE assessment for Germany," Energy Economics, Elsevier, vol. 107(C).
    12. Alexander Budzier & Bent Flyvbjerg & Andi Garavaglia & Andreas Leed, 2019. "Quantitative Cost and Schedule Risk Analysis of Nuclear Waste Storage," Papers 1901.11123, arXiv.org.
    13. Francesco Di Maddaloni & Roya Derakhshan, 2019. "A Leap from Negative to Positive Bond. A Step towards Project Sustainability," Administrative Sciences, MDPI, vol. 9(2), pages 1-19, June.
    14. Bent Flyvbjerg & Alexander Budzier & M. D. Christodoulou & M. Zottoli, 2024. "Uniqueness Bias: Why It Matters, How to Curb It," Papers 2408.07710, arXiv.org.
    15. Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Molin, Eric & Rønnest, Arne & Stewa, 2019. "On de-bunking “Fake News” in the post-truth era: How to reduce statistical error in research," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 409-411.
    16. Xinxin Liu & Xiaosheng Wang & Haiying Guo & Xiaojie An, 2021. "Benefit Allocation in Shared Water-Saving Management Contract Projects Based on Modified Expected Shapley Value," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 35(1), pages 39-62, January.
    17. Finocchiaro Castro, Massimo & Guccio, Calogero & Rizzo, Ilde, 2023. "“One-size-fits-all” public works contract does it better? An assessment of infrastructure provision in Italy," Journal of Policy Modeling, Elsevier, vol. 45(5), pages 994-1014.
    18. Love, Peter E.D. & Ahiaga-Dagbui, Dominic & Welde, Morten & Odeck, James, 2017. "Light rail transit cost performance: Opportunities for future-proofing," Transportation Research Part A: Policy and Practice, Elsevier, vol. 100(C), pages 27-39.
    19. Bent Flyvbjerg & Alexander Budzier, 2018. "Report for the Edinburgh Tram Inquiry," Papers 1805.12106, arXiv.org.
    20. Karen Lucas & Ian Philips & Ersilia Verlinghieri, 2022. "A mixed methods approach to the social assessment of transport infrastructure projects," Transportation, Springer, vol. 49(1), pages 271-291, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:15:y:2023:i:13:p:9979-:d:1177502. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.