IDEAS home Printed from https://ideas.repec.org/a/gam/jsusta/v14y2022i8p4442-d789535.html
   My bibliography  Save this article

A Fuzzy Risk Assessment Model for Small Scale Construction Work

Author

Listed:
  • Sabriye Topal

    (Department of Industrial Engineering, Eastern Mediterranean University, Famagusta 99628, Cyprus
    Department of Basic Sciences and Humanities, Cyprus International University, Nicosia 99258, Cyprus)

  • Emine Atasoylu

    (Department of Industrial Engineering, Eastern Mediterranean University, Famagusta 99628, Cyprus)

Abstract

Occupational risk assessment is important for providing employees with a safe and healthy work environment. When compared with other industries, the construction industry poses a higher risk for accidents due to the variety and complexity of skills required for different types of work in the sector. Small-sized construction sites have a higher risk of occupational injury. Countries without occupational safety and health (OSH) enforcement pose an additional risk increasing the need of an effective and easy-to-apply risk assessment approach. This research aims to develop and study an easy to apply risk assessment model for small-scale construction sites. The method includes opinions from experts on safety, checklists to estimate the possibility of occurrence of accidents, the identification of current site-specific safety levels, the severity of risk, and safety barriers. The model uses both historical data and fuzzy approaches to calculate risk level and was applied to four different construction sites in North Cyprus. Results reveal the risk level for each accident type and the aggregate safety level of the construction sites. Falling from height was identified as the most common accident type with the highest risk level. This study contributes to the development of sustainable OSH management systems for construction companies by highlighting the measures that must be taken to reduce occupational accidents.

Suggested Citation

  • Sabriye Topal & Emine Atasoylu, 2022. "A Fuzzy Risk Assessment Model for Small Scale Construction Work," Sustainability, MDPI, vol. 14(8), pages 1-17, April.
  • Handle: RePEc:gam:jsusta:v:14:y:2022:i:8:p:4442-:d:789535
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2071-1050/14/8/4442/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2071-1050/14/8/4442/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Min-Sung Kim & Eul-Bum Lee & In-Hye Jung & Douglas Alleman, 2018. "Risk Assessment and Mitigation Model for Overseas Steel-Plant Project Investment with Analytic Hierarchy Process—Fuzzy Inference System," Sustainability, MDPI, vol. 10(12), pages 1-17, December.
    2. J. H. M. Tah & V. Carr, 2000. "A proposal for construction project risk assessment using fuzzy logic," Construction Management and Economics, Taylor & Francis Journals, vol. 18(4), pages 491-500.
    3. Arkadiy Larionov & Ekaterina Nezhnikova & Elena Smirnova, 2021. "Risk Assessment Models to Improve Environmental Safety in the Field of the Economy and Organization of Construction: A Case Study of Russia," Sustainability, MDPI, vol. 13(24), pages 1-37, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Huibing Cheng & Shanshui Zheng & Jianghong Feng, 2022. "A Fuzzy Multi-Criteria Method for Sustainable Ferry Operator Selection: A Case Study," Sustainability, MDPI, vol. 14(10), pages 1-22, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Aleksandar Senić & Momčilo Dobrodolac & Zoran Stojadinović, 2024. "Predicting Extension of Time and Increasing Contract Price in Road Infrastructure Projects Using a Sugeno Fuzzy Logic Model," Mathematics, MDPI, vol. 12(18), pages 1-22, September.
    2. Hani Alyami & Paul Tae-Woo Lee & Zaili Yang & Ramin Riahi & Stephen Bonsall & Jin Wang, 2014. "An advanced risk analysis approach for container port safety evaluation," Maritime Policy & Management, Taylor & Francis Journals, vol. 41(7), pages 634-650, December.
    3. Edwin Thomas Banobi & Wooyong Jung, 2019. "Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects," Sustainability, MDPI, vol. 11(21), pages 1-16, October.
    4. Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
    5. Patricia Romero-Lankao & Daniel M. Gnatz & Olga Wilhelmi & Mary Hayden, 2016. "Urban Sustainability and Resilience: From Theory to Practice," Sustainability, MDPI, vol. 8(12), pages 1-19, November.
    6. Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
    7. Usama H. Issa & Ashraf Balabel & Mohammed Abdelhakeem & Medhat M. A. Osman, 2021. "Developing a Risk Model for Assessment and Control of the Spread of COVID-19," Risks, MDPI, vol. 9(2), pages 1-15, February.
    8. Usama Issa & Ibrahim Sharaky & Mamdooh Alwetaishi & Ashraf Balabel & Amal Shamseldin & Ahmed Abdelhafiz & Mohammed Al-Surf & Mosleh Al-Harthi & Medhat M. A. Osman, 2021. "Developing and Applying a Model for Evaluating Risks Affecting Greening Existing Buildings," Sustainability, MDPI, vol. 13(11), pages 1-21, June.
    9. Cabrera Llanos, Agustín I. & Ortiz Arango, Francisco & Dávila Aragón, Griselda, 2022. "Caracterización de la productividad de una empresa mexicana desarrolladora de tecnología mediante control difuso [Characterization of the productivity of a Mexican technology development company th," Revista de Métodos Cuantitativos para la Economía y la Empresa = Journal of Quantitative Methods for Economics and Business Administration, Universidad Pablo de Olavide, Department of Quantitative Methods for Economics and Business Administration, vol. 34(1), pages 281-304, December.
    10. Nasanjargal Erdenekhuu & Balázs Kocsi & Domicián Máté, 2022. "A Risk-Based Analysis Approach to Sustainable Construction by Environmental Impacts," Energies, MDPI, vol. 15(18), pages 1-21, September.
    11. Ning Wang & Cheng-shun Xu & Xiu-li Du & Ming-ju Zhang, 2018. "A risk assessment method of deep excavation based on Bayesian analysis and expert elicitation," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(2), pages 452-466, April.
    12. da Cunha, Richard Alex & Rangel, Luís Alberto Duncan & Rudolf, Christian A. & Santos, Luiza dos, 2022. "A decision support approach employing the PROMETHEE method and risk factors for critical supply assessment in large-scale projects," Operations Research Perspectives, Elsevier, vol. 9(C).
    13. Hasan Mahmoud & Vian Ahmed & Salwa Beheiry, 2021. "Construction Cash Flow Risk Index," JRFM, MDPI, vol. 14(6), pages 1-17, June.
    14. Justyna Kozłowska & Marco Antônio Benvenga & Irenilza de Alencar Nääs, 2022. "Investment Risk and Energy Security Assessment of European Union Countries Using Multicriteria Analysis," Energies, MDPI, vol. 16(1), pages 1-28, December.
    15. Seyed Morteza Hatefi & Mohammad Ehsan Basiri & Jolanta Tamošaitienė, 2019. "An Evidential Model for Environmental Risk Assessment in Projects Using Dempster–Shafer Theory of Evidence," Sustainability, MDPI, vol. 11(22), pages 1-16, November.
    16. Gu, Shuang & Li, Keping & Feng, Tao & Yan, Dongyang & Liu, Yanyan, 2022. "The prediction of potential risk path in railway traffic events," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    17. Andrea Senova & Alica Tobisova & Robert Rozenberg, 2023. "New Approaches to Project Risk Assessment Utilizing the Monte Carlo Method," Sustainability, MDPI, vol. 15(2), pages 1-19, January.
    18. John Malu Nzioki & Dr. Mary Nyawira Mwenda, 2021. "Enhancing Performance of the Building Construction Industry through Quantitative Risk Analysis and Risk Response: A Case of Exchequer Funded Building Construction Projects in Machakos County, Kenya," International Journal of Research and Innovation in Social Science, International Journal of Research and Innovation in Social Science (IJRISS), vol. 5(3), pages 31-39, March.
    19. Huiru Zhao & Nana Li, 2015. "Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability," Sustainability, MDPI, vol. 7(3), pages 1-30, March.
    20. Rao Rao & Xingping Zhang & Zhiping Shi & Kaiyan Luo & Zhongfu Tan & Yifan Feng, 2014. "A Systematical Framework of Schedule Risk Management for Power Grid Engineering Projects’ Sustainable Development," Sustainability, MDPI, vol. 6(10), pages 1-30, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:14:y:2022:i:8:p:4442-:d:789535. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.