A risk assessment method of deep excavation based on Bayesian analysis and expert elicitation
Author
Abstract
Suggested Citation
DOI: 10.1007/s13198-017-0689-2
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wu, Xianguo & Liu, Huitao & Zhang, Limao & Skibniewski, Miroslaw J. & Deng, Qianli & Teng, Jiaying, 2015. "A dynamic Bayesian network based approach to safety decision support in tunnel construction," Reliability Engineering and System Safety, Elsevier, vol. 134(C), pages 157-168.
- J. H. M. Tah & V. Carr, 2000. "A proposal for construction project risk assessment using fuzzy logic," Construction Management and Economics, Taylor & Francis Journals, vol. 18(4), pages 491-500.
- Podofillini, L. & Dang, V.N., 2013. "A Bayesian approach to treat expert-elicited probabilities in human reliability analysis model construction," Reliability Engineering and System Safety, Elsevier, vol. 117(C), pages 52-64.
- Peter A. Morris, 1977. "Combining Expert Judgments: A Bayesian Approach," Management Science, INFORMS, vol. 23(7), pages 679-693, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hadef Hefaidh & Djebabra Mébarek, 2020. "A conceptual framework for risk matrix capitalization," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(3), pages 755-764, June.
- Chao Zhang & Wan Wang & Fengjiao Xu & Yong Chen & Tingxin Qin, 2022. "A Risk Treatment Strategy Model for Oil Pipeline Accidents Based on a Bayesian Decision Network Model," IJERPH, MDPI, vol. 19(20), pages 1-16, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ekanem, Nsimah & Mosleh, Ali & Shen, Song-Hua & Ramos, Marilia, 2024. "Phoenix–A model-based human reliability analysis methodology: Data sources and quantitative analysis procedure," Reliability Engineering and System Safety, Elsevier, vol. 248(C).
- Hall, Stephen G. & Mitchell, James, 2007. "Combining density forecasts," International Journal of Forecasting, Elsevier, vol. 23(1), pages 1-13.
- Stephen C. Hora, 2013. "A Note on the Aggregation of Event Probabilities," Risk Analysis, John Wiley & Sons, vol. 33(5), pages 909-914, May.
- Ali Mosleh & George Apostolakis, 1986. "The Assessment of Probability Distributions from Expert Opinions with an Application to Seismic Fragility Curves," Risk Analysis, John Wiley & Sons, vol. 6(4), pages 447-461, December.
- Thibault Gajdos & Jean-Christophe Vergnaud, 2013.
"Decisions with conflicting and imprecise information,"
Social Choice and Welfare, Springer;The Society for Social Choice and Welfare, vol. 41(2), pages 427-452, July.
- Gajdos, Thibault & Vergnaud, Jean-Christophe, 2009. "Decisions with conflicting and imprecise information," LSE Research Online Documents on Economics 27005, London School of Economics and Political Science, LSE Library.
- Thibault Gajdos & Jean-Christophe Vergnaud, 2013. "Decisions with conflicting and imprecise information," Post-Print hal-00443075, HAL.
- Thibault Gajdos & Jean-Christophe Vergnaud, 2013. "Decisions with conflicting and imprecise information," Université Paris1 Panthéon-Sorbonne (Post-Print and Working Papers) hal-00443075, HAL.
- Musharraf, Mashrura & Bradbury-Squires, David & Khan, Faisal & Veitch, Brian & MacKinnon, Scott & Imtiaz, Syed, 2014. "A virtual experimental technique for data collection for a Bayesian network approach to human reliability analysis," Reliability Engineering and System Safety, Elsevier, vol. 132(C), pages 1-8.
- Aleksandar Senić & Momčilo Dobrodolac & Zoran Stojadinović, 2024. "Predicting Extension of Time and Increasing Contract Price in Road Infrastructure Projects Using a Sugeno Fuzzy Logic Model," Mathematics, MDPI, vol. 12(18), pages 1-22, September.
- Yu, Shui & Wang, Zhonglai & Zhang, Kewang, 2018. "Sequential time-dependent reliability analysis for the lower extremity exoskeleton under uncertainty," Reliability Engineering and System Safety, Elsevier, vol. 170(C), pages 45-52.
- Hani Alyami & Paul Tae-Woo Lee & Zaili Yang & Ramin Riahi & Stephen Bonsall & Jin Wang, 2014. "An advanced risk analysis approach for container port safety evaluation," Maritime Policy & Management, Taylor & Francis Journals, vol. 41(7), pages 634-650, December.
- Christian Kascha & Francesco Ravazzolo, 2010.
"Combining inflation density forecasts,"
Journal of Forecasting, John Wiley & Sons, Ltd., vol. 29(1-2), pages 231-250.
- Christian Kascha & Francesco Ravazzolo, 2008. "Combining inflation density forecasts," Working Paper 2008/22, Norges Bank.
- Wilson, Kevin J., 2017. "An investigation of dependence in expert judgement studies with multiple experts," International Journal of Forecasting, Elsevier, vol. 33(1), pages 325-336.
- Pennings, Clint L.P. & van Dalen, Jan & Rook, Laurens, 2019. "Coordinating judgmental forecasting: Coping with intentional biases," Omega, Elsevier, vol. 87(C), pages 46-56.
- Jason R. W. Merrick, 2008. "Getting the Right Mix of Experts," Decision Analysis, INFORMS, vol. 5(1), pages 43-52, March.
- Wang, Xiaoqian & Hyndman, Rob J. & Li, Feng & Kang, Yanfei, 2023. "Forecast combinations: An over 50-year review," International Journal of Forecasting, Elsevier, vol. 39(4), pages 1518-1547.
- Shengyu Guo & Jiali He & Jichao Li & Bing Tang, 2019. "Exploring the Impact of Unsafe Behaviors on Building Construction Accidents Using a Bayesian Network," IJERPH, MDPI, vol. 17(1), pages 1-15, December.
- Gholamreza Dehdasht & Rosli Mohamad Zin & M. Salim Ferwati & Mu’azu Mohammed Abdullahi & Ali Keyvanfar & Ronald McCaffer, 2017. "DEMATEL-ANP Risk Assessment in Oil and Gas Construction Projects," Sustainability, MDPI, vol. 9(8), pages 1-24, August.
- Patricia Romero-Lankao & Daniel M. Gnatz & Olga Wilhelmi & Mary Hayden, 2016. "Urban Sustainability and Resilience: From Theory to Practice," Sustainability, MDPI, vol. 8(12), pages 1-19, November.
- Enrique Moral-Benito, 2015. "Model Averaging In Economics: An Overview," Journal of Economic Surveys, Wiley Blackwell, vol. 29(1), pages 46-75, February.
- Anne Sofie Jore & James Mitchell & Shaun P. Vahey, 2010.
"Combining forecast densities from VARs with uncertain instabilities,"
Journal of Applied Econometrics, John Wiley & Sons, Ltd., vol. 25(4), pages 621-634.
- Anne Sofie Jore & James Mitchell & Shaun Vahey, 2008. "Combining Forecast Densities from VARs with Uncertain Instabilities," Reserve Bank of New Zealand Discussion Paper Series DP2008/18, Reserve Bank of New Zealand.
- Anne-Sofie Jore & James Mitchell & Shaun P. Vahey, 2008. "Combining forecast densities from VARs with uncertain instabilities," Working Paper 2008/01, Norges Bank.
- Abraham Park & Chen Yu Chang, 2013. "Impacts of Construction Events on the Project Equity Value of the Channel Tunnel Project," ERES eres2013_97, European Real Estate Society (ERES).
More about this item
Keywords
Evaluation of construction safety risk; Deep excavation; Bayesian analysis; Expert elicitation;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:9:y:2018:i:2:d:10.1007_s13198-017-0689-2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.