Protocol to Manage Heritage-Building Interventions Using Heritage Building Information Modelling (HBIM)
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- WoonSeong Jeong & Soowon Chang & JeongWook Son & June-Seong Yi, 2016. "BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management," Sustainability, MDPI, vol. 8(11), pages 1-25, October.
- Joosung Lee & Jaejun Kim, 2017. "BIM-Based 4D Simulation to Improve Module Manufacturing Productivity for Sustainable Building Projects," Sustainability, MDPI, vol. 9(3), pages 1-23, March.
- M. M. M. Teo & M. Loosemore, 2001. "A theory of waste behaviour in the construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 19(7), pages 741-751.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ziyi Zhang & Yiquan Zou, 2022. "Research hotspots and trends in heritage building information modeling: A review based on CiteSpace analysis," Palgrave Communications, Palgrave Macmillan, vol. 9(1), pages 1-22, December.
- Flavio Rosa, 2020. "Building-Integrated Photovoltaics (BIPV) in Historical Buildings: Opportunities and Constraints," Energies, MDPI, vol. 13(14), pages 1-28, July.
- Luisa Dias Pereira & Vanessa Tavares & Nelson Soares, 2021. "Up-To-Date Challenges for the Conservation, Rehabilitation and Energy Retrofitting of Higher Education Cultural Heritage Buildings," Sustainability, MDPI, vol. 13(4), pages 1-11, February.
- Lauren Etxepare & Iñigo Leon & Maialen Sagarna & Iñigo Lizundia & Eneko Jokin Uranga, 2020. "Advanced Intervention Protocol in the Energy Rehabilitation of Heritage Buildings: A Miñones Barracks Case Study," Sustainability, MDPI, vol. 12(15), pages 1-33, August.
- Natalia Lasarte & Peru Elguezabal & Maialen Sagarna & Iñigo Leon & Juan Pedro Otaduy, 2021. "Challenges for Digitalisation in Building Renovation to Enhance the Efficiency of the Process: A Spanish Case Study," Sustainability, MDPI, vol. 13(21), pages 1-25, November.
- Jaione Korro Bañuelos & Álvaro Rodríguez Miranda & José Manuel Valle-Melón & Ainara Zornoza-Indart & Manuel Castellano-Román & Roque Angulo-Fornos & Francisco Pinto-Puerto & Pilar Acosta Ibáñez & Patr, 2021. "The Role of Information Management for the Sustainable Conservation of Cultural Heritage," Sustainability, MDPI, vol. 13(8), pages 1-21, April.
- Fabrizio Banfi & Stefano Roascio & Francesca Romana Paolillo & Mattia Previtali & Fabio Roncoroni & Chiara Stanga, 2022. "Diachronic and Synchronic Analysis for Knowledge Creation: Architectural Representation Geared to XR Building Archaeology (Claudius-Anio Novus Aqueduct in Tor Fiscale, the Appia Antica Archaeological ," Energies, MDPI, vol. 15(13), pages 1-37, June.
- Lorenzo Diana & Saverio D’Auria & Giovanna Acampa & Giorgia Marino, 2022. "Assessment of Disused Public Buildings: Strategies and Tools for Reuse of Healthcare Structures," Sustainability, MDPI, vol. 14(4), pages 1-25, February.
- Juan E. Nieto-Julián & Lenin Lara & Juan Moyano, 2021. "Implementation of a TeamWork-HBIM for the Management and Sustainability of Architectural Heritage," Sustainability, MDPI, vol. 13(4), pages 1-26, February.
- Namhyuk Ham & Baek-Il Bae & Ok-Kyung Yuh, 2020. "Phased Reverse Engineering Framework for Sustainable Cultural Heritage Archives Using Laser Scanning and BIM: The Case of the Hwanggungwoo (Seoul, Korea)," Sustainability, MDPI, vol. 12(19), pages 1-23, October.
- Concepción López-González & Jorge García-Valldecabres, 2023. "The Integration of HBIM-SIG in the Development of a Virtual Itinerary in a Historical Centre," Sustainability, MDPI, vol. 15(18), pages 1-19, September.
- Zoë Turner & James Kennell, 2018. "The Role of Sustainable Events in the Management of Historic Buildings," Sustainability, MDPI, vol. 10(11), pages 1-12, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Serenari, Christopher & Bosak, Keith & Attarian, Aram, 2013. "Cross-cultural efficacy of American low-impact programs: A comparison between Garhwal guide beliefs on environmental behavior and American outdoor travel norms," Tourism Management, Elsevier, vol. 34(C), pages 50-60.
- Zezhou Wu & Changhong Chen & Yuzhu Cai & Chen Lu & Hao Wang & Tao Yu, 2019. "BIM-Based Visualization Research in the Construction Industry: A Network Analysis," IJERPH, MDPI, vol. 16(18), pages 1-13, September.
- Rodrigo F. Herrera & M. Amalia Sanz & Laura Montalbán-Domingo & Tatiana García-Segura & Eugenio Pellicer, 2019. "Impact of Game-Based Learning on Understanding Lean Construction Principles," Sustainability, MDPI, vol. 11(19), pages 1-16, September.
- Udawatta, Nilupa & Zuo, Jian & Chiveralls, Keri & Zillante, George, 2015. "Improving waste management in construction projects: An Australian study," Resources, Conservation & Recycling, Elsevier, vol. 101(C), pages 73-83.
- Farrelly, Trisia & Tucker, Corrina, 2014. "Action research and residential waste minimisation in Palmerston North, New Zealand," Resources, Conservation & Recycling, Elsevier, vol. 91(C), pages 11-26.
- Esa, Mohd Reza & Halog, Anthony & Rigamonti, Lucia, 2017. "Strategies for minimizing construction and demolition wastes in Malaysia," Resources, Conservation & Recycling, Elsevier, vol. 120(C), pages 219-229.
- Murat Gunduz & Ayman Fahmi Naser, 2017. "Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects," Sustainability, MDPI, vol. 9(12), pages 1-20, November.
- Heni Fitriani & Saheed Ajayi & Sunkuk Kim, 2022. "Analysis of the Underlying Causes of Waste Generation in Indonesia’s Construction Industry," Sustainability, MDPI, vol. 15(1), pages 1-18, December.
- Fokwa Soh Mathieu & Barbeau Daniel & Doré Sylvie & Forgues Daniel, 2020. "Qualitative analysis of Request For Information to identify design flaws in steel construction projects," Organization, Technology and Management in Construction, Sciendo, vol. 12(1), pages 2083-2094, January.
- Samad M. E. Sepasgozar & Felix Kin Peng Hui & Sara Shirowzhan & Mona Foroozanfar & Liming Yang & Lu Aye, 2020. "Lean Practices Using Building Information Modeling (BIM) and Digital Twinning for Sustainable Construction," Sustainability, MDPI, vol. 13(1), pages 1-22, December.
- Vivian Tam & C. M. Tam & L. Y. Shen & S. X. Zeng & C. M. Ho, 2006. "Environmental performance assessment: perceptions of project managers on the relationship between operational and environmental performance indicators," Construction Management and Economics, Taylor & Francis Journals, vol. 24(3), pages 287-299.
- Gi-Wook Cha & Young-Chan Kim & Hyeun Jun Moon & Won-Hwa Hong, 2017. "The Effects of Data Collection Method and Monitoring of Workers’ Behavior on the Generation of Demolition Waste," IJERPH, MDPI, vol. 14(10), pages 1-14, October.
- Michael Pitt & Andrew Smith, 2003. "An assessment of waste management efficiency at BAA airports," Construction Management and Economics, Taylor & Francis Journals, vol. 21(4), pages 421-431.
- Wang, Jiayuan & Li, Zhengdao & Tam, Vivian W.Y., 2014. "Critical factors in effective construction waste minimization at the design stage: A Shenzhen case study, China," Resources, Conservation & Recycling, Elsevier, vol. 82(C), pages 1-7.
- Adrieli Cristina Vieira De Carvalho & Ariovaldo Denis Granja & Vanessa Gomes Da Silva, 2017. "A Systematic Literature Review on Integrative Lean and Sustainability Synergies over a Building’s Lifecycle," Sustainability, MDPI, vol. 9(7), pages 1-18, July.
- Wen-Der Yu & Shao-Shung Lo, 2005. "Time-dependent construction social costs model," Construction Management and Economics, Taylor & Francis Journals, vol. 23(3), pages 327-337.
- Borna Dasović & Mario Galić & Uroš Klanšek, 2020. "A Survey on Integration of Optimization and Project Management Tools for Sustainable Construction Scheduling," Sustainability, MDPI, vol. 12(8), pages 1-18, April.
- Lu, Weisheng & Webster, Chris & Chen, Ke & Zhang, Xiaoling & Chen, Xi, 2017. "Computational Building Information Modelling for construction waste management: Moving from rhetoric to reality," Renewable and Sustainable Energy Reviews, Elsevier, vol. 68(P1), pages 587-595.
- Li, Jingru & Tam, Vivian W.Y. & Zuo, Jian & Zhu, Jiaolan, 2015. "Designers’ attitude and behaviour towards construction waste minimization by design: A study in Shenzhen, China," Resources, Conservation & Recycling, Elsevier, vol. 105(PA), pages 29-35.
- Yanqiu Cui & Simeng Li & Chunlu Liu & Ninghan Sun, 2020. "Creation and Diversified Applications of Plane Module Libraries for Prefabricated Houses Based on BIM," Sustainability, MDPI, vol. 12(2), pages 1-17, January.
More about this item
Keywords
BIM; HBIM; heritage architecture; protocol; management; cultural heritage;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jsusta:v:10:y:2018:i:4:p:908-:d:137373. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.