Capacity Mechanisms in Europe and the US: A Comparative Analysis and a Real-Life Application for Greece
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Simoglou, Christos K. & Bakirtzis, Emmanouil A. & Biskas, Pandelis N. & Bakirtzis, Anastasios G., 2018. "Probabilistic evaluation of the long-term power system resource adequacy: The Greek case," Energy Policy, Elsevier, vol. 117(C), pages 295-306.
- Bhagwat, Pradyumna C. & Iychettira, Kaveri K. & Richstein, Jörn C. & Chappin, Emile J.L. & De Vries, Laurens J., 2017. "The effectiveness of capacity markets in the presence of a high portfolio share of renewable energy sources," Utilities Policy, Elsevier, vol. 48(C), pages 76-91.
- Kathleen Spees & Samuel A. Newell & Johannes P. Pfeifenberger, 2013. "Capacity Markets - Lessons Learned from the First Decade," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
- Holmberg, Pär & Tangerås, Thomas, 2021.
"Strategic Reserves versus Market-wide Capacity Mechanisms,"
Working Paper Series
1387, Research Institute of Industrial Economics.
- Pär Holmberg & Thomas Tangerås, 2021. "Strategic Reserves versus Market-wide Capacity Mechanisms," Working Papers EPRG2109, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Holmberg, P. & Tangerås, T., 2021. "Strategic Reserves versus Market-wide Capacity Mechanisms," Cambridge Working Papers in Economics 2132, Faculty of Economics, University of Cambridge.
- Komorowska, Aleksandra & Benalcazar, Pablo & Kaszyński, Przemysław & Kamiński, Jacek, 2020. "Economic consequences of a capacity market implementation: The case of Poland," Energy Policy, Elsevier, vol. 144(C).
- Fraunholz, Christoph & Keles, Dogan & Fichtner, Wolf, 2021. "On the role of electricity storage in capacity remuneration mechanisms," Energy Policy, Elsevier, vol. 149(C).
- Lynch, Muireann Á. & Nolan, Sheila & Devine, Mel T. & O’Malley, Mark, 2019.
"The impacts of demand response participation in capacity markets,"
Applied Energy, Elsevier, vol. 250(C), pages 444-451.
- Lynch, Muireann A. & Nolan, Sheila & Devine, Mel T. & O'Malley, Mark, 2018. "The impacts of demand response participation in capacity markets," Papers WP603, Economic and Social Research Institute (ESRI).
- Lynch, Muireann Á. & Nolan, Sheila & Devine, Mel & O’Malley, Mark, 2019. "The impacts of demand response participation in capacity markets," Papers RB201910, Economic and Social Research Institute (ESRI).
- Brito-Pereira, Paulo & Mastropietro, Paolo & Rodilla, Pablo & Barroso, Luiz Augusto & Batlle, Carlos, 2022. "Adjusting the aim of capacity mechanisms: Future-proof reliability metrics and firm supply calculations," Energy Policy, Elsevier, vol. 164(C).
- Kozlova, M. & Overland, I., 2022. "Combining capacity mechanisms and renewable energy support: A review of the international experience," Renewable and Sustainable Energy Reviews, Elsevier, vol. 155(C).
- Joskow, Paul L., 2008. "Capacity payments in imperfect electricity markets: Need and design," Utilities Policy, Elsevier, vol. 16(3), pages 159-170, September.
- Bhagwat, Pradyumna C. & Iychettira, Kaveri K. & Richstein, Jörn C. & Chappin, Emile J.L. & Vries, Laurens J. De, 2017. "The effectiveness of capacity markets in the presence of a high portfolio share of renewable energy sources," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 48, pages 76-91.
- Bhagwat, Pradyumna C. & de Vries, Laurens J. & Hobbs, Benjamin F., 2016. "Expert survey on capacity markets in the US: Lessons for the EU," Utilities Policy, Elsevier, vol. 38(C), pages 11-17.
- Batlle, Carlos & Pérez-Arriaga, Ignacio J., 2008. "Design criteria for implementing a capacity mechanism in deregulated electricity markets," Utilities Policy, Elsevier, vol. 16(3), pages 184-193, September.
- Frank A. Wolak, 2021. "Long-Term Resource Adequacy in Wholesale Electricity Markets with Significant Intermittent Renewables," NBER Working Papers 29033, National Bureau of Economic Research, Inc.
- Mastropietro, Paolo & Fontini, Fulvio & Rodilla, Pablo & Batlle, Carlos, 2018. "The Italian capacity remuneration mechanism: Critical review and open questions," Energy Policy, Elsevier, vol. 123(C), pages 659-669.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Kozlova, Mariia & Huhta, Kaisa & Lohrmann, Alena, 2023. "The interface between support schemes for renewable energy and security of supply: Reviewing capacity mechanisms and support schemes for renewable energy in Europe," Energy Policy, Elsevier, vol. 181(C).
- Laureana Luciani & Juliana Cruz & Victor Ballestin & Boniface Dominick Mselle, 2024. "Exploring Flexibility Potential of Energy-Intensive Industries in Energy Markets," Energies, MDPI, vol. 17(12), pages 1-18, June.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.
- Brito-Pereira, Paulo & Rodilla, Pablo & Mastropietro, Paolo & Batlle, Carlos, 2022. "Self-fulfilling or self-destroying prophecy? The relevance of de-rating factors in modern capacity mechanisms," Applied Energy, Elsevier, vol. 314(C).
- Simshauser, Paul, 2020.
"Merchant renewables and the valuation of peaking plant in energy-only markets,"
Energy Economics, Elsevier, vol. 91(C).
- Paul Simshauser, 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Working Papers EPRG2002, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Cambridge Working Papers in Economics 2002, Faculty of Economics, University of Cambridge.
- Simshauser, Paul, 2022.
"Rooftop solar PV and the peak load problem in the NEM's Queensland region,"
Energy Economics, Elsevier, vol. 109(C).
- Paul Simshauser, 2021. "Rooftop solar PV and the peak load problem in the NEM’s Queensland region," Working Papers EPRG2125, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Bhagwat, Pradyumna C. & Marcheselli, Anna & Richstein, Jörn C. & Chappin, Emile J.L. & De Vries, Laurens J., 2017. "An analysis of a forward capacity market with long-term contracts," Energy Policy, Elsevier, vol. 111(C), pages 255-267.
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- Simshauser, Paul, 2022.
"Rooftop solar PV and the peak load problem in the NEM's Queensland region,"
Energy Economics, Elsevier, vol. 109(C).
- Paul Simshauser, 2021. "Rooftop solar PV and the peak load problem in the NEM’s Queensland region," Working Papers EPRG2125, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2021. "Rooftop Solar PV and the Peak Load Problem in the NEM's Queensland Region," Cambridge Working Papers in Economics 2180, Faculty of Economics, University of Cambridge.
- Mou, Yuting & Papavasiliou, Anthony & Hartz, Katharina & Dusolt, Alexander & Redl, Christian, 2023. "An analysis of shortage pricing and capacity remuneration mechanisms on the pan-European common energy market," Energy Policy, Elsevier, vol. 183(C).
- Mastropietro, Paolo & Rodilla, Pablo & Rivier, Michel & Batlle, Carlos, 2024. "Reliability options: Regulatory recommendations for the next generation of capacity remuneration mechanisms," Energy Policy, Elsevier, vol. 185(C).
- Giorgos Stamtsis & Haris Doukas, 2018. "Cooperation or Localization in European Capacity Markets? A Coalitional Game over Graph Approach," Energies, MDPI, vol. 11(6), pages 1-17, June.
- Cinzia Bonaldo & Fulvio Fontini & Michele Moretto, 2022.
"The Energy Transition and the Value of Capacity Remuneration Mechanisms,"
Working Papers
2022.16, Fondazione Eni Enrico Mattei.
- Bonaldo, Cinzia & Fontini, Fulvio & Moretto, Michele, 2022. "The Energy Transition and the Value of Capacity Remuneration Mechanisms," FEEM Working Papers 321985, Fondazione Eni Enrico Mattei (FEEM).
- Kozlova, M. & Overland, I., 2022. "Combining capacity mechanisms and renewable energy support: A review of the international experience," Renewable and Sustainable Energy Reviews, Elsevier, vol. 155(C).
- Feng, Yuanhao & Feng, Donghan & Zhou, Yun & Xu, Shaolun, 2024. "Generation side strategy and user side cost based on equilibrium analysis of the power market under the reliability option," Energy, Elsevier, vol. 287(C).
- Durmaz, Tunç & Acar, Sevil & Kızılkaya, Simay, 2024. "Generation failures, strategic withholding, and capacity payments in the Turkish electricity market," Energy Policy, Elsevier, vol. 184(C).
- Perica Ilak & Lin Herenčić & Ivan Rajšl & Sara Raos & Željko Tomšić, 2021. "Equilibrium Pricing with Duality-Based Method: Approach for Market-Oriented Capacity Remuneration Mechanism," Energies, MDPI, vol. 14(3), pages 1-19, January.
- Komorowska, Aleksandra & Benalcazar, Pablo & Kaszyński, Przemysław & Kamiński, Jacek, 2020. "Economic consequences of a capacity market implementation: The case of Poland," Energy Policy, Elsevier, vol. 144(C).
- Keppler, Jan Horst & Quemin, Simon & Saguan, Marcelo, 2022.
"Why the sustainable provision of low-carbon electricity needs hybrid markets,"
Energy Policy, Elsevier, vol. 171(C).
- Jan-Horst Keppler & Simon Quemin & Marcelo Saguan, 2022. "Why the sustainable provision of low-carbon electricity needs hybrid markets," Post-Print hal-03964488, HAL.
- Simshauser, P., 2020.
"Merchant utilities and boundaries of the firm: vertical integration in energy-only markets,"
Cambridge Working Papers in Economics
2039, Faculty of Economics, University of Cambridge.
- Paul Simshauser, 2020. "Merchant utilities and boundaries of the firm: vertical integration in energy-only markets," Working Papers EPRG2008, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P. & Gilmore, J., 2020.
"Is the NEM broken? Policy discontinuity and the 2017-2020 investment megacycle,"
Cambridge Working Papers in Economics
2048, Faculty of Economics, University of Cambridge.
- Paul Simshauser & Joel Gilmore, 2020. "Is the NEM broken? Policy discontinuity and the 2017-2020 investment megacycle," Working Papers EPRG2014, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Komorowska, Aleksandra & Kaszyński, Przemysław & Kamiński, Jacek, 2023. "Where does the capacity market money go? Lessons learned from Poland," Energy Policy, Elsevier, vol. 173(C).
More about this item
Keywords
capacity auction; capacity mechanisms; demand curve; electricity cost; electricity supply; resource adequacy;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:16:y:2023:i:2:p:982-:d:1036785. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.