Design criteria for implementing a capacity mechanism in deregulated electricity markets
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- De Vries, Laurens J., 2007. "Generation adequacy: Helping the market do its job," Utilities Policy, Elsevier, vol. 15(1), pages 20-35, March.
- Cramton, Peter & Stoft, Steven, 2005.
"A Capacity Market that Makes Sense,"
The Electricity Journal, Elsevier, vol. 18(7), pages 43-54.
- Peter Cramton & Steven Stoft, 2005. "A Capacity Market that Makes Sense," Papers of Peter Cramton 05licap, University of Maryland, Department of Economics - Peter Cramton, revised 2005.
- Batlle, Carlos & Vazquez, Carlos & Rivier, Michel & Perez-Arriaga, Ignacio J., 2007. "Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options," Energy Policy, Elsevier, vol. 35(9), pages 4545-4554, September.
- Bidwell, Miles, 2005. "Reliability Options: A Market-Oriented Approach to Long-Term Adequacy," The Electricity Journal, Elsevier, vol. 18(5), pages 11-25, June.
- Peter Cramton & Steven Stoft, 2007. "Colombia Firm Energy Market," Papers of Peter Cramton 07cfem, University of Maryland, Department of Economics - Peter Cramton, revised 2007.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2018. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Working Paper Series in Production and Energy 27, Karlsruhe Institute of Technology (KIT), Institute for Industrial Production (IIP).
- Bublitz, Andreas & Keles, Dogan & Zimmermann, Florian & Fraunholz, Christoph & Fichtner, Wolf, 2019. "A survey on electricity market design: Insights from theory and real-world implementations of capacity remuneration mechanisms," Energy Economics, Elsevier, vol. 80(C), pages 1059-1078.
- Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
- Mastropietro, Paolo & Rodilla, Pablo & Rivier, Michel & Batlle, Carlos, 2024. "Reliability options: Regulatory recommendations for the next generation of capacity remuneration mechanisms," Energy Policy, Elsevier, vol. 185(C).
- Newbery, David, 2016.
"Missing money and missing markets: Reliability, capacity auctions and interconnectors,"
Energy Policy, Elsevier, vol. 94(C), pages 401-410.
- David Newbery, 2015. "Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors," Cambridge Working Papers in Economics 1513, Faculty of Economics, University of Cambridge.
- David Newbery, 2015. "Missing Money and Missing Markets: Reliability, Capacity Auctions and Interconnectors," Working Papers EPRG 1508, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Peter Cramton & Axel Ockenfels & Steven Stoft, 2013. "Capacity Market Fundamentals," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
- Batlle, C. & Rodilla, P., 2010. "A critical assessment of the different approaches aimed to secure electricity generation supply," Energy Policy, Elsevier, vol. 38(11), pages 7169-7179, November.
- Finon, Dominique & Meunier, Guy & Pignon, Virginie, 2008.
"The social efficiency of long-term capacity reserve mechanisms,"
Utilities Policy, Elsevier, vol. 16(3), pages 202-214, September.
- Dominique Finon & Guy Meunier & Virginie Pignon, 2008. "The social Efficiency of long-term capacity reserve mechanisms," Post-Print hal-00361717, HAL.
- Elberg, Christina, 2014. "Cross-Border Effects of Capacity Mechanisms in Electricity Markets," EWI Working Papers 2014-11, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Tao, Junyi & Li, Ran & Chen, Sijie & Qu, Hui & Xiang, Yue, 2024. "Reverse impact of capacity markets for a renewable-dominated power system," Applied Energy, Elsevier, vol. 375(C).
- Keles, Dogan & Bublitz, Andreas & Zimmermann, Florian & Genoese, Massimo & Fichtner, Wolf, 2016. "Analysis of design options for the electricity market: The German case," Applied Energy, Elsevier, vol. 183(C), pages 884-901.
- Roques, Fabien A., 2008.
"Market design for generation adequacy: Healing causes rather than symptoms,"
Utilities Policy, Elsevier, vol. 16(3), pages 171-183, September.
- Roques, F.A., 2008. "Market Design for Generation Adequacy: Healing Causes rather than Symptoms," Cambridge Working Papers in Economics 0821, Faculty of Economics, University of Cambridge.
- Bhagwat, Pradyumna C. & Richstein, Jörn C. & Chappin, Emile J.L. & Iychettira, Kaveri K. & Vries, Laurens J. De, 2017. "Cross-border effects of capacity mechanisms in interconnected power systems," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 46, pages 33-47.
- Fontini, Fulvio & Vargiolu, Tiziano & Zormpas, Dimitrios, 2021. "Investing in electricity production under a reliability options scheme," Journal of Economic Dynamics and Control, Elsevier, vol. 126(C).
- Andreis, Luisa & Flora, Maria & Fontini, Fulvio & Vargiolu, Tiziano, 2020.
"Pricing reliability options under different electricity price regimes,"
Energy Economics, Elsevier, vol. 87(C).
- Luisa Andreis & Maria Flora & Fulvio Fontini & Tiziano Vargiolu, 2019. "Pricing Reliability Options under different electricity prices' regimes," Papers 1909.05761, arXiv.org.
- Hasani, Masoud & Hosseini, Seyed Hamid, 2011. "Dynamic assessment of capacity investment in electricity market considering complementary capacity mechanisms," Energy, Elsevier, vol. 36(1), pages 277-293.
- Vahl, Fabrício Peter & Rüther, Ricardo & Casarotto Filho, Nelson, 2013. "The influence of distributed generation penetration levels on energy markets," Energy Policy, Elsevier, vol. 62(C), pages 226-235.
- Brito-Pereira, Paulo & Rodilla, Pablo & Mastropietro, Paolo & Batlle, Carlos, 2022. "Self-fulfilling or self-destroying prophecy? The relevance of de-rating factors in modern capacity mechanisms," Applied Energy, Elsevier, vol. 314(C).
- Khan, Agha Salman M. & Verzijlbergh, Remco A. & Sakinci, Ozgur Can & De Vries, Laurens J., 2018. "How do demand response and electrical energy storage affect (the need for) a capacity market?," Applied Energy, Elsevier, vol. 214(C), pages 39-62.
- Lynch, Muireann Á. & Devine, Mel, 2015. "Investment vs. Refurbishment: Examining Capacity Payment Mechanisms Using Mixed Complementarity Problems With Endogenous Probability," Papers WP507, Economic and Social Research Institute (ESRI).
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:juipol:v:16:y:2008:i:3:p:184-193. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.sciencedirect.com/journal/utilities-policy .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.