IDEAS home Printed from https://ideas.repec.org/a/eee/transa/v139y2020icp228-254.html
   My bibliography  Save this article

Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee

Author

Listed:
  • Shi, Shasha
  • An, Qingxian
  • Chen, Ke

Abstract

Government sectors often provide guarantees in build-operate-transfer (BOT) roads to attract private investments. Since a fiscal burden would be incurred from the contingent liability of issuing a guarantee, charging a fee for the guarantee is considered an effective remedy for management of contingent liabilities in practice. This study incorporates the charge mechanism for minimum traffic guarantee (MTG) into consideration, and proposes a method to choose the optimal concession contract variables with a paid MTG. We find that the government sector will specify a lower toll and a higher capacity for a BOT road with a paid MTG. As a result, the society suffers a social welfare loss when providing a paid MTG. Meanwhile, both the charging fee of an MTG and the guaranteed traffic volume would increase the loss of social welfare, which means the incentive mechanism of private participation and the management of contingent liabilities (charging fee for MTG) are all at the expense of social welfare. Moreover, since the welfare loss is magnified under a high marginal social cost condition, the government should set the charging fee and guaranteed traffic volume according to the marginal social cost level. In addition, to obtain more insights, this paper has made two extensions to further investigate the effects of a paid MTG (1) when contracting with a risk averse private investor; (2) when the concession period is an endogenous variable. Based on our model results, this paper derives several policy implications regarding BOT contract design when a paid MTG is provided.

Suggested Citation

  • Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
  • Handle: RePEc:eee:transa:v:139:y:2020:i:c:p:228-254
    DOI: 10.1016/j.tra.2020.06.023
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S096585642030642X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.tra.2020.06.023?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Eduardo Engel & Ronald Fischer & Alexander Galetovic, 2013. "The Basic Public Finance Of Public–Private Partnerships," Journal of the European Economic Association, European Economic Association, vol. 11(1), pages 83-111, February.
    2. Choi, Tsan-Ming & Li, Duan & Yan, Houmin, 2008. "Mean-variance analysis of a single supplier and retailer supply chain under a returns policy," European Journal of Operational Research, Elsevier, vol. 184(1), pages 356-376, January.
    3. Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
    4. Snow, Arthur & Warren, Ronald Jr., 1996. "The marginal welfare cost of public funds: Theory and estimates," Journal of Public Economics, Elsevier, vol. 61(2), pages 289-305, August.
    5. Julian M. Alston & Brian H. Hurd, 1990. "Some Neglected Social Costs of Government Spending in Farm Programs," American Journal of Agricultural Economics, Agricultural and Applied Economics Association, vol. 72(1), pages 149-156.
    6. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    7. Li, Shuai & Cai, Hubo, 2017. "Government incentive impacts on private investment behaviors under demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 115-129.
    8. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    9. Baron, David P & Myerson, Roger B, 1982. "Regulating a Monopolist with Unknown Costs," Econometrica, Econometric Society, vol. 50(4), pages 911-930, July.
    10. Chen, Anthony & Subprasom, Kitti, 2007. "Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(6), pages 537-558, July.
    11. Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
    12. Ubbels, Barry & Verhoef, Erik T., 2008. "Auctioning concessions for private roads," Transportation Research Part A: Policy and Practice, Elsevier, vol. 42(1), pages 155-172, January.
    13. Luiz Eduardo Brandao & Eduardo Saraiva, 2008. "The option value of government guarantees in infrastructure projects," Construction Management and Economics, Taylor & Francis Journals, vol. 26(11), pages 1171-1180.
    14. Li, Zhi-Chun & Guo, Qian-Wen & Lam, William H.K. & Wong, S.C., 2015. "Transit technology investment and selection under urban population volatility: A real option perspective," Transportation Research Part B: Methodological, Elsevier, vol. 78(C), pages 318-340.
    15. Wu, Di & Yin, Yafeng & Yang, Hai, 2011. "The independence of volume-capacity ratio of private toll roads in general networks," Transportation Research Part B: Methodological, Elsevier, vol. 45(1), pages 96-101, January.
    16. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    17. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    18. Wang, Shuaian & Meng, Qiang & Liu, Zhiyuan, 2013. "Fundamental properties of volume–capacity ratio of a private toll road in general networks," Transportation Research Part B: Methodological, Elsevier, vol. 47(C), pages 77-86.
    19. Gkochari, Christiana C., 2015. "Optimal investment timing in the dry bulk shipping sector," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 79(C), pages 102-109.
    20. Qinghua Li & Bo Li & Ping Chen & Pengwen Hou, 2017. "Dual-channel supply chain decisions under asymmetric information with a risk-averse retailer," Annals of Operations Research, Springer, vol. 257(1), pages 423-447, October.
    21. Christopher M. Lewis & Ashoka Mody, 1998. "Contingent Liabilities for Infrastructure Projects : Implementing a Risk Management Framework for Governments," World Bank Publications - Reports 11539, The World Bank Group.
    22. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    23. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying, 2015. "Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 78(C), pages 54-67.
    24. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    25. Charles Cheah & Jicai Liu, 2006. "Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation," Construction Management and Economics, Taylor & Francis Journals, vol. 24(5), pages 545-554.
    26. Power, Gabriel J. & Burris, Mark & Vadali, Sharada & Vedenov, Dmitry, 2016. "Valuation of strategic options in public–private partnerships," Transportation Research Part A: Policy and Practice, Elsevier, vol. 90(C), pages 50-68.
    27. Ballard, Charles L & Shoven, John B & Whalley, John, 1985. "General Equilibrium Computations of the Marginal Welfare Costs of Taxes in the United States," American Economic Review, American Economic Association, vol. 75(1), pages 128-138, March.
    28. José Luis Guasch & Daniel Benitez & Irene Portabales & Lincoln Flor, 2014. "The Renegotiation of PPP Contracts: An Overview of its Recent Evolution in Latin America," International Transport Forum Discussion Papers 2014/18, OECD Publishing.
    29. José M. Vassallo, 2006. "Traffic Risk Mitigation in Highway Concession Projects: The Experience of Chile," Journal of Transport Economics and Policy, University of Bath, vol. 40(3), pages 359-381, September.
    30. J. Luis Guasch, 2004. "Granting and Renegotiating Infrastructure Concessions : Doing it Right," World Bank Publications - Books, The World Bank Group, number 15024.
    31. Yin, Yafeng & Guo, Xiaolei, 2016. "Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 56-69.
    32. Hinojosa, Sergio & Gomez-Lobo, Andres, 2000. "Broad roads in a thin country - infrastructure concessions in Chile," Policy Research Working Paper Series 2279, The World Bank.
    33. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    34. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    2. Barbosa, Luciana & Rodrigues, Artur & Sardinha, Alberto, 2022. "Optimal price subsidies under uncertainty," European Journal of Operational Research, Elsevier, vol. 303(1), pages 471-479.
    3. Shi, Shasha & Tuo, Yuhui & Pan, Meixu & Yin, Yafeng & Chen, Yue & Zhou, Xiongwei & Chen, Ke, 2024. "Signaling contracts design for Build–Operate–Transfer roads under asymmetric traffic demand information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 183(C).
    4. Yuqun Dong & Yaming Zhuang, 2023. "Research on an Investment Decision Model of Waste Incineration Power under Demand Guarantee Policies," Sustainability, MDPI, vol. 15(15), pages 1-19, July.
    5. Bin Shang & Hui Lu & Yuhua Zhu & Hanchuan Pan & Juan Wang, 2024. "Green Tollways: Strategizing Carbon-Emissions-Based Government-Owned Public Toll Road Operations in China," Sustainability, MDPI, vol. 16(6), pages 1-25, March.
    6. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    7. Zhang, Linling & Yuan, Jinjian & Gao, Xinyu & Jiang, Dawei, 2021. "Public transportation development decision-making under public participation: A large-scale group decision-making method based on fuzzy preference relations," Technological Forecasting and Social Change, Elsevier, vol. 172(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    2. Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
    3. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    4. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    5. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    6. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    7. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    8. Shi, Shasha & Tuo, Yuhui & Pan, Meixu & Yin, Yafeng & Chen, Yue & Zhou, Xiongwei & Chen, Ke, 2024. "Signaling contracts design for Build–Operate–Transfer roads under asymmetric traffic demand information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 183(C).
    9. Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
    10. Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    11. Li, Shuai & Cai, Hubo, 2017. "Government incentive impacts on private investment behaviors under demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 101(C), pages 115-129.
    12. Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
    13. Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
    14. Chen, Zhiyuan & Sun, Shaobo & Li, Jianbin & Zhang, Langlang & Fan, Hao, 2022. "Optimal BOT contracts in a two-road transportation network," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    15. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    16. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
    17. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.
    18. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    19. Yin, Yafeng & Guo, Xiaolei, 2016. "Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 56-69.
    20. Sang, Jinyan & Li, Zhi-Chun & Lam, William H.K. & Wong, S.C., 2019. "Design of build-operate-transfer contract for integrated rail and property development with uncertainty in future urban population," Transportation Research Part B: Methodological, Elsevier, vol. 130(C), pages 36-66.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transa:v:139:y:2020:i:c:p:228-254. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/547/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.