IDEAS home Printed from https://ideas.repec.org/a/eee/transa/v107y2018icp106-125.html
   My bibliography  Save this article

The effects of concession period structures on BOT road contracts

Author

Listed:
  • Zhang, Yiwen
  • Feng, Zhuo
  • Zhang, Shuibo

Abstract

Under the build-operate-transfer (BOT) approach, the private firm builds and operates a road within the concession period and transfers the project at no cost to the government at the end of the concession period. Based on whether the construction period and the private operation period are defined together or separately, there are two concession period structures: single-period concession structure (SPCS) and two-period concession structure (TPCS). This paper simultaneously compares socially optimal toll prices in both private and public operation periods, road quality, and concession period under SPCS and TPCS, respectively. We find that if the marginal social welfare with respect to toll price in private operation period is sufficiently more responsive than to road quality, then the optimal road capacity and toll prices under SPCS are higher than those under TPCS. Otherwise if marginal social welfare in public operation period is sufficiently more responsive to road quality, then the optimal toll prices under SPCS are lower while the optimal road quality under SPCS is higher. We also find that the optimal concession periods are independent of concession period structures. This paper has made three extensions to further investigate the effects of concession period structures (1) when the toll price is determined by the private firm; (2) when renegotiation takes place; and (3) when government support policies are present. Based on our model results, this paper derives several policy implications regarding BOT road contract design under different concession period structures.

Suggested Citation

  • Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo, 2018. "The effects of concession period structures on BOT road contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 107(C), pages 106-125.
  • Handle: RePEc:eee:transa:v:107:y:2018:i:c:p:106-125
    DOI: 10.1016/j.tra.2017.11.018
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S096585641730157X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.tra.2017.11.018?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Song, Jinbo & Jin, Lulu & Zhao, Yunpeng & Hu, Wenjin, 2017. "Using bargaining-game model to negotiate compensation for the early termination of BOT highway projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 105(C), pages 197-209.
    2. Philippe Gagnepain & Marc Ivaldi & David Martimort, 2013. "The Cost of Contract Renegotiation: Evidence from the Local Public Sector," American Economic Review, American Economic Association, vol. 103(6), pages 2352-2383, October.
    3. Albalate, Daniel & Bel, Germà, 2009. "Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 43(2), pages 219-229, February.
    4. Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
    5. Auriol, Emmanuelle & Picard, Pierre M., 2013. "A theory of BOT concession contracts," Journal of Economic Behavior & Organization, Elsevier, vol. 89(C), pages 187-209.
    6. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    7. Tan, Zhijia & Yang, Hai, 2012. "The impact of user heterogeneity on road franchising," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(5), pages 958-975.
    8. Larsson, Torbjörn & Patriksson, Michael, 1999. "Side constrained traffic equilibrium models-- analysis, computation and applications," Transportation Research Part B: Methodological, Elsevier, vol. 33(4), pages 233-264, May.
    9. Baron, David P & Myerson, Roger B, 1982. "Regulating a Monopolist with Unknown Costs," Econometrica, Econometric Society, vol. 50(4), pages 911-930, July.
    10. Chen, Anthony & Subprasom, Kitti, 2007. "Analysis of regulation and policy of private toll roads in a build-operate-transfer scheme under demand uncertainty," Transportation Research Part A: Policy and Practice, Elsevier, vol. 41(6), pages 537-558, July.
    11. Ubbels, Barry & Verhoef, Erik T., 2008. "Auctioning concessions for private roads," Transportation Research Part A: Policy and Practice, Elsevier, vol. 42(1), pages 155-172, January.
    12. Bagwell, Kyle & Riordan, Michael H, 1991. "High and Declining Prices Signal Product Quality," American Economic Review, American Economic Association, vol. 81(1), pages 224-239, March.
    13. Yang, Hai & Bell, Michael G. H., 1997. "Traffic restraint, road pricing and network equilibrium," Transportation Research Part B: Methodological, Elsevier, vol. 31(4), pages 303-314, August.
    14. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    15. Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
    16. Eduardo M. R. A. Engel & Ronald D. Fischer & Alexander Galetovic, 2001. "Least-Present-Value-of-Revenue Auctions and Highway Franchising," Journal of Political Economy, University of Chicago Press, vol. 109(5), pages 993-1020, October.
    17. Yang, Hai & Tang, Wilson H. & Man Cheung, Wing & Meng, Qiang, 2002. "Profitability and welfare gain of private toll roads in a network with heterogeneous users," Transportation Research Part A: Policy and Practice, Elsevier, vol. 36(6), pages 537-554, July.
    18. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying, 2015. "Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 78(C), pages 54-67.
    19. Qiu, Larry D. & Wang, Susheng, 2011. "BOT projects: Incentives and efficiency," Journal of Development Economics, Elsevier, vol. 94(1), pages 127-138, January.
    20. Nombela, Gustavo & de Rus, Ginés, 2004. "Flexible-term contracts for road franchising," Transportation Research Part A: Policy and Practice, Elsevier, vol. 38(3), pages 163-179, March.
    21. J. Luis Guasch, 2004. "Granting and Renegotiating Infrastructure Concessions : Doing it Right," World Bank Publications - Books, The World Bank Group, number 15024.
    22. repec:hal:pseose:hal-00710639 is not listed on IDEAS
    23. Engel, Eduardo & Fischer, Ronald & Galetovic, Alexander, 1997. "Highway Franchising: Pitfalls and Opportunities," American Economic Review, American Economic Association, vol. 87(2), pages 68-72, May.
    24. Sudong Ye & Robert Tiong, 2003. "The effect of concession period design on completion risk management of BOT projects," Construction Management and Economics, Taylor & Francis Journals, vol. 21(5), pages 471-482.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
    2. Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
    3. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    4. Mahavadi Dhanshyam & Samir K. Srivastava, 2021. "Governance structures for public infrastructure projects: Public–private management regimes, contractual forms and innovation," Construction Management and Economics, Taylor & Francis Journals, vol. 39(8), pages 652-668, August.
    5. Kim, Kangsoo, 2020. "Robust Contract Conditions Under the Newly Introduced BTO-rs Scheme: Application to an Urban Railway Project," KDI Journal of Economic Policy, Korea Development Institute (KDI), vol. 42(4), pages 117-138.
    6. Kangsoo Kim & Jinseog Kim & Hyejin Cho & Donghyung Yook, 2024. "Determining contract conditions in a PPP project among deep uncertainty in future outturn travel demand," Transportation, Springer, vol. 51(3), pages 937-961, June.
    7. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    8. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    9. Shi, Shasha & Tuo, Yuhui & Pan, Meixu & Yin, Yafeng & Chen, Yue & Zhou, Xiongwei & Chen, Ke, 2024. "Signaling contracts design for Build–Operate–Transfer roads under asymmetric traffic demand information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 183(C).
    10. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    11. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    12. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying & Zhang, Shuai-Jun, 2016. "Subsidizing and pricing private toll roads with noncontractible service quality: A relational contract approach," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 466-491.
    2. Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
    3. Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
    4. Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
    5. Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
    6. Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
    7. Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
    8. Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
    9. Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
    10. Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
    11. Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
    12. Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
    13. Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
    14. Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
    15. Yin, Yafeng & Guo, Xiaolei, 2016. "Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 56-69.
    16. Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
    17. Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
    18. Feng, Zhuo & Zhang, Shui-Bo & Gao, Ying, 2015. "Modeling the impact of government guarantees on toll charge, road quality and capacity for Build-Operate-Transfer (BOT) road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 78(C), pages 54-67.
    19. Albalate, Daniel & Bel, Germà, 2009. "Regulating concessions of toll motorways: An empirical study on fixed vs. variable term contracts," Transportation Research Part A: Policy and Practice, Elsevier, vol. 43(2), pages 219-229, February.
    20. Kang, Chao-Chung & Lee, Tsun-Siou & Huang, Szu-Chi, 2013. "Royalty bargaining in Public–Private Partnership projects: Insights from a theoretic three-stage game auction model," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 59(C), pages 1-14.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transa:v:107:y:2018:i:c:p:106-125. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/547/description#description .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.