Optimal BOT contracts in a two-road transportation network
Author
Abstract
Suggested Citation
DOI: 10.1016/j.tre.2022.102733
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tan, Zhijia & Yang, Hai & Guo, Xiaolei, 2010. "Properties of Pareto-efficient contracts and regulations for road franchising," Transportation Research Part B: Methodological, Elsevier, vol. 44(4), pages 415-433, May.
- Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
- Ubbels, Barry & Verhoef, Erik T., 2008.
"Auctioning concessions for private roads,"
Transportation Research Part A: Policy and Practice, Elsevier, vol. 42(1), pages 155-172, January.
- Barry Ubbels & Erik Verhoef, 2004. "Auctioning Concessions for Private Roads," Tinbergen Institute Discussion Papers 04-008/3, Tinbergen Institute.
- De Borger, Bruno & Van Dender, Kurt, 2006. "Prices, capacities and service levels in a congestible Bertrand duopoly," Journal of Urban Economics, Elsevier, vol. 60(2), pages 264-283, September.
- Li, Shuai & Cai, Jiannan & Feng, Zhuo & Xu, Yifang & Cai, Hubo, 2019. "Government contracting with monopoly in infrastructure provision: Regulation or deregulation?," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 122(C), pages 506-523.
- Yang, Hai & Meng, Qiang, 2000. "Highway pricing and capacity choice in a road network under a build-operate-transfer scheme," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 207-222, April.
- Verhoef, Erik T., 2007.
"Second-best road pricing through highway franchising,"
Journal of Urban Economics, Elsevier, vol. 62(2), pages 337-361, September.
- Erik T. Verhoef, 2005. "Second-best Road Pricing Through Highway Franchising," Tinbergen Institute Discussion Papers 05-082/3, Tinbergen Institute.
- Tan, Zhijia & Yang, Hai & Tan, Wei & Li, Zhichun, 2016. "Pareto-improving transportation network design and ownership regimes," Transportation Research Part B: Methodological, Elsevier, vol. 91(C), pages 292-309.
- Tan, Zhijia, 2012. "Capacity and toll choice of an add-on toll road under various ownership regimes," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1080-1092.
- Yin, Yafeng & Guo, Xiaolei, 2016. "Optimal choice of capacity, toll and government guarantee for build-operate-transfer roads under asymmetric cost informationAuthor-Name: Shi, Shasha," Transportation Research Part B: Methodological, Elsevier, vol. 85(C), pages 56-69.
- Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
- Schmidt, Klaus M, 1996.
"The Costs and Benefits of Privatization: An Incomplete Contracts Approach,"
The Journal of Law, Economics, and Organization, Oxford University Press, vol. 12(1), pages 1-24, April.
- Schmidt, Klaus M., 1996. "The costs and benefits of privatization: An incomplete contracts approach," Munich Reprints in Economics 19773, University of Munich, Department of Economics.
- Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
- Jyh-Fa Tsai & Chih-Peng Chu, 2003. "The analysis of regulation on private highway investment under a build-operate-transfer scheme," Transportation, Springer, vol. 30(2), pages 221-243, May.
- Engel Eduardo M & Fischer Ronald & Galetovic Alexander, 2004.
"Toll Competition Among Congested Roads,"
The B.E. Journal of Economic Analysis & Policy, De Gruyter, vol. 4(1), pages 1-21, March.
- Eduardo Engel & Ronald Fischer & Alexander Galetovic, 1999. "Toll Competition Among Congested Roads," NBER Technical Working Papers 0239, National Bureau of Economic Research, Inc.
- Eduardo Engel & Ronald Fischer & Alexander Galetovic, 1999. "Toll competition among congested roads," Documentos de Trabajo 54, Centro de Economía Aplicada, Universidad de Chile.
- Schmidt, Klaus M., 1996.
"Incomplete contracts and privatization,"
European Economic Review, Elsevier, vol. 40(3-5), pages 569-579, April.
- Schmidt, Klaus M., 1996. "Incomplete contracts and privatization," Munich Reprints in Economics 19776, University of Munich, Department of Economics.
- Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
- Xiao, Feng & Yang, Hai & Han, Deren, 2007. "Competition and efficiency of private toll roads," Transportation Research Part B: Methodological, Elsevier, vol. 41(3), pages 292-308, March.
- Shu, Hang & Durango-Cohen, Pablo L., 2021. "On the design of optimal auctions for road concessions: Firm selection, government payments, toll and capacity schedules with imperfect information," Transportation Research Part B: Methodological, Elsevier, vol. 146(C), pages 210-236.
- Lu, Zhaoyang & Meng, Qiang, 2017. "Analysis of optimal BOT highway capacity and economic toll adjustment provisions under traffic demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 100(C), pages 17-37.
- Verhoef, Erik T. & Emmerink, Richard H. M. & Nijkamp, Peter & Rietveld, Piet, 1996. "Information provision, flat and fine congestion tolling and the efficiency of road usage," Regional Science and Urban Economics, Elsevier, vol. 26(5), pages 505-529, August.
- Harks, Tobias & Schröder, Marc & Vermeulen, Dries, 2019. "Toll caps in privatized road networks," European Journal of Operational Research, Elsevier, vol. 276(3), pages 947-956.
- Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
- Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Huang, Naqun & Lien, Jaimie W. & Zheng, Jie, 2023. "To acquire or compete? Government intervention in transportation under different route structures," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 172(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Meng, Qiang & Lu, Zhaoyang, 2017. "Quantitative analyses of highway franchising under build-operate-transfer scheme: Critical review and future research directions," Transportation Research Part B: Methodological, Elsevier, vol. 102(C), pages 105-123.
- Wang, Wei (Walker) & Jin, Xi & Tan, Zhijia & Sun, Huijun & Wu, Jianjun, 2022. "Modeling the effects of government subsidy and regulation on BOT transport project contract design within contractible service quality," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 164(C).
- Hoang-Tung, Nguyen & Viet Hung, Do & Kato, Hironori & Binh, Phan Le, 2021. "Modeling ceiling price for build-operate-transfer road projects in developing countries," Economics of Transportation, Elsevier, vol. 28(C).
- Chen, Zhiyuan & Ye, Hanrui & Liu, Bingxi & Xue, Weili, 2021. "Analysis of road capacity and franchise price decision delegation in toll road BOT project," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 146(C).
- Zhao, Yunpeng & Song, Jinbo & Feng, Zhuo & Jin, Lulu, 2023. "Incentive contracts with demand guarantee in BOT toll road projects," Research in Transportation Economics, Elsevier, vol. 98(C).
- Feng, Zhuo & Song, Jinbo & Yang, Xiaoxing & Guo, Ran, 2023. "Contractual flexibility, firm effort, and subsidy design: A comparison of PPP project contracts," European Journal of Operational Research, Elsevier, vol. 307(1), pages 484-496.
- Shi, Shasha & An, Qingxian & Chen, Ke, 2020. "Optimal choice of capacity, toll, and subsidy for build-operate-transfer roads with a paid minimum traffic guarantee," Transportation Research Part A: Policy and Practice, Elsevier, vol. 139(C), pages 228-254.
- Lu, Zhaoyang & Meng, Qiang, 2023. "Effects of asymmetric investment cost information on revenue-compensated build-operate-transfer highway contracts," Transportation Research Part B: Methodological, Elsevier, vol. 172(C), pages 71-92.
- Zhang, Yiwen & Feng, Zhuo & Zhang, Shuibo & Song, Jinbo, 2018. "The effects of service level on BOT transport project contract," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 118(C), pages 184-206.
- Feng, Zhuo & Zhang, Yiwen & Zhang, Shuibo & Song, Jinbo, 2018. "Contracting and renegotiating with a loss-averse private firm in BOT road projects," Transportation Research Part B: Methodological, Elsevier, vol. 112(C), pages 40-72.
- Song, Jinbo & Zhao, Yunpeng & Jin, Lulu & Sun, Yan, 2018. "Pareto optimization of public-private partnership toll road contracts with government guarantees," Transportation Research Part A: Policy and Practice, Elsevier, vol. 117(C), pages 158-175.
- Wang, Fan & Xiong, Minghua & Niu, Baozhuang & Zhuo, Xiaopo, 2018. "Impact of government subsidy on BOT contract design: Price, demand, and concession period," Transportation Research Part B: Methodological, Elsevier, vol. 110(C), pages 137-159.
- Niu, Baozhuang & Zhang, Jie, 2013. "Price, capacity and concession period decisions of Pareto-efficient BOT contracts with demand uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 53(C), pages 1-14.
- Shi, Shasha & Yin, Yafeng & An, Qingxian & Chen, Ke, 2021. "Optimal build-operate-transfer road contracts under information asymmetry and uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 152(C), pages 65-86.
- Shu, Hang & Durango-Cohen, Pablo L., 2021. "On the design of optimal auctions for road concessions: Firm selection, government payments, toll and capacity schedules with imperfect information," Transportation Research Part B: Methodological, Elsevier, vol. 146(C), pages 210-236.
- Shi, Shasha & Tuo, Yuhui & Pan, Meixu & Yin, Yafeng & Chen, Yue & Zhou, Xiongwei & Chen, Ke, 2024. "Signaling contracts design for Build–Operate–Transfer roads under asymmetric traffic demand information," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 183(C).
- Yuan, Jingfeng & Ding, Hongxing & Huang, Zeyuan & Deng, Binchao & Li, Shuai & Huang, Wei, 2021. "Influence of market structures on concession pricing in Public-Private-Partnership utilities with asymmetric information," Utilities Policy, Elsevier, vol. 69(C).
- Lu, Zhaoyang & Meng, Qiang, 2018. "Impacts of pavement deterioration and maintenance cost on Pareto-efficient contracts for highway franchising," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 113(C), pages 1-21.
- Tan, Zhijia & Yang, Hai, 2012. "Flexible build-operate-transfer contracts for road franchising under demand uncertainty," Transportation Research Part B: Methodological, Elsevier, vol. 46(10), pages 1419-1439.
- Lu, Zhaoyang & Li, Yanfeng & Zuo, Dajie, 2024. "Period-dependent pricing methods of multi-type vehicles for BOT highway projects with pavement rehabilitation effects," Transport Policy, Elsevier, vol. 150(C), pages 84-94.
More about this item
Keywords
Road network; Congestion cost; Build–Operate–Transfer;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transe:v:164:y:2022:i:c:s1366554522001247. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/600244/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.