IDEAS home Printed from https://ideas.repec.org/a/eee/reensy/v231y2023ics0951832022006329.html
   My bibliography  Save this article

Optimizing uploading and downloading pace distribution in system with two non-identical storage units

Author

Listed:
  • Levitin, Gregory
  • Xing, Liudong
  • Dai, Yuanshun

Abstract

This paper, for the first time, models and optimizes the uploading and downloading pace distribution in a production-dual storage system that must supply a certain demand during a specified mission time. The surplus product generated by the production unit is uploaded to available storage unit(s), which may be subsequently downloaded to supply the system demand in the event of the failure of the production unit. The uploading and downloading paces of the two storage units can greatly affect failure probabilities of the storage units and further the mission success probability (MSP). This paper makes advancement in the state of the art by suggesting a probabilistic approach for evaluating the MSP of the considered production-dual storage system. The optimal uploading and downloading pace distribution problem is then solved to maximize the MSP. Two case studies of water supply systems respectively with identical and dissimilar tanks are conducted to illustrate the proposed model and optimal uploading and downloading pace distribution solutions. Impacts of several system parameters (system demand, performance of the production unit, reliability and initial amount of product in storage units) and their interactions on the MSP and optimization solutions are also investigated through the case studies.

Suggested Citation

  • Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2023. "Optimizing uploading and downloading pace distribution in system with two non-identical storage units," Reliability Engineering and System Safety, Elsevier, vol. 231(C).
  • Handle: RePEc:eee:reensy:v:231:y:2023:i:c:s0951832022006329
    DOI: 10.1016/j.ress.2022.109017
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0951832022006329
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ress.2022.109017?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal loading of repairable system with perfect product storage," Reliability Engineering and System Safety, Elsevier, vol. 220(C).
    2. Hamada, Michael & Martz, Harry F. & Berg, Eric C. & Koehler, Arthur J., 2006. "Optimizing the product-based availability of a buffered industrial process," Reliability Engineering and System Safety, Elsevier, vol. 91(9), pages 1039-1048.
    3. Levitin, Gregory & Amari, Suprasad V., 2009. "Optimal load distribution in series–parallel systems," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 254-260.
    4. Xiao, Hui & Shi, Daimin & Ding, Yi & Peng, Rui, 2016. "Optimal loading and protection of multi-state systems considering performance sharing mechanism," Reliability Engineering and System Safety, Elsevier, vol. 149(C), pages 88-95.
    5. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimizing the maximum filling level of perfect storage in system with imperfect production unit," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    6. Jia, Heping & Peng, Rui & Yang, Li & Wu, Tianyi & Liu, Dunnan & Li, Yanbin, 2022. "Reliability evaluation of demand-based warm standby systems with capacity storage," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
    7. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Minimizing mission cost for production system with unreliable storage," Reliability Engineering and System Safety, Elsevier, vol. 227(C).
    8. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Unrepairable system with consecutively used imperfect storage units," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    9. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal sequencing of elements activation in 1-out-of-n warm standby system with storage," Reliability Engineering and System Safety, Elsevier, vol. 221(C).
    10. Levitin, Gregory & Finkelstein, Maxim, 2019. "Optimal loading of elements in series systems exposed to external shocks," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    11. Gajpal, Yuvraj & Nourelfath, Mustapha, 2015. "Two efficient heuristics to solve the integrated load distribution and production planning problem," Reliability Engineering and System Safety, Elsevier, vol. 144(C), pages 204-214.
    12. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2014. "Optimal component loading in 1-out-of-N cold standby systems," Reliability Engineering and System Safety, Elsevier, vol. 127(C), pages 58-64.
    13. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2018. "Co-optimization of state dependent loading and mission abort policy in heterogeneous warm standby systems," Reliability Engineering and System Safety, Elsevier, vol. 172(C), pages 151-158.
    14. Zhu, Xiaoning & Yan, Rui & Peng, Rui & Zhang, Zhongxin, 2020. "Optimal routing, loading and aborting of UAVs executing both visiting tasks and transportation tasks," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    15. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2021. "Influence of storage on mission success probability of m-out-of-n standby systems with reusable elements," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
    16. Levitin, Gregory & Xing, Liudong & Ben-Haim, Hanoch & Dai, Yuanshun, 2016. "Optimal task partition and state-dependent loading in heterogeneous two-element work sharing system," Reliability Engineering and System Safety, Elsevier, vol. 156(C), pages 97-108.
    17. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal mission aborting in multistate systems with storage," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
    18. Prajapati, Vijaykumar K. & Mahajan, Vasundhara, 2021. "Reliability assessment and congestion management of power system with energy storage system and uncertain renewable resources," Energy, Elsevier, vol. 215(PB).
    19. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2017. "Optimal loading of series parallel systems with arbitrary element time-to-failure and time-to-repair distributions," Reliability Engineering and System Safety, Elsevier, vol. 164(C), pages 34-44.
    20. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Unrepairable system with single production unit and n failure-prone identical parallel storage units," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    21. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2015. "Optimal loading of system with random repair time," European Journal of Operational Research, Elsevier, vol. 247(1), pages 137-143.
    22. Cheng, Chen & Yang, Jun & Li, Lei, 2020. "Reliability assessment of multi-state phased mission systems with common bus performance sharing considering transmission loss and performance storage," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2024. "Optimizing corrective maintenance for multistate systems with storage," Reliability Engineering and System Safety, Elsevier, vol. 244(C).
    2. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2023. "Standby mode transfer schedule minimizing downtime of 1-out-of-N system with storage," Reliability Engineering and System Safety, Elsevier, vol. 237(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Loading policy minimizing cumulative unsupplied demand of production system with storage," Reliability Engineering and System Safety, Elsevier, vol. 228(C).
    2. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal loading of repairable system with perfect product storage," Reliability Engineering and System Safety, Elsevier, vol. 220(C).
    3. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2024. "Optimizing corrective maintenance for multistate systems with storage," Reliability Engineering and System Safety, Elsevier, vol. 244(C).
    4. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Minimizing mission cost for production system with unreliable storage," Reliability Engineering and System Safety, Elsevier, vol. 227(C).
    5. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimizing the maximum filling level of perfect storage in system with imperfect production unit," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    6. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Unrepairable system with consecutively used imperfect storage units," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    7. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Unrepairable system with single production unit and n failure-prone identical parallel storage units," Reliability Engineering and System Safety, Elsevier, vol. 222(C).
    8. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2024. "Consecutively connected systems with unreliable resource generators and storages," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    9. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal sequencing of elements activation in 1-out-of-n warm standby system with storage," Reliability Engineering and System Safety, Elsevier, vol. 221(C).
    10. Levitin, Gregory & Finkelstein, Maxim, 2019. "Optimal loading of elements in series systems exposed to external shocks," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    11. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2023. "Standby mode transfer schedule minimizing downtime of 1-out-of-N system with storage," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
    12. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2023. "Co-optimizing component allocation and activation sequence in heterogeneous 1-out-of-n standby system exposed to shocks," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
    13. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal mission aborting in multistate systems with storage," Reliability Engineering and System Safety, Elsevier, vol. 218(PA).
    14. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2023. "Predetermined standby mode transfers in 1-out-of-N systems with resource-constrained elements," Reliability Engineering and System Safety, Elsevier, vol. 229(C).
    15. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2024. "Allocation and activation of resource constrained shock-exposed components in heterogeneous 1-out-of-n standby system," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    16. Xiao, Hui & Shi, Daimin & Ding, Yi & Peng, Rui, 2016. "Optimal loading and protection of multi-state systems considering performance sharing mechanism," Reliability Engineering and System Safety, Elsevier, vol. 149(C), pages 88-95.
    17. Zhao, Xian & Dai, Ying & Qiu, Qingan & Wu, Yaguang, 2022. "Joint optimization of mission aborts and allocation of standby components considering mission loss," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    18. Levitin, Gregory & Xing, Liudong & Huang, Hong Zhong, 2019. "Dynamic availability and performance deficiency of common bus systems with imperfectly repairable components," Reliability Engineering and System Safety, Elsevier, vol. 189(C), pages 58-66.
    19. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Heterogeneous 1-out-of-n standby systems with limited unit operation time," Reliability Engineering and System Safety, Elsevier, vol. 224(C).
    20. Wu, Congshan & Zhao, Xian & Wang, Xiaoyue & Wang, Siqi, 2021. "Reliability analysis of performance-based balanced systems with common bus performance sharing," Reliability Engineering and System Safety, Elsevier, vol. 215(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:231:y:2023:i:c:s0951832022006329. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.