Integrated model of production planning and imperfect preventive maintenance policy for single machine system

Author

Listed:
  • Shijin Wang

Abstract

This paper investigates the integrated problem of imperfect preventive maintenance and tactical production planning for a single machine system, in which a set of products must be produced in lots throughout a specified finite planning horizon. The machine is assumed to be subject to random failure, and periodic preventive maintenance (PM) and periodic system overhaul are executed to reduce the risk of failure. The PM is assumed to be imperfect and system overhaul is perfect, and minimal repair is conducted at machine failure. The objective is to determine both the lengths of PM cycle and system overhaul cycle to minimise the expected sum of PM costs, repair costs, system overhaul costs, setup costs, holding costs, backorder costs and production costs, while satisfying the demand for all products over the planning horizon. The problem is formulated as an integer linear programme problem and is solved by comparing the results of several multi-product capacitated lot-sizing problems. An illustrative example is also given to show the steps to obtain an optimal solution and show the cost benefit of integrated production and maintenance strategy.

Suggested Citation

  • Shijin Wang, 2013. "Integrated model of production planning and imperfect preventive maintenance policy for single machine system," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 18(2), pages 140-156.
  • Handle: RePEc:ids:ijores:v:18:y:2013:i:2:p:140-156
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=56103
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Gouiaa-Mtibaa, A. & Dellagi, S. & Achour, Z. & Erray, W., 2018. "Integrated Maintenance-Quality policy with rework process under improved imperfect preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 173(C), pages 1-11.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijores:v:18:y:2013:i:2:p:140-156. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=170 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.