Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2013.01.031
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Michael H. Peters & Helmut Schneider & Kwei Tang, 1988. "Joint Determination of Optimal Inventory and Quality Control Policy," Management Science, INFORMS, vol. 34(8), pages 991-1004, August.
- Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Lot Sizing with Machine Breakdowns," Management Science, INFORMS, vol. 38(1), pages 104-123, January.
- Chiu, Singa Wang & Wang, Shan-Ling & Chiu, Yuan-Shyi Peter, 2007. "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns," European Journal of Operational Research, Elsevier, vol. 180(2), pages 664-676, July.
- Ben-Daya, M. & Noman, S.M., 2008. "Integrated inventory and inspection policies for stochastic demand," European Journal of Operational Research, Elsevier, vol. 185(1), pages 159-169, February.
- Mourani, Iyad & Hennequin, Sophie & Xie, Xiaolan, 2008. "Simulation-based optimization of a single-stage failure-prone manufacturing system with transportation delay," International Journal of Production Economics, Elsevier, vol. 112(1), pages 26-36, March.
- T. Bielecki & P. R. Kumar, 1988. "Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems," Operations Research, INFORMS, vol. 36(4), pages 532-541, August.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Gharbi, A. & Kenne, J. P., 2000. "Production and preventive maintenance rates control for a manufacturing system: An experimental design approach," International Journal of Production Economics, Elsevier, vol. 65(3), pages 275-287, May.
- Noguera, Jose H. & Watson, Edward F., 2006. "Response surface analysis of a multi-product batch processing facility using a simulation metamodel," International Journal of Production Economics, Elsevier, vol. 102(2), pages 333-343, August.
- Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
- Chakraborty, Tulika & Giri, B.C. & Chaudhuri, K.S., 2009. "Production lot sizing with process deterioration and machine breakdown under inspection schedule," Omega, Elsevier, vol. 37(2), pages 257-271, April.
- Harry Groenevelt & Liliane Pintelon & Abraham Seidmann, 1992. "Production Batching with Machine Breakdowns and Safety Stocks," Operations Research, INFORMS, vol. 40(5), pages 959-971, October.
- Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.
- Liao, Gwo-Liang & Chen, Yen Hung & Sheu, Shey-Huei, 2009. "Optimal economic production quantity policy for imperfect process with imperfect repair and maintenance," European Journal of Operational Research, Elsevier, vol. 195(2), pages 348-357, June.
- J.Q. Hu & Pirooz Vakili & Lei Huang, 2004. "Capacity and Production Managment in a Single Product Manufacturing System," Annals of Operations Research, Springer, vol. 125(1), pages 191-204, January.
- Hau L. Lee & Meir J. Rosenblatt, 1987. "Simultaneous Determination of Production Cycle and Inspection Schedules in a Production System," Management Science, INFORMS, vol. 33(9), pages 1125-1136, September.
- Khan, M. & Jaber, M.Y. & Guiffrida, A.L. & Zolfaghari, S., 2011. "A review of the extensions of a modified EOQ model for imperfect quality items," International Journal of Production Economics, Elsevier, vol. 132(1), pages 1-12, July.
- Lavoie, P. & Gharbi, A. & Kenné, J.-P., 2010. "A comparative study of pull control mechanisms for unreliable homogenous transfer lines," International Journal of Production Economics, Elsevier, vol. 124(1), pages 241-251, March.
- Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
- Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system," International Journal of Production Economics, Elsevier, vol. 173(C), pages 184-198.
- Zhou, Jing & Liu, Yu & Liang, Decui & Tang, Maochun, 2023. "A new risk analysis approach to seek best production action during new product introduction," International Journal of Production Economics, Elsevier, vol. 262(C).
- Assid, M. & Gharbi, A. & Dhouib, K., 2015. "Joint production and subcontracting planning of unreliable multi-facility multi-product production systems," Omega, Elsevier, vol. 50(C), pages 54-69.
- Jafari, L. & Makis, V., 2015. "Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring," International Journal of Production Economics, Elsevier, vol. 169(C), pages 156-168.
- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean-Pierre & Montaño-Arango, Oscar & Hernandez-Gress, Eva Selene, 2016. "Production control problem integrating overhaul and subcontracting strategies for a quality deteriorating manufacturing system," International Journal of Production Economics, Elsevier, vol. 171(P1), pages 134-150.
- Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
- Mohammed Alkahtani & Muhammad Omair & Qazi Salman Khalid & Ghulam Hussain & Imran Ahmad & Catalin Pruncu, 2021. "A COVID-19 Supply Chain Management Strategy Based on Variable Production under Uncertain Environment Conditions," IJERPH, MDPI, vol. 18(4), pages 1-23, February.
- Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
- Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
- Zou, Jing & Chang, Qing & Arinez, Jorge & Xiao, Guoxian, 2017. "Data-driven modeling and real-time distributed control for energy efficient manufacturing systems," Energy, Elsevier, vol. 127(C), pages 247-257.
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
- Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kazaz, Burak & Sloan, Thomas W., 2013. "The impact of process deterioration on production and maintenance policies," European Journal of Operational Research, Elsevier, vol. 227(1), pages 88-100.
- Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
- Peymankar, Mahboobe & Dehghanian, Farzad & Ghiami, Yousef & Abolbashari, Mohammad Hassan, 2018. "The effects of contractual agreements on the economic production quantity model with machine breakdown," International Journal of Production Economics, Elsevier, vol. 201(C), pages 203-215.
- Harun Öztürk, 2021. "Optimal production run time for an imperfect production inventory system with rework, random breakdowns and inspection costs," Operational Research, Springer, vol. 21(1), pages 167-204, March.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Taleizadeh, Ata Allah & Cárdenas-Barrón, Leopoldo Eduardo & Mohammadi, Babak, 2014. "A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process," International Journal of Production Economics, Elsevier, vol. 150(C), pages 9-27.
- Om Prakash & A.R. Roy & A. Goswami, 2014. "Stochastic manufacturing system with process deterioration and machine breakdown," International Journal of Systems Science, Taylor & Francis Journals, vol. 45(12), pages 2539-2551, December.
- Jeang, Angus, 2012. "Simultaneous determination of production lot size and process parameters under process deterioration and process breakdown," Omega, Elsevier, vol. 40(6), pages 774-781.
- K.Y. Kung & Y.D. Huang & H.M. Wee & Y. Daryanto, 2019. "Production-Inventory System for Deteriorating Items with Machine Breakdown, Inspection, and Partial Backordering," Mathematics, MDPI, vol. 7(7), pages 1-26, July.
- Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
- Lie-Fern Hsu & Jia-Tzer Hsu, 2016. "Economic production quantity (EPQ) models under an imperfect production process with shortages backordered," International Journal of Systems Science, Taylor & Francis Journals, vol. 47(4), pages 852-867, March.
- B C Giri & T Dohi, 2005. "Exact formulation of stochastic EMQ model for an unreliable production system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(5), pages 563-575, May.
- Peng, Hao & van Houtum, Geert-Jan, 2016. "Joint optimization of condition-based maintenance and production lot-sizing," European Journal of Operational Research, Elsevier, vol. 253(1), pages 94-107.
- Giri, B. C. & Yun, W. Y. & Dohi, T., 2005. "Optimal design of unreliable production-inventory systems with variable production rate," European Journal of Operational Research, Elsevier, vol. 162(2), pages 372-386, April.
- Kim, Chang Hyun & Hong, Yushin, 1997. "An extended EMQ model for a failure prone machine with general lifetime distribution," International Journal of Production Economics, Elsevier, vol. 49(3), pages 215-223, May.
- Muhammad Tayyab & Biswajit Sarkar & Bernardo Nugroho Yahya, 2018. "Imperfect Multi-Stage Lean Manufacturing System with Rework under Fuzzy Demand," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
- Meller, Russell D. & Kim, David S., 1996. "The impact of preventive maintenance on system cost and buffer size," European Journal of Operational Research, Elsevier, vol. 95(3), pages 577-591, December.
- Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
- Hyun Kim, Chang & Hong, Yushin, 1999. "An optimal production run length in deteriorating production processes," International Journal of Production Economics, Elsevier, vol. 58(2), pages 183-189, January.
- Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
More about this item
Keywords
Unreliable manufacturing systems; Acceptance sampling plan; Optimal lot sizing; Feedback control policy; Simulation; Response surface methodology;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:144:y:2013:i:1:p:143-156. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.