Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
Author
Abstract
Suggested Citation
DOI: 10.1080/00207721.2014.911387
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Richard Barlow & Larry Hunter, 1960. "Optimum Preventive Maintenance Policies," Operations Research, INFORMS, vol. 8(1), pages 90-100, February.
- Zhang, Yuan Lin & Wang, Guan Jun, 2007. "A deteriorating cold standby repairable system with priority in use," European Journal of Operational Research, Elsevier, vol. 183(1), pages 278-295, November.
- Aven, Terje & Castro, I.T., 2008. "A minimal repair replacement model with two types of failure and a safety constraint," European Journal of Operational Research, Elsevier, vol. 188(2), pages 506-515, July.
- Castro, I.T. & Pérez-Ocón, R., 2006. "Reward optimization of a repairable system," Reliability Engineering and System Safety, Elsevier, vol. 91(3), pages 311-319.
- Xiaolin Liang & Yeh Lam & Zehui Li, 2011. "Optimal replacement policy for a general geometric process model with δ-shock," International Journal of Systems Science, Taylor & Francis Journals, vol. 42(12), pages 2021-2034.
- G.Q. Cheng & L. Li, 2011. "Two different general monotone process models for a deteriorating system and its optimisation," International Journal of Systems Science, Taylor & Francis Journals, vol. 42(1), pages 57-62.
- Nakagawa, Toshio & Kowada, Masashi, 1983. "Analysis of a system with minimal repair and its application to replacement policy," European Journal of Operational Research, Elsevier, vol. 12(2), pages 176-182, February.
- Jaturonnatee, J. & Murthy, D.N.P. & Boondiskulchok, R., 2006. "Optimal preventive maintenance of leased equipment with corrective minimal repairs," European Journal of Operational Research, Elsevier, vol. 174(1), pages 201-215, October.
- Wang, Guan Jun & Zhang, Yuan Lin, 2013. "Optimal repair–replacement policies for a system with two types of failures," European Journal of Operational Research, Elsevier, vol. 226(3), pages 500-506.
- Shey-Huei Sheu & Suh-Huey Li & Chin-Chih Chang, 2012. "A generalised maintenance policy with age-dependent minimal repair cost for a system subject to shocks under periodic overhaul," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(6), pages 1007-1013.
- Leung, Kit Nam Francis & Zhang, Yuan Lin & Lai, Kin Keung, 2011. "Analysis for a two-dissimilar-component cold standby repairable system with repair priority," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1542-1551.
- Lam, Yeh, 2007. "A geometric process maintenance model with preventive repair," European Journal of Operational Research, Elsevier, vol. 182(2), pages 806-819, October.
- G.Q. Cheng & L. Li, 2012. "A geometric process repair model with inspections and its optimisation," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(9), pages 1650-1655.
- Yu, Miaomiao & Tang, Yinghui & Liu, Liping & Cheng, Jiang, 2013. "A phase-type geometric process repair model with spare device procurement and repairman’s multiple vacations," European Journal of Operational Research, Elsevier, vol. 225(2), pages 310-323.
- Miaomiao Yu & Yinghui Tang & Yonghong Fu, 2013. "A geometric process model for /(/)/1/ queue with new service machine procurement lead time," International Journal of Systems Science, Taylor & Francis Journals, vol. 44(6), pages 1061-1075.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Junyuan Wang & Jimin Ye, 2022. "A new repair model and its optimization for cold standby system," Operational Research, Springer, vol. 22(1), pages 105-122, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Arnold, Richard & Chukova, Stefanka & Hayakawa, Yu & Marshall, Sarah, 2020. "Geometric-Like Processes: An Overview and Some Reliability Applications," Reliability Engineering and System Safety, Elsevier, vol. 201(C).
- Junyuan Wang & Jimin Ye, 2022. "A new repair model and its optimization for cold standby system," Operational Research, Springer, vol. 22(1), pages 105-122, March.
- Yu, Miaomiao & Tang, Yinghui & Liu, Liping & Cheng, Jiang, 2013. "A phase-type geometric process repair model with spare device procurement and repairman’s multiple vacations," European Journal of Operational Research, Elsevier, vol. 225(2), pages 310-323.
- Sarada, Y. & Shenbagam, R., 2021. "Optimization of a repairable deteriorating system subject to random threshold failure using preventive repair and stochastic lead time," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Miaomiao Yu & Yinghui Tang, 2024. "Analyze periodic inspection and replacement policy of a shock and wear model with phase-type inter-shock arrival times using roots method," Journal of Risk and Reliability, , vol. 238(2), pages 233-246, April.
- Miaomiao Yu & Yinghui Tang, 2017. "Optimal replacement policy based on maximum repair time for a random shock and wear model," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 25(1), pages 80-94, April.
- Juan Eloy Ruiz-Castro, 2015. "A preventive maintenance policy for a standby system subject to internal failures and external shocks with loss of units," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(9), pages 1600-1613, July.
- Delia Montoro-Cazorla & Rafael Pérez-Ocón, 2022. "Optimizing Costs in a Reliability System under Markovian Arrival of Failures and Reposition by K -Policy Inspection," Mathematics, MDPI, vol. 10(11), pages 1-21, June.
- Sheu, Shey-Huei, 1998. "A generalized age and block replacement of a system subject to shocks," European Journal of Operational Research, Elsevier, vol. 108(2), pages 345-362, July.
- Tsai, Hsin-Nan & Sheu, Shey-Huei & Zhang, Zhe George, 2017. "A trivariate optimal replacement policy for a deteriorating system based on cumulative damage and inspections," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 74-88.
- Navarro, Jorge & Arriaza, Antonio & Suárez-Llorens, Alfonso, 2019. "Minimal repair of failed components in coherent systems," European Journal of Operational Research, Elsevier, vol. 279(3), pages 951-964.
- Sheu, Shey-Huei, 1999. "Extended optimal replacement model for deteriorating systems," European Journal of Operational Research, Elsevier, vol. 112(3), pages 503-516, February.
- Hooti, Fatemeh & Ahmadi, Jafar & Longobardi, Maria, 2020. "Optimal extended warranty length with limited number of repairs in the warranty period," Reliability Engineering and System Safety, Elsevier, vol. 203(C).
- Eryilmaz, Serkan, 2012. "On the mean residual life of a k-out-of-n:G system with a single cold standby component," European Journal of Operational Research, Elsevier, vol. 222(2), pages 273-277.
- Sheu, Shey-Huei & Tsai, Hsin-Nan & Sheu, Uan-Yu & Zhang, Zhe George, 2019. "Optimal replacement policies for a system based on a one-cycle criterion," Reliability Engineering and System Safety, Elsevier, vol. 191(C).
- J-A Chen & Y-H Chien, 2007. "Optimal age-replacement policy for renewing warranted products," Journal of Risk and Reliability, , vol. 221(4), pages 229-237, December.
- Juang, Muh-Guey & Anderson, Gary, 2004. "A Bayesian method on adaptive preventive maintenance problem," European Journal of Operational Research, Elsevier, vol. 155(2), pages 455-473, June.
- Wen Liang Chang, 2015. "Optimal single-replacement for repairable products with different failure rate under a finite planning horizon," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(6), pages 1003-1009, April.
- Shey-Huei Sheu & Chin-Chih Chang & Yu-Hung Chien, 2011. "Optimal age-replacement time with minimal repair based on cumulative repair-cost limit for a system subject to shocks," Annals of Operations Research, Springer, vol. 186(1), pages 317-329, June.
- Sheu, Shey-Huei & Chien, Yu-Hung, 2004. "Optimal age-replacement policy of a system subject to shocks with random lead-time," European Journal of Operational Research, Elsevier, vol. 159(1), pages 132-144, November.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tsysxx:v:47:y:2016:i:5:p:1021-1031. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TSYS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.