IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v139y2002i2p262-276.html
   My bibliography  Save this article

Decentralized reactive Kanban system

Author

Listed:
  • Takahashi, Katsuhiko
  • Nakamura, Nobuto

Abstract

No abstract is available for this item.

Suggested Citation

  • Takahashi, Katsuhiko & Nakamura, Nobuto, 2002. "Decentralized reactive Kanban system," European Journal of Operational Research, Elsevier, vol. 139(2), pages 262-276, June.
  • Handle: RePEc:eee:ejores:v:139:y:2002:i:2:p:262-276
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(01)00358-7
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mark L. Spearman, 1992. "Customer Service in Pull Production Systems," Operations Research, INFORMS, vol. 40(5), pages 948-958, October.
    2. Kubiak, Wieslaw, 1993. "Minimizing variation of production rates in just-in-time systems: A survey," European Journal of Operational Research, Elsevier, vol. 66(3), pages 259-271, May.
    3. Sridhar R. Tayur, 1993. "Structural Properties and a Heuristic for Kanban-Controlled Serial Lines," Management Science, INFORMS, vol. 39(11), pages 1347-1368, November.
    4. Price, Wilson & Gravel, Marc & Nsakanda, Aaron Luntala, 1994. "A review of optimisation models of Kanban-based production systems," European Journal of Operational Research, Elsevier, vol. 75(1), pages 1-12, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
    2. Ilgin, Mehmet Ali & Gupta, Surendra M., 2011. "Performance improvement potential of sensor embedded products in environmental supply chains," Resources, Conservation & Recycling, Elsevier, vol. 55(6), pages 580-592.
    3. Lage Junior, Muris & Godinho Filho, Moacir, 2010. "Variations of the kanban system: Literature review and classification," International Journal of Production Economics, Elsevier, vol. 125(1), pages 13-21, May.
    4. S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Takahashi, Katsuhiko & Morikawa, Katsumi & Nakamura, Nobuto, 2004. "Reactive JIT ordering system for changes in the mean and variance of demand," International Journal of Production Economics, Elsevier, vol. 92(2), pages 181-196, November.
    2. Zhao Xiaobo & Qiguo Gong & Kenichi Nakashima, 2001. "Analysis of a production system in a general configuration," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(2), pages 128-143, March.
    3. Cao, Dong & Chen, Mingyuan, 2005. "A mixed integer programming model for a two line CONWIP-based production and assembly system," International Journal of Production Economics, Elsevier, vol. 95(3), pages 317-326, March.
    4. Wallace J. Hopp & Mark L. Spearman, 2004. "To Pull or Not to Pull: What Is the Question?," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 133-148, August.
    5. Arabatzis, Garyfallos & Petridis, Konstantinos & Galatsidas, Spyros & Ioannou, Konstantinos, 2013. "A demand scenario based fuelwood supply chain: A conceptual model," Renewable and Sustainable Energy Reviews, Elsevier, vol. 25(C), pages 687-697.
    6. Kim, Ilhyung & Tang, Christopher S., 1997. "Lead time and response time in a pull production control system," European Journal of Operational Research, Elsevier, vol. 101(3), pages 474-485, September.
    7. Seki, Yoichi & Hoshino, Naoto, 1999. "Transient behavior of a single-stage kanban system based on the queueing model," International Journal of Production Economics, Elsevier, vol. 60(1), pages 369-374, April.
    8. Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
    9. Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
    10. Boysen, Nils & Scholl, Armin & Wopperer, Nico, 2012. "Resequencing of mixed-model assembly lines: Survey and research agenda," European Journal of Operational Research, Elsevier, vol. 216(3), pages 594-604.
    11. Fernandes, Nuno Octavio & do Carmo-Silva, Silvio, 2006. "Generic POLCA--A production and materials flow control mechanism for quick response manufacturing," International Journal of Production Economics, Elsevier, vol. 104(1), pages 74-84, November.
    12. Corominas, Albert & Kubiak, Wieslaw & Pastor, Rafael, 2010. "Mathematical programming modeling of the Response Time Variability Problem," European Journal of Operational Research, Elsevier, vol. 200(2), pages 347-357, January.
    13. Pettersen, Jan-Arne & Segerstedt, Anders, 2009. "Restricted work-in-process: A study of differences between Kanban and CONWIP," International Journal of Production Economics, Elsevier, vol. 118(1), pages 199-207, March.
    14. García-Villoria, Alberto & Salhi, Said & Corominas, Albert & Pastor, Rafael, 2011. "Hyper-heuristic approaches for the response time variability problem," European Journal of Operational Research, Elsevier, vol. 211(1), pages 160-169, May.
    15. Boysen, Nils & Emde, Simon & Hoeck, Michael & Kauderer, Markus, 2015. "Part logistics in the automotive industry: Decision problems, literature review and research agenda," European Journal of Operational Research, Elsevier, vol. 242(1), pages 107-120.
    16. Liberopoulos, George & Koukoumialos, Stelios, 2005. "Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information," International Journal of Production Economics, Elsevier, vol. 96(2), pages 213-232, May.
    17. Steiner, George & Yeomans, Julian Scott, 1996. "Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging," European Journal of Operational Research, Elsevier, vol. 95(1), pages 38-52, November.
    18. Drexl, Andreas & Kimms, Alf, 1999. "Belastungsorientierte Just-in-Time Variantenfließfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 502, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    19. Caridi, Maria & Sianesi, Andrea, 2000. "Multi-agent systems in production planning and control: An application to the scheduling of mixed-model assembly lines," International Journal of Production Economics, Elsevier, vol. 68(1), pages 29-42, October.
    20. Boysen, Nils & Fliedner, Malte & Scholl, Armin, 2009. "Sequencing mixed-model assembly lines: Survey, classification and model critique," European Journal of Operational Research, Elsevier, vol. 192(2), pages 349-373, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:139:y:2002:i:2:p:262-276. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.