IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v72y2001i1p27-40.html
   My bibliography  Save this article

A combined AHP-GP model for quality control systems

Author

Listed:
  • Badri, Masood A.

Abstract

No abstract is available for this item.

Suggested Citation

  • Badri, Masood A., 2001. "A combined AHP-GP model for quality control systems," International Journal of Production Economics, Elsevier, vol. 72(1), pages 27-40, June.
  • Handle: RePEc:eee:proeco:v:72:y:2001:i:1:p:27-40
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(00)00077-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Erkut, Erhan & Moran, Stephen R., 1991. "Locating obnoxious facilities in the public sector: An application of the analytic hierarchy process to municipal landfill siting decisions," Socio-Economic Planning Sciences, Elsevier, vol. 25(2), pages 89-102.
    2. Schniederjans, Marc J. & Garvin, Tim, 1997. "Using the analytic hierarchy process and multi-objective programming for the selection of cost drivers in activity-based costing," European Journal of Operational Research, Elsevier, vol. 100(1), pages 72-80, July.
    3. Schniederjans, Marc J. & Karuppan, Corinne M., 1995. "Designing a quality control system in a service organization: A goal programming case study," European Journal of Operational Research, Elsevier, vol. 81(2), pages 249-258, March.
    4. Linda L. Johnson & Michael J. Dotson & B.J. Dunlap, 1988. "Service Quality Determinants and Effectiveness in the Real Estate Brokerage Industry," Journal of Real Estate Research, American Real Estate Society, vol. 3(2), pages 21-36.
    5. חנה וייל, 1995. "סיעוד במגזר הערבי," Working Papers 397, National Insurance Institute of Israel.
    6. Babakus, Emin & Boller, Gregory W., 1992. "An empirical assessment of the SERVQUAL scale," Journal of Business Research, Elsevier, vol. 24(3), pages 253-268, May.
    7. אסתר טולידנו, 1995. "מקבלי דמי אבטלה בשנת 1994," Working Papers 444, National Insurance Institute of Israel.
    8. Myint, San & Tabucanon, Mario T., 1994. "A multiple-criteria approach to machine selection for flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 33(1-3), pages 121-131, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Cinzia Colapinto & Raja Jayaraman & Simone Marsiglio, 2017. "Multi-criteria decision analysis with goal programming in engineering, management and social sciences: a state-of-the art review," Annals of Operations Research, Springer, vol. 251(1), pages 7-40, April.
    2. Pasura Aungkulanon & Walailak Atthirawong & Pongchanun Luangpaiboon, 2023. "Fuzzy Analytical Hierarchy Process for Strategic Decision Making in Electric Vehicle Adoption," Sustainability, MDPI, vol. 15(8), pages 1-20, April.
    3. Ho, William, 2008. "Integrated analytic hierarchy process and its applications - A literature review," European Journal of Operational Research, Elsevier, vol. 186(1), pages 211-228, April.
    4. Cherif, Mohamed Sadok & Chabchoub, Habib & Aouni, Belaid, 2008. "Quality control system design through the goal programming model and the satisfaction functions," European Journal of Operational Research, Elsevier, vol. 186(3), pages 1084-1098, May.
    5. Aikaterini Papapostolou & Charikleia Karakosta & Georgios Apostolidis & Haris Doukas, 2020. "An AHP-SWOT-Fuzzy TOPSIS Approach for Achieving a Cross-Border RES Cooperation," Sustainability, MDPI, vol. 12(7), pages 1-28, April.
    6. Łuczak, Aleksandra & Kozera, Agnieszka, 2021. "A model to assess the development priorities of local administrations through the hierarchy of strategic factors," Journal of Policy Modeling, Elsevier, vol. 43(2), pages 474-492.
    7. Emre Çalişkan & Erdem Aksakal & Saliha Çetinyokuş & Tahsin Çetinyokuş, 2019. "Hybrid Use of Likert Scale-Based AHP and PROMETHEE Methods for Hazard Analysis and Consequence Modeling (HACM) Software Selection," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 18(05), pages 1689-1715, September.
    8. Ayfer Basar & Özgür Kabak & Y. Ilker Topcu, 2017. "A Decision Support Methodology for Locating Bank Branches: A Case Study in Turkey," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 16(01), pages 59-86, January.
    9. Kengpol, Athakorn & Meethom, Warapoj & Tuominen, Markku, 2012. "The development of a decision support system in multimodal transportation routing within Greater Mekong sub-region countries," International Journal of Production Economics, Elsevier, vol. 140(2), pages 691-701.
    10. Ho, Hui-Ping & Chang, Ching-Ter & Ku, Cheng-Yuan, 2015. "House selection via the internet by considering homebuyers’ risk attitudes with S-shaped utility functions," European Journal of Operational Research, Elsevier, vol. 241(1), pages 188-201.
    11. Bertolini, Massimo & Bevilacqua, Maurizio, 2006. "A combined goal programming—AHP approach to maintenance selection problem," Reliability Engineering and System Safety, Elsevier, vol. 91(7), pages 839-848.
    12. Kahraman, Cengiz & Cebeci, Ufuk & Ruan, Da, 2004. "Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey," International Journal of Production Economics, Elsevier, vol. 87(2), pages 171-184, January.
    13. Chang Sun & Kai Wang & Qiong Liu & Pujin Wang & Feng Pan, 2023. "Machine-Learning-Based Comprehensive Properties Prediction and Mixture Design Optimization of Ultra-High-Performance Concrete," Sustainability, MDPI, vol. 15(21), pages 1-25, October.
    14. Özcan, Evren Can & Ünlüsoy, Sultan & Eren, Tamer, 2017. "A combined goal programming – AHP approach supported with TOPSIS for maintenance strategy selection in hydroelectric power plants," Renewable and Sustainable Energy Reviews, Elsevier, vol. 78(C), pages 1410-1423.
    15. Fathi Abid & Slah Bahloul, 2010. "Selected MENA Countries’ Attractiveness to G7 Investors," Working Papers 531, Economic Research Forum, revised 07 Jan 2010.
    16. Jerónimo Aznar & Francisco Guijarro & José Moreno-Jiménez, 2011. "Mixed valuation methods: a combined AHP-GP procedure for individual and group multicriteria agricultural valuation," Annals of Operations Research, Springer, vol. 190(1), pages 221-238, October.
    17. Aznar Bellver, Jerónimo & Guijarro Martínez, Francisco & Moreno Jiménez, José María, 2007. "Valoración Agraria multicriterio en un entorno con escasa información/Multicriteria Agricultural Valuation in an Environment with scarce information," Estudios de Economia Aplicada, Estudios de Economia Aplicada, vol. 25, pages 549-572, Abril.
    18. Ya Lan WANG & Tainyi LUOR & Pin LUARN & Hsi-peng LU, 2015. "Contribution and Trend to Quality Research—a literature review of SERVQUAL model from 1998 to 2013," Informatica Economica, Academy of Economic Studies - Bucharest, Romania, vol. 19(1), pages 34-45.
    19. Yurdakul, Mustafa & Ic, Yusuf Tansel, 2004. "AHP approach in the credit evaluation of the manufacturing firms in Turkey," International Journal of Production Economics, Elsevier, vol. 88(3), pages 269-289, April.
    20. Edward Sanneh & Allen Hu & Chia-Wei Hsu & Momodou Njie, 2014. "Prioritization of climate change adaptation approaches in the Gambia," Mitigation and Adaptation Strategies for Global Change, Springer, vol. 19(8), pages 1163-1178, December.
    21. Harshitha Urs Ajjipura Shankar & Udaya Kumara Kodipalya Nanjappa & M. D. Alsulami & Ballajja C. Prasannakumara, 2022. "A Fuzzy AHP-Fuzzy TOPSIS Urged Baseline Aid for Execution Amendment of an Online Food Delivery Affability," Mathematics, MDPI, vol. 10(16), pages 1-24, August.
    22. Vaidya, Omkarprasad S. & Kumar, Sushil, 2006. "Analytic hierarchy process: An overview of applications," European Journal of Operational Research, Elsevier, vol. 169(1), pages 1-29, February.
    23. Sherong Zhang & Bo Sun & Lei Yan & Chao Wang, 2013. "Risk identification on hydropower project using the IAHP and extension of TOPSIS methods under interval-valued fuzzy environment," Natural Hazards: Journal of the International Society for the Prevention and Mitigation of Natural Hazards, Springer;International Society for the Prevention and Mitigation of Natural Hazards, vol. 65(1), pages 359-373, January.
    24. Topaloglu, Seyda, 2009. "A shift scheduling model for employees with different seniority levels and an application in healthcare," European Journal of Operational Research, Elsevier, vol. 198(3), pages 943-957, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kingsman, Brian G., 2000. "Modelling input-output workload control for dynamic capacity planning in production planning systems," International Journal of Production Economics, Elsevier, vol. 68(1), pages 73-93, October.
    2. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
    3. Ginn, Martin E., 1998. "Underpinning professional career development through a systems analysis methodology," Socio-Economic Planning Sciences, Elsevier, vol. 32(1), pages 67-81, March.
    4. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    5. James E. Anderson, 2002. "Trade Reform Diagnostics with Many Households, Quotas, and Tariffs," Review of International Economics, Wiley Blackwell, vol. 10(2), pages 215-236, May.
    6. Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2014. "Network DEA II," International Series in Operations Research & Management Science, in: Wade D. Cook & Joe Zhu (ed.), Data Envelopment Analysis, edition 127, chapter 0, pages 307-327, Springer.
    7. Koerner, Melissa M., 2000. "The Conceptual Domain of Service Quality for Inpatient Nursing Services," Journal of Business Research, Elsevier, vol. 48(3), pages 267-283, June.
    8. Ekins, Paul & Simon, Sandrine, 2003. "An illustrative application of the CRITINC framework to the UK," Ecological Economics, Elsevier, vol. 44(2-3), pages 255-275, March.
    9. Saydam, Cem & Aytug, Haldun, 2003. "Accurate estimation of expected coverage: revisited," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 69-80, March.
    10. Kangasharju, Aki & Nijkamp, Peter, 2001. "Innovation dynamics in space: local actors and local factors," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 31-56, March.
    11. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
    12. Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
    13. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
    14. Robalo Marques, Carlos & Duarte Neves, Pedro & Morais Sarmento, Luis, 2003. "Evaluating core inflation indicators," Economic Modelling, Elsevier, vol. 20(4), pages 765-775, July.
    15. Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
    16. Hong, Sung-Chul & Park, Yang-Byung, 1999. "A heuristic for bi-objective vehicle routing with time window constraints," International Journal of Production Economics, Elsevier, vol. 62(3), pages 249-258, September.
    17. Labelle, A. & Langevin, A. & Campbell, J. F., 2002. "Sector design for snow removal and disposal in urban areas," Socio-Economic Planning Sciences, Elsevier, vol. 36(3), pages 183-202, September.
    18. Cook, Wade D. & Green, Rodney H., 2000. "Project prioritization: a resource-constrained data envelopment analysis approach," Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 85-99, June.
    19. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    20. Percy, David F. & Kobbacy, Khairy A. H. & Fawzi, Bahir B., 1997. "Setting preventive maintenance schedules when data are sparse," International Journal of Production Economics, Elsevier, vol. 51(3), pages 223-234, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:72:y:2001:i:1:p:27-40. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.