IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v69y2001i1p49-64.html
   My bibliography  Save this article

Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments

Author

Listed:
  • Ertugrul Karsak, E.
  • Tolga, Ethem

Abstract

No abstract is available for this item.

Suggested Citation

  • Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
  • Handle: RePEc:eee:proeco:v:69:y:2001:i:1:p:49-64
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(00)00081-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. R. E. Bellman & L. A. Zadeh, 1970. "Decision-Making in a Fuzzy Environment," Management Science, INFORMS, vol. 17(4), pages 141-164, December.
    2. Dubois, Didier & Prade, Henri, 1986. "Fuzzy sets and statistical data," European Journal of Operational Research, Elsevier, vol. 25(3), pages 345-356.
    3. Small, Michael H. & Chen, Injazz J., 1997. "Economic and strategic justification of AMT inferences from industrial practices," International Journal of Production Economics, Elsevier, vol. 49(1), pages 65-75, March.
    4. אסתר טולידנו, 1992. "מקבלי דמי אבטלה בשנת 1991," Working Papers 563, National Insurance Institute of Israel.
    5. דליה גורדון ותמר אליאב, 1992. "משפחות חד הוריות, 1991," Working Papers 539, National Insurance Institute of Israel.
    6. Shang, Jen & Sueyoshi, Toshiyuki, 1995. "A unified framework for the selection of a Flexible Manufacturing System," European Journal of Operational Research, Elsevier, vol. 85(2), pages 297-315, September.
    7. אסתר טולידנו, 1988. "מקבלי דמי אבטלה בשנת 1987," Working Papers 374, National Insurance Institute of Israel.
    8. Karsak, E. Ertugrul & Tolga, Ethem, 1998. "An overhaul-replacement model for equipment subject to technological change in an inflation-prone economy," International Journal of Production Economics, Elsevier, vol. 56(1), pages 291-301, September.
    9. תמר אליאב ולאה ענבר, 1992. "גמלאות אמהות 1990/91," Working Papers 519, National Insurance Institute of Israel.
    10. חנה וייל, 1995. "סיעוד במגזר הערבי," Working Papers 397, National Insurance Institute of Israel.
    11. אסתר טולידנו, 1995. "מקבלי דמי אבטלה בשנת 1994," Working Papers 444, National Insurance Institute of Israel.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Chang, Yu-Hern & Yeh, Chung-Hsing & Wang, Shih-Yi, 2007. "A survey and optimization-based evaluation of development strategies for the air cargo industry," International Journal of Production Economics, Elsevier, vol. 106(2), pages 550-562, April.
    2. Chang, Ping-Teng, 2005. "Fuzzy strategic replacement analysis," European Journal of Operational Research, Elsevier, vol. 160(2), pages 532-559, January.
    3. Oderanti, Festus Oluseyi & De Wilde, Philippe, 2010. "Dynamics of business games with management of fuzzy rules for decision making," International Journal of Production Economics, Elsevier, vol. 128(1), pages 96-109, November.
    4. Haktanır, Elif & Kahraman, Cengiz, 2023. "Intuitionistic fuzzy risk adjusted discount rate and certainty equivalent methods for risky projects," International Journal of Production Economics, Elsevier, vol. 257(C).
    5. Vicente Javier Clemente-Suárez & Eduardo Navarro-Jiménez & Pablo Ruisoto & Athanasios A. Dalamitros & Ana Isabel Beltran-Velasco & Alberto Hormeño-Holgado & Carmen Cecilia Laborde-Cárdenas & Jose Fran, 2021. "Performance of Fuzzy Multi-Criteria Decision Analysis of Emergency System in COVID-19 Pandemic. An Extensive Narrative Review," IJERPH, MDPI, vol. 18(10), pages 1-12, May.
    6. Surajit Nath & Bijan Sarkar, 2018. "Decision system framework for performance evaluation of advanced manufacturing technology under fuzzy environment," OPSEARCH, Springer;Operational Research Society of India, vol. 55(3), pages 703-720, November.
    7. Min-Sung Kim & Eul-Bum Lee & In-Hye Jung & Douglas Alleman, 2018. "Risk Assessment and Mitigation Model for Overseas Steel-Plant Project Investment with Analytic Hierarchy Process—Fuzzy Inference System," Sustainability, MDPI, vol. 10(12), pages 1-17, December.
    8. Kulak, Osman & Kahraman, Cengiz, 2005. "Multi-attribute comparison of advanced manufacturing systems using fuzzy vs. crisp axiomatic design approach," International Journal of Production Economics, Elsevier, vol. 95(3), pages 415-424, March.
    9. Kengpol, Athakorn, 2004. "Design of a decision support system to evaluate the investment in a new distribution centre," International Journal of Production Economics, Elsevier, vol. 90(1), pages 59-70, July.
    10. Xuedong Liang & Xianli Zhao & Min Wang & Zhi Li, 2018. "Small and Medium-Sized Enterprises Sustainable Supply Chain Financing Decision Based on Triple Bottom Line Theory," Sustainability, MDPI, vol. 10(11), pages 1-17, November.
    11. Jedrzej Charlampowicz & Slawomir Skiba, 2023. "Relationship between Various Components of Management in Pomeranian Communes Based on FUZZY-DEMATEL Approach," European Research Studies Journal, European Research Studies Journal, vol. 0(3), pages 197-207.
    12. Chandra, Charu & Everson, Mark & Grabis, Janis, 2005. "Evaluation of enterprise-level benefits of manufacturing flexibility," Omega, Elsevier, vol. 33(1), pages 17-31, February.
    13. Keon Chul Park & Dong-Hee Shin, 2017. "Security assessment framework for IoT service," Telecommunication Systems: Modelling, Analysis, Design and Management, Springer, vol. 64(1), pages 193-209, January.
    14. Rajak, Manindra & Shaw, Krishnendu, 2019. "Evaluation and selection of mobile health (mHealth) applications using AHP and fuzzy TOPSIS," Technology in Society, Elsevier, vol. 59(C).
    15. Chien-Wen Shen & Yen-Ting Peng & Chang-Shu Tu, 2019. "Multi-Criteria Decision-Making Techniques for Solving the Airport Ground Handling Service Equipment Vendor Selection Problem," Sustainability, MDPI, vol. 11(12), pages 1-21, June.
    16. Qianwang Deng & Xiahui Liu & Haolan Liao, 2015. "Identifying Critical Factors in the Eco-Efficiency of Remanufacturing Based on the Fuzzy DEMATEL Method," Sustainability, MDPI, vol. 7(11), pages 1-21, November.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    2. Ginn, Martin E., 1998. "Underpinning professional career development through a systems analysis methodology," Socio-Economic Planning Sciences, Elsevier, vol. 32(1), pages 67-81, March.
    3. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    4. Ekins, Paul & Simon, Sandrine, 2003. "An illustrative application of the CRITINC framework to the UK," Ecological Economics, Elsevier, vol. 44(2-3), pages 255-275, March.
    5. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
    6. Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
    7. Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo, 2001. "Optimal multiple delivery schedule for demand in logistic model," International Journal of Production Economics, Elsevier, vol. 73(3), pages 241-249, October.
    8. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
    9. Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
    10. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
    11. Pennings, Enrico & Natter, Martin, 2001. "Strategic diversification and capacity utilization," International Journal of Production Economics, Elsevier, vol. 72(3), pages 261-272, August.
    12. Baker, Rose D., 2000. "Calculating the expected failure rate of complex equipment subject to hazardous repair," International Journal of Production Economics, Elsevier, vol. 67(1), pages 53-61, August.
    13. De Toni, Alberto & Nassimbeni, Guido, 2001. "A method for the evaluation of suppliers co-design effort," International Journal of Production Economics, Elsevier, vol. 72(2), pages 169-180, July.
    14. Singpurwalla, Norah & Forman, Ernest & Zalkind, David, 1999. "Promoting shared health care decision making using the analytic hierarchy process," Socio-Economic Planning Sciences, Elsevier, vol. 33(4), pages 277-299, December.
    15. Forza, Cipriano & Filippini, Roberto, 1998. "TQM impact on quality conformance and customer satisfaction: A causal model," International Journal of Production Economics, Elsevier, vol. 55(1), pages 1-20, June.
    16. Avella, Lucia & Fernandez, Esteban & Vazquez, Camilo J., 2001. "Analysis of manufacturing strategy as an explanatory factor of competitiveness in the large Spanish industrial firm," International Journal of Production Economics, Elsevier, vol. 72(2), pages 139-157, July.
    17. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
    18. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    19. Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
    20. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:69:y:2001:i:1:p:49-64. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.