IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v39y1989i1p17-31.html
   My bibliography  Save this article

Production scheduling: Practice and theory

Author

Listed:
  • Buxey, Geoff

Abstract

No abstract is available for this item.

Suggested Citation

  • Buxey, Geoff, 1989. "Production scheduling: Practice and theory," European Journal of Operational Research, Elsevier, vol. 39(1), pages 17-31, March.
  • Handle: RePEc:eee:ejores:v:39:y:1989:i:1:p:17-31
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(89)90349-4
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. F. Rodriguez & C. Blum & C. García-Martínez & M. Lozano, 2012. "GRASP with path-relinking for the non-identical parallel machine scheduling problem with minimising total weighted completion times," Annals of Operations Research, Springer, vol. 201(1), pages 383-401, December.
    2. Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Other publications TiSEM 0cf065b7-4836-4cdd-9317-0, Tilburg University, School of Economics and Management.
    3. Yingling, Jon C. & Goh, Chon-Huat & Ganguli, Rajive, 1999. "Analysis of the twisting department at Superior Cable Corporation: A case study," European Journal of Operational Research, Elsevier, vol. 115(1), pages 19-35, May.
    4. Wiers, V. C. S., 1997. "A review of the applicability of OR and AI scheduling techniques in practice," Omega, Elsevier, vol. 25(2), pages 145-153, April.
    5. Bhattacharya, Arijit & Vasant, Pandian, 2007. "Soft-sensing of level of satisfaction in TOC product-mix decision heuristic using robust fuzzy-LP," European Journal of Operational Research, Elsevier, vol. 177(1), pages 55-70, February.
    6. Ashayeri, J. & van Esch, W.H.L. & Heuts, R.M.J., 1992. "Amendment of Heuts-Selen's lotsizing and sequencing heuristic for single stage process manufacturing systems," Research Memorandum FEW 579, Tilburg University, School of Economics and Management.
    7. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
    8. Victor Portougal & David J. Robb, 2000. "Production Scheduling Theory: Just Where Is It Applicable?," Interfaces, INFORMS, vol. 30(6), pages 64-76, December.
    9. Kuik, Roelof & Tielemans, Peter F. J., 1997. "Setup utilization as a performance indicator in production planning and control," International Journal of Production Economics, Elsevier, vol. 49(2), pages 175-182, April.
    10. Spitter, J.M. & de Kok, A.G. & Dellaert, N.P., 2005. "Timing production in LP models in a rolling schedule," International Journal of Production Economics, Elsevier, vol. 93(1), pages 319-329, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:39:y:1989:i:1:p:17-31. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.