Scheduling Networks of Queues: Heavy Traffic Analysis of a Multistation Network with Controllable Inputs
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.40.3.S312
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yoni Nazarathy & Gideon Weiss, 2009. "Near optimal control of queueing networks over a finite time horizon," Annals of Operations Research, Springer, vol. 170(1), pages 233-249, September.
- Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
- Kathryn E. Caggiano & John A. Muckstadt & James A. Rappold, 2006. "Integrated Real-Time Capacity and Inventory Allocation for Reparable Service Parts in a Two-Echelon Supply System," Manufacturing & Service Operations Management, INFORMS, vol. 8(3), pages 292-319, August.
- Land, Martin J. & Gaalman, Gerard J.C., 1995. "Workload control concepts in job shops: a critical assessment," Research Report 95A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Lambrecht, Marc R. & Vandaele, Nico J., 1996. "A general approximation for the single product lot sizing model with queueing delays," European Journal of Operational Research, Elsevier, vol. 95(1), pages 73-88, November.
- J. G. Dai & Wuqin Lin, 2005. "Maximum Pressure Policies in Stochastic Processing Networks," Operations Research, INFORMS, vol. 53(2), pages 197-218, April.
- Barış Ata, 2006. "Dynamic Control of a Multiclass Queue with Thin Arrival Streams," Operations Research, INFORMS, vol. 54(5), pages 876-892, October.
- Li, Hui & Liu, Liming, 2006. "Production control in a two-stage system," European Journal of Operational Research, Elsevier, vol. 174(2), pages 887-904, October.
- repec:dgr:rugsom:95a42 is not listed on IDEAS
- Ick-Hyun Nam, 2001. "Dynamic Scheduling for a Flexible Processing Network," Operations Research, INFORMS, vol. 49(2), pages 305-315, April.
More about this item
Keywords
production/scheduling: priority sequencing in a stochastic job shop; queues: Brownian models of network scheduling problems;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:40:y:1992:i:3-supplement-2:p:s312-s334. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.