IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v38y1992i10p1467-1481.html
   My bibliography  Save this article

Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs

Author

Listed:
  • Iftekhar A. Karimi

    (Department of Chemical Engineering, Northwestern University, Evanston, Illinois 60208-3120)

Abstract

Scheduling of multistage serial production systems under constant demand and infinite horizon is considered. The production stages operate with periodic shut-downs and startups. An integer nonlinear programming formulation is presented for determining a stationary, cyclic schedule with no stock-outs in any inventory and minimum sum of set-up and inventory costs. It allows a lot-sizing policy involving arbitrary, noninteger splitting/merging of lots. Three, almost optimal, heuristic algorithms and an exact branch and bound algorithm are developed using analytical results. Their evaluation using simulated problems shows the branch and bound algorithm to be the best, as it is fast even for systems with as many as 11 stages.

Suggested Citation

  • Iftekhar A. Karimi, 1992. "Optimal Cycle Times in Multistage Serial Systems with Set-Up and Inventory Costs," Management Science, INFORMS, vol. 38(10), pages 1467-1481, October.
  • Handle: RePEc:inm:ormnsc:v:38:y:1992:i:10:p:1467-1481
    DOI: 10.1287/mnsc.38.10.1467
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.38.10.1467
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.38.10.1467?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hoque, M. A. & Kingsman, B. G., 1995. "An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system," International Journal of Production Economics, Elsevier, vol. 42(2), pages 161-174, December.
    2. Hadjinicola, George C. & Soteriou, Andreas C., 2003. "Reducing the cost of defects in multistage production systems: A budget allocation perspective," European Journal of Operational Research, Elsevier, vol. 145(3), pages 621-634, March.
    3. G C Hadjinicola, 2010. "Manufacturing costs in serial production systems with rework," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(2), pages 342-351, February.
    4. Kim, DaeSoo, 1999. "Optimal two-stage lot sizing and inventory batching policies," International Journal of Production Economics, Elsevier, vol. 58(3), pages 221-234, January.
    5. Huang, Rong-Hwa, 2010. "Multi-objective job-shop scheduling with lot-splitting production," International Journal of Production Economics, Elsevier, vol. 124(1), pages 206-213, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:38:y:1992:i:10:p:1467-1481. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.