Optimizing multi-stage production with constant lot size and varying number of unequal sized batches
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- S. K. Goyal, 1976. "Note--Note on "Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model"," Management Science, INFORMS, vol. 23(3), pages 332-333, November.
- Goyal, S. K. & Szendrovits, A. Z., 1986. "A constant lot size model with equal and unequal sized batch shipments between production stages," Engineering Costs and Production Economics, Elsevier, vol. 10(3), pages 203-210, March.
- Andrew Z. Szendrovits, 1975. "Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model," Management Science, INFORMS, vol. 22(3), pages 298-308, November.
- Leroy B. Schwarz & Linus Schrage, 1975. "Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems," Management Science, INFORMS, vol. 21(11), pages 1285-1294, July.
- Drezner, Z. & Szendrovits, A. Z. & Wesolowsky, G. O., 1984. "Multi-stage production with variable lot sizes and transportation of partial lots," European Journal of Operational Research, Elsevier, vol. 17(2), pages 227-237, August.
- Szendrovits, Andrew Z & Drezner, ZVI, 1980. "Optimizing multi-stage production with constant lot size and varying numbers of batches," Omega, Elsevier, vol. 8(6), pages 623-629.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hoai Le Thi & Duc Tran, 2014. "Optimizing a multi-stage production/inventory system by DC programming based approaches," Computational Optimization and Applications, Springer, vol. 57(2), pages 441-468, March.
- Wang, X. & Li, D. & O'brien, C. & Li, Y., 2010. "A production planning model to reduce risk and improve operations management," International Journal of Production Economics, Elsevier, vol. 124(2), pages 463-474, April.
- Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
- Kim, Taebok & Glock, Christoph H., 2018. "Production planning for a two-stage production system with multiple parallel machines and variable production rates," International Journal of Production Economics, Elsevier, vol. 196(C), pages 284-292.
- Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
- D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
- Riezebos, Jan, 2002. "Time bucket size and lot-splitting approach," Research Report 02A42, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- repec:dgr:rugsom:02a42 is not listed on IDEAS
- Kenyon, George & Canel, Cem & Neureuther, Brian D., 2005. "The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing," International Journal of Production Economics, Elsevier, vol. 97(3), pages 263-278, September.
- Wen-Tsung Ho & Jason Chao-Hsien Pan & Yu-Cheng Hsiao, 2012. "Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments," Journal of Optimization Theory and Applications, Springer, vol. 153(2), pages 513-531, May.
- Hsiao, Yu-Cheng & Lin, Yi & Huang, Yun-Kuei, 2010. "Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 408-413, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hsiao, Yu-Cheng & Lin, Yi & Huang, Yun-Kuei, 2010. "Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain," International Journal of Production Economics, Elsevier, vol. 124(2), pages 408-413, April.
- Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
- Wen-Tsung Ho & Jason Chao-Hsien Pan & Yu-Cheng Hsiao, 2012. "Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments," Journal of Optimization Theory and Applications, Springer, vol. 153(2), pages 513-531, May.
- Sarin, Subhash C. & Kalir, Adar A. & Chen, Ming, 2008. "A single-lot, unified cost-based flow shop lot-streaming problem," International Journal of Production Economics, Elsevier, vol. 113(1), pages 413-424, May.
- Hsiao, Yu-Cheng, 2008. "Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information," International Journal of Production Economics, Elsevier, vol. 115(1), pages 229-235, September.
- Wen-Tsung Ho & Yu-Cheng Hsiao, 2014. "Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System," Journal of Optimization Theory and Applications, Springer, vol. 161(2), pages 648-663, May.
- Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
- D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
- Hoque, M.A. & Kingsman, B.G., 2006. "Synchronization in common cycle lot size scheduling for a multi-product serial supply chain," International Journal of Production Economics, Elsevier, vol. 103(1), pages 316-331, September.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Kim, DaeSoo, 1999. "Optimal two-stage lot sizing and inventory batching policies," International Journal of Production Economics, Elsevier, vol. 58(3), pages 221-234, January.
- Hoai Le Thi & Duc Tran, 2014. "Optimizing a multi-stage production/inventory system by DC programming based approaches," Computational Optimization and Applications, Springer, vol. 57(2), pages 441-468, March.
- Jaber, Mohamad Y. & Khan, Mehmood, 2010. "Managing yield by lot splitting in a serial production line with learning, rework and scrap," International Journal of Production Economics, Elsevier, vol. 124(1), pages 32-39, March.
- Hoque, M. A. & Kingsman, B. G., 1995. "An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system," International Journal of Production Economics, Elsevier, vol. 42(2), pages 161-174, December.
- Ouenniche, Jamal & Boctor, Fayez F., 2001. "The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops," European Journal of Operational Research, Elsevier, vol. 129(3), pages 539-554, March.
- Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
- Dana Marsetiya Utama & Fakhrina Fahma Abdullah & Ikhlasul Amallynda & Teguh Baroto, 2024. "Integrated production-inventory model for multi-item raw materials with exponential quality degradation: a real case study," OPSEARCH, Springer;Operational Research Society of India, vol. 61(4), pages 1862-1887, December.
- Hoque, M. A. & Goyal, S. K., 2000. "An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment," International Journal of Production Economics, Elsevier, vol. 65(3), pages 305-315, May.
- Pundoor, Guruprasad & Chen, Zhi-Long, 2009. "Joint cyclic production and delivery scheduling in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 55-74, May.
- Ramasesh, Ranga V. & Fu, Haizhen & Fong, Duncan K. H. & Hayya, Jack C., 2000. "Lot streaming in multistage production systems," International Journal of Production Economics, Elsevier, vol. 66(3), pages 199-211, July.
More about this item
Keywords
Production/inventory model Multi-stage lot sizing Inventory batching policies;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:29:y:2001:i:2:p:183-191. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.