IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v278y2024ics0925527324002962.html
   My bibliography  Save this article

Generalized multi-manufacturer multi-retailer production-delivery supply chain model and its minimum cost solution policy

Author

Listed:
  • Hoque, M.A.
  • Babu, Md Ashraful

Abstract

Production of a product at multiple sources and its deliveries to multiple destinations are a common practice in business. Minimization of the integrated total cost of performing operations and transportation considering the relevant factors such as the minimum order quantity contract, capacities of transport vehicles, and times of transportation in this supply chain is essential, in supplying products to customers at reasonable lesser prices. However, such a supply chain has received little attention in terms of minimizing the integrated total cost taking into account these related factors explicitly. So, there lies a research scope on this topic to fulfill the growing need of minimizing the cost of production-deliveries of products to meet customers’ demands fruitfully. Here we develop such a generalized mathematical model to minimize the integrated total cost of carrying out operations at manufacturers and retailers, and transporting batches (sub-lots) of lots from sources to destinations considering the mentioned realistic constraints. The integrated production-delivery flow is synchronized by delivering lots with batches of equal and/or unequal sizes. First without considering transportation costs, we obtain optimal batches to minimize the total cost of the model. Each of these optimal batches is proportionally distributed at manufacturers as supplies and at retailers as demands. Then the minimum transportation cost solution from manufacturers to retailers is incorporated to the earlier solution to obtain the final result. We illustrate this solution policy with numerical example problems. Sensitivity analyses are performed to see the effect of increasing values of parameters on the minimum total cost.

Suggested Citation

  • Hoque, M.A. & Babu, Md Ashraful, 2024. "Generalized multi-manufacturer multi-retailer production-delivery supply chain model and its minimum cost solution policy," International Journal of Production Economics, Elsevier, vol. 278(C).
  • Handle: RePEc:eee:proeco:v:278:y:2024:i:c:s0925527324002962
    DOI: 10.1016/j.ijpe.2024.109439
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527324002962
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2024.109439?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Almehdawe, Eman & Mantin, Benny, 2010. "Vendor managed inventory with a capacitated manufacturer and multiple retailers: Retailer versus manufacturer leadership," International Journal of Production Economics, Elsevier, vol. 128(1), pages 292-302, November.
    3. Ertogral, K. & Darwish, M. & Ben-Daya, M., 2007. "Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1592-1606, February.
    4. Boute, Robert N. & Disney, Stephen M. & Lambrecht, Marc R. & Van Houdt, Benny, 2007. "An integrated production and inventory model to dampen upstream demand variability in the supply chain," European Journal of Operational Research, Elsevier, vol. 178(1), pages 121-142, April.
    5. Islam, S.M. Shahidul & Hoque, Md. Abdul & Hamzah, Norhayati, 2017. "Single-supplier single-manufacturer multi-retailer consignment policy for retailers’ generalized demand distributions," International Journal of Production Economics, Elsevier, vol. 184(C), pages 157-167.
    6. Hoque, M. A. & Goyal, S. K., 2005. "On lot streaming in multistage production systems," International Journal of Production Economics, Elsevier, vol. 95(2), pages 195-202, February.
    7. Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Li, Yantong & Chu, Feng & Chu, Chengbin & Zhu, Zhanguo, 2019. "An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing," European Journal of Operational Research, Elsevier, vol. 272(3), pages 914-927.
    9. Hoque, M.A., 2011. "Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization," International Journal of Production Economics, Elsevier, vol. 131(2), pages 463-472, June.
    10. Hoque, M.A., 2013. "A vendor–buyer integrated production–inventory model with normal distribution of lead time," International Journal of Production Economics, Elsevier, vol. 144(2), pages 409-417.
    11. Jing-Sheng Song & Hanqin Zhang & Yumei Hou & Mingzheng Wang, 2010. "The Effect of Lead Time and Demand Uncertainties in ( r, q ) Inventory Systems," Operations Research, INFORMS, vol. 58(1), pages 68-80, February.
    12. Ben-Daya, M. & Hariga, M., 2004. "Integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 92(1), pages 75-80, November.
    13. Salal Humair & John D. Ruark & Brian Tomlin & Sean P. Willems, 2013. "Incorporating Stochastic Lead Times Into the Guaranteed Service Model of Safety Stock Optimization," Interfaces, INFORMS, vol. 43(5), pages 421-434, October.
    14. Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
    15. Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
    16. Shiyu Liu & Ou Liu & Xiaoming Jiang, 2023. "An Efficient Algorithm for the Joint Replenishment Problem with Quantity Discounts, Minimum Order Quantity and Transport Capacity Constraints," Mathematics, MDPI, vol. 11(4), pages 1-18, February.
    17. Hoque, M. A. & Kingsman, B. G., 1995. "An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system," International Journal of Production Economics, Elsevier, vol. 42(2), pages 161-174, December.
    18. Jing-Sheng Song & Candace A. Yano & Panupol Lerssrisuriya, 2000. "Contract Assembly: Dealing with Combined Supply Lead Time and Demand Quantity Uncertainty," Manufacturing & Service Operations Management, INFORMS, vol. 2(3), pages 287-296, July.
    19. Elhafsi, Mohsen & Hamouda, Essia, 2018. "Managing an integrated production and inventory system selling to a dual market: Long-term and walk-in," European Journal of Operational Research, Elsevier, vol. 268(1), pages 215-230.
    20. Geng, Wei & Qiu, Minmin & Zhao, Xiaobo, 2010. "An inventory system with single distributor and multiple retailers: Operating scenarios and performance comparison," International Journal of Production Economics, Elsevier, vol. 128(1), pages 434-444, November.
    21. Abdul-Jalbar, Beatriz & Gutiérrez, Jose M. & Sicilia, Joaquín, 2006. "Single cycle policies for the one-warehouse N-retailer inventory/distribution system," Omega, Elsevier, vol. 34(2), pages 196-208, April.
    22. Kim, Taebok & Hong, Yushin & Chang, Soo Young, 2006. "Joint economic procurement--production-delivery policy for multiple items in a single-manufacturer, multiple-retailer system," International Journal of Production Economics, Elsevier, vol. 103(1), pages 199-208, September.
    23. Hossain, Md Shahriar J. & Ohaiba, Mohamed M. & Sarker, Bhaba R., 2017. "An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness," International Journal of Production Economics, Elsevier, vol. 188(C), pages 50-62.
    24. Goyal, S. K. & Szendrovits, A. Z., 1986. "A constant lot size model with equal and unequal sized batch shipments between production stages," Engineering Costs and Production Economics, Elsevier, vol. 10(3), pages 203-210, March.
    25. Ponte, Borja & Costas, José & Puche, Julio & Pino, Raúl & de la Fuente, David, 2018. "The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 111(C), pages 165-185.
    26. Darwish, M.A. & Odah, O.M., 2010. "Vendor managed inventory model for single-vendor multi-retailer supply chains," European Journal of Operational Research, Elsevier, vol. 204(3), pages 473-484, August.
    27. Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
    28. M. A. Hoque, 2021. "An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 483-512, June.
    29. Hoque, M.A., 2008. "Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain," European Journal of Operational Research, Elsevier, vol. 188(3), pages 811-825, August.
    30. Cannella, Salvatore & Dominguez, Roberto & Framinan, Jose M., 2017. "Inventory record inaccuracy – The impact of structural complexity and lead time variability," Omega, Elsevier, vol. 68(C), pages 123-138.
    31. Hsiao, Yu-Cheng, 2008. "A note on integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 114(1), pages 294-297, July.
    32. Avci, Mustafa & Yildiz, Seyda Topaloglu, 2019. "A matheuristic solution approach for the production routing problem with visit spacing policy," European Journal of Operational Research, Elsevier, vol. 279(2), pages 572-588.
    33. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    34. Sana, Shib Sankar, 2020. "Price competition between green and non green products under corporate social responsible firm," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
    2. M. A. Hoque, 2021. "An optimal solution policy to an integrated manufacturer-retailers problem with normal distribution of lead times of delivering equal and unequal-sized batches," OPSEARCH, Springer;Operational Research Society of India, vol. 58(2), pages 483-512, June.
    3. Dana Marsetiya Utama & Fakhrina Fahma Abdullah & Ivan Darma Wangsa & Wakhid Ahmad Jauhari, 2025. "The Vendor–Buyer Inventory Model in Two Echelon Supply Chain: A Systematic Literature Review and Bibliometric Analysis," SN Operations Research Forum, Springer, vol. 6(1), pages 1-47, March.
    4. Juman, Z.A.M.S. & Hoque, M.A., 2014. "A heuristic solution technique to attain the minimal total cost bounds of transporting a homogeneous product with varying demands and supplies," European Journal of Operational Research, Elsevier, vol. 239(1), pages 146-156.
    5. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    6. M. A. Hoque & Z. A. M. S. Juman, 2024. "Decreased minimum total transportation–inventory cost bounds assuming variability in supplies and demands," OPSEARCH, Springer;Operational Research Society of India, vol. 61(4), pages 1888-1905, December.
    7. Sumon Sarkar & Sunil Tiwari & B. C. Giri, 2022. "Impact of uncertain demand and lead-time reduction on two-echelon supply chain," Annals of Operations Research, Springer, vol. 315(2), pages 2027-2055, August.
    8. Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
    9. Hariga, Moncer & Hassini, Elkafi & Ben-Daya, Mohamed, 2014. "A note on generalized single-vendor multi-buyer integrated inventory supply chain models with better synchronization," International Journal of Production Economics, Elsevier, vol. 154(C), pages 313-316.
    10. S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
    11. AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
    12. Mosca, Alyssa & Vidyarthi, Navneet & Satir, Ahmet, 2019. "Integrated transportation – inventory models: A review," Operations Research Perspectives, Elsevier, vol. 6(C).
    13. Hsiao, Yu-Cheng, 2008. "Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information," International Journal of Production Economics, Elsevier, vol. 115(1), pages 229-235, September.
    14. Hoque, M.A., 2008. "Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain," European Journal of Operational Research, Elsevier, vol. 188(3), pages 811-825, August.
    15. Wen-Tsung Ho & Yu-Cheng Hsiao, 2014. "Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System," Journal of Optimization Theory and Applications, Springer, vol. 161(2), pages 648-663, May.
    16. Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
    17. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    18. Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
    19. Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
    20. Rabin Kumar Mallick & Kartik Patra & Shyamal Kumar Mondal, 2020. "Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments," Annals of Operations Research, Springer, vol. 292(1), pages 341-369, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:278:y:2024:i:c:s0925527324002962. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.