Production‐inventory systems with imperfect advance demand information and updating
Author
Abstract
Suggested Citation
DOI: 10.1002/nav.20443
Download full text from publisher
References listed on IDEAS
- Thonemann, U. W., 2002. "Improving supply-chain performance by sharing advance demand information," European Journal of Operational Research, Elsevier, vol. 142(1), pages 81-107, October.
- Özalp Özer, 2003. "Replenishment Strategies for Distribution Systems Under Advance Demand Information," Management Science, INFORMS, vol. 49(3), pages 255-272, March.
- Guillermo Gallego & Özalp Özer, 2001. "Integrating Replenishment Decisions with Advance Demand Information," Management Science, INFORMS, vol. 47(10), pages 1344-1360, October.
- Kaijie Zhu & Ulrich W. Thonemann, 2004. "Modeling the Benefits of Sharing Future Demand Information," Operations Research, INFORMS, vol. 52(1), pages 136-147, February.
- Francis de Véricourt & Fikri Karaesmen & Yves Dallery, 2002. "Optimal Stock Allocation for a Capacitated Supply System," Management Science, INFORMS, vol. 48(11), pages 1486-1501, November.
- Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Oguzhan Vicil, 2021. "Optimizing stock levels for service-differentiated demand classes with inventory rationing and demand lead times," Flexible Services and Manufacturing Journal, Springer, vol. 33(2), pages 381-424, June.
- Awi Federgruen & Min Wang, 2015. "Inventory Models with Shelf-Age and Delay-Dependent Inventory Costs," Operations Research, INFORMS, vol. 63(3), pages 701-715, June.
- Feng, Haofang & Zhang, Sheng Hao & Zhang, Yong, 2023. "Managing production-inventory-maintenance systems with condition monitoring," European Journal of Operational Research, Elsevier, vol. 310(2), pages 698-711.
- Dursun, İpek & Akcay, Alp & van Houtum, Geert-Jan, 2024. "How good must failure predictions be to make local spare parts stock superfluous?," International Journal of Production Economics, Elsevier, vol. 267(C).
- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Alım, Muzaffer & Beullens, Patrick, 2022. "Improving inventory system performance by selective purchasing of buyers’ willingness to wait," European Journal of Operational Research, Elsevier, vol. 300(1), pages 124-136.
- Hanukov, Gabi & Avinadav, Tal & Chernonog, Tatyana & Yechiali, Uri, 2020. "A service system with perishable products where customers are either fastidious or strategic," International Journal of Production Economics, Elsevier, vol. 228(C).
- Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
- Wang, Yi & Zhang, Sheng Hao, 2021. "Optimal production and inventory rationing policies with selective-information sharing and two demand classes," European Journal of Operational Research, Elsevier, vol. 288(2), pages 394-407.
- Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Tong Wang & Beril L. Toktay, 2008. "Inventory Management with Advance Demand Information and Flexible Delivery," Management Science, INFORMS, vol. 54(4), pages 716-732, April.
- Fernando Bernstein & Gregory A. DeCroix, 2015. "Advance Demand Information in a Multiproduct System," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 52-65, February.
- Taher Ahmadi & Zümbül Atan & Ton de Kok & Ivo Adan, 2019. "Optimal control policies for an inventory system with commitment lead time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(3), pages 193-212, April.
- Rippe, Christoph & Kiesmüller, Gudrun P., 2023. "The repair kit problem with imperfect advance demand information," European Journal of Operational Research, Elsevier, vol. 304(2), pages 558-576.
- Tan, Tarkan & Güllü, Refik & Erkip, Nesim, 2009. "Using imperfect advance demand information in ordering and rationing decisions," International Journal of Production Economics, Elsevier, vol. 121(2), pages 665-677, October.
- Choi, Tsan-Ming & Sethi, Suresh, 2010. "Innovative quick response programs: A review," International Journal of Production Economics, Elsevier, vol. 127(1), pages 1-12, September.
- Long Gao & Susan H. Xu & Michael O. Ball, 2012. "Managing an Available-to-Promise Assembly System with Dynamic Short-Term Pseudo-Order Forecast," Management Science, INFORMS, vol. 58(4), pages 770-790, April.
- Felix Papier, 2016. "Supply Allocation Under Sequential Advance Demand Information," Operations Research, INFORMS, vol. 64(2), pages 341-361, April.
- Alım, Muzaffer & Beullens, Patrick, 2022. "Improving inventory system performance by selective purchasing of buyers’ willingness to wait," European Journal of Operational Research, Elsevier, vol. 300(1), pages 124-136.
- Felix Papier & Ulrich W. Thonemann, 2010. "Capacity Rationing in Stochastic Rental Systems with Advance Demand Information," Operations Research, INFORMS, vol. 58(2), pages 274-288, April.
- Alexandar Angelus & Özalp Özer, 2016. "Knowledge You Can Act on: Optimal Policies for Assembly Systems with Expediting and Advance Demand Information," Operations Research, INFORMS, vol. 64(6), pages 1338-1371, December.
- Jean-Philippe Gayon & Saif Benjaafar & Francis de Véricourt, 2009. "Using Imperfect Advance Demand Information in Production-Inventory Systems with Multiple Customer Classes," Manufacturing & Service Operations Management, INFORMS, vol. 11(1), pages 128-143, July.
- Jana Ralfs & Gudrun P. Kiesmüller, 2022. "Inventory management with advance demand information and flexible shipment consolidation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 44(4), pages 1009-1044, December.
- Liberopoulos, George, 2008. "On the tradeoff between optimal order-base-stock levels and demand lead-times," European Journal of Operational Research, Elsevier, vol. 190(1), pages 136-155, October.
- Guillermo Gallego & Haengju Lee, 2020. "Callable products with dependent demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 67(3), pages 185-200, April.
- Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Tetsuo Iida & Paul Zipkin, 2010. "Competition and Cooperation in a Two-Stage Supply Chain with Demand Forecasts," Operations Research, INFORMS, vol. 58(5), pages 1350-1363, October.
- Arcan Nalca, & Tamer Boyaci, & Saibal Ray, 2017. "Consumer taste uncertainty in the context of store brand and national brand competition," ESMT Research Working Papers ESMT-17-01, ESMT European School of Management and Technology.
- Christoph Rippe & Gudrun P. Kiesmüller, 2023. "The added value of advance demand information for the planning of a repair kit," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 31(1), pages 311-335, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:58:y:2011:i:2:p:88-106. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.