Spares provisioning strategy for periodically replaced units within the fleet retirement period
Author
Abstract
Suggested Citation
DOI: 10.1007/s13198-019-00791-z
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Molenaers, An & Baets, Herman & Pintelon, Liliane & Waeyenbergh, Geert, 2012. "Criticality classification of spare parts: A case study," International Journal of Production Economics, Elsevier, vol. 140(2), pages 570-578.
- Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
- Hur, Mansik & Keskin, Burcu B. & Schmidt, Charles P., 2018. "End-of-life inventory control of aircraft spare parts under performance based logistics," International Journal of Production Economics, Elsevier, vol. 204(C), pages 186-203.
- Levner, Eugene & Perlman, Yael & Cheng, T.C.E. & Levner, Ilya, 2011. "A network approach to modeling the multi-echelon spare-part inventory system with backorders and interval-valued demand," International Journal of Production Economics, Elsevier, vol. 132(1), pages 43-51, July.
- Wang, Wenbin, 2011. "A joint spare part and maintenance inspection optimisation model using the Delay-Time concept," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1535-1541.
- Gudrun P. Kiesmüller & Julia Zimmermann, 2018. "The influence of spare parts provisioning on buffer size in a production system," IISE Transactions, Taylor & Francis Journals, vol. 50(5), pages 367-380, May.
- Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
- Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
- Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
- Nowicki, David R. & Randall, Wesley S. & Ramirez-Marquez, Jose Emmanuel, 2012. "Improving the computational efficiency of metric-based spares algorithms," European Journal of Operational Research, Elsevier, vol. 219(2), pages 324-334.
- Sophie Mercier & Pierre‐Etienne Labeau, 2004. "Optimal replacement policy for a series system with obsolescence," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 20(1), pages 73-91, January.
- Braglia, M. & Frosolini, M., 2013. "Virtual pooled inventories for equipment-intensive industries. An implementation in a paper district," Reliability Engineering and System Safety, Elsevier, vol. 112(C), pages 26-37.
- Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yan, Tao & Lei, Yaguo & Wang, Biao & Han, Tianyu & Si, Xiaosheng & Li, Naipeng, 2020. "Joint maintenance and spare parts inventory optimization for multi-unit systems considering imperfect maintenance actions," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
- Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
- Zhang, Chen & Gao, Wei & Yang, Tao & Guo, Sheng, 2019. "Opportunistic maintenance strategy for wind turbines considering weather conditions and spare parts inventory management," Renewable Energy, Elsevier, vol. 133(C), pages 703-711.
- Wang, Jingjing & Qiu, Qingan & Wang, Huanhuan, 2021. "Joint optimization of condition-based and age-based replacement policy and inventory policy for a two-unit series system," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable product-service supply chains for repairable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 95(C), pages 299-321.
- Petchrompo, Sanyapong & Parlikad, Ajith Kumar, 2019. "A review of asset management literature on multi-asset systems," Reliability Engineering and System Safety, Elsevier, vol. 181(C), pages 181-201.
- Rezapour, Shabnam & Allen, Janet K. & Mistree, Farrokh, 2016. "Reliable flow in forward and after-sales supply chains considering propagated uncertainty," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 93(C), pages 409-436.
- Van der Auweraer, Sarah & Boute, Robert, 2019. "Forecasting spare part demand using service maintenance information," International Journal of Production Economics, Elsevier, vol. 213(C), pages 138-149.
- Zhu, Sha & Jaarsveld, Willem van & Dekker, Rommert, 2020.
"Spare parts inventory control based on maintenance planning,"
Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Zhu, S. & van Jaarsveld, W.L. & Dekker, R., 2019. "Spare Parts Inventory Control based on Maintenance Planning," Econometric Institute Research Papers EI2019-02, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Sheikh-Zadeh, Alireza & Rossetti, Manuel D. & Scott, Marc A., 2021. "Performance-based inventory classification methods for large-Scale multi-echelon replenishment systems," Omega, Elsevier, vol. 101(C).
- Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
- Scarf, P.A. & Cavalcante, C.A.V. & Lopes, R.S., 2019. "Delay-time modelling of a critical system subject to random inspections," European Journal of Operational Research, Elsevier, vol. 278(3), pages 772-782.
- Zhang, Xiaohong & Zeng, Jianchao, 2017. "Joint optimization of condition-based opportunistic maintenance and spare parts provisioning policy in multiunit systems," European Journal of Operational Research, Elsevier, vol. 262(2), pages 479-498.
- Parvaneh Samouei & Amir Kheirkhah & Parviz Fattahi, 2015. "A network approach modeling of multi-echelon spare-part inventory system with backorders and quantity discount," Annals of Operations Research, Springer, vol. 226(1), pages 551-563, March.
- Zahedi-Hosseini, Farhad & Scarf, Philip & Syntetos, Aris, 2017. "Joint optimisation of inspection maintenance and spare parts provisioning: a comparative study of inventory policies using simulation and survey data," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 306-316.
- Reza Barabadi & Mohammad Ataei & Reza Khalokakaie & Ali Nouri Qarahasanlou, 2021. "Spare-part management in a heterogeneous environment," PLOS ONE, Public Library of Science, vol. 16(3), pages 1-14, March.
- Turan, Hasan Hüseyin & Atmis, Mahir & Kosanoglu, Fuat & Elsawah, Sondoss & Ryan, Michael J., 2020. "A risk-averse simulation-based approach for a joint optimization of workforce capacity, spare part stocks and scheduling priorities in maintenance planning," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Godoy, David R. & Pascual, Rodrigo & Knights, Peter, 2013. "Critical spare parts ordering decisions using conditional reliability and stochastic lead time," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 199-206.
- Bjarnason, Erik T.S. & Taghipour, Sharareh & Banjevic, Dragan, 2014. "Joint optimal inspection and inventory for a k-out-of-n system," Reliability Engineering and System Safety, Elsevier, vol. 131(C), pages 203-215.
- Sharma, Pankaj & Kulkarni, Makarand S & Yadav, Vikas, 2017. "A simulation based optimization approach for spare parts forecasting and selective maintenance," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 274-289.
More about this item
Keywords
Provisioning; Spare parts; End-of-Life; Maintenance; Retirement; Parting-out; Repairable units; Stock level; Dismantling; Aviation; Life-cycle cost;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:10:y:2019:i:3:d:10.1007_s13198-019-00791-z. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.