IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v170y2015ipbp489-500.html
   My bibliography  Save this article

Workforce minimization for a mixed-model assembly line in the automotive industry

Author

Listed:
  • Battaïa, Olga
  • Delorme, Xavier
  • Dolgui, Alexandre
  • Hagemann, Johannes
  • Horlemann, Anika
  • Kovalev, Sergey
  • Malyutin, Sergey

Abstract

A paced assembly line consisting of several workstations is considered. This line is intended to assemble products of different types. The sequence of products is given. The sequence of technological tasks is common for all types of products. The assignment of tasks to the stations and task sequence on each station are known and cannot be modified, and they do not depend on the product type. Tasks assigned to the same station are performed sequentially. The processing time of a task depends on the number of workers performing this task. Workers are identical and versatile. If a worker is assigned to a task, he/she works on this task from its start till completion. Workers can switch between the stations at the end of each task and the time needed by any worker to move from one station to another one can be neglected. At the line design stage, it is necessary to know how many workers are necessary for the line. To know the response to this question we will consider each possible takt and assign workers to tasks so that the total number of workers is minimized, provided that a given takt time is satisfied. The maximum of minimal numbers of workers for all takts will be considered as the necessary number of workers for the line. Thus, the problem is to assign workers to tasks for a takt. We prove that this problem is NP-hard in the strong sense, we develop an integer linear programming formulation to solve it, and propose conventional and randomized heuristics.

Suggested Citation

  • Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
  • Handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:489-500
    DOI: 10.1016/j.ijpe.2015.05.038
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527315002054
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2015.05.038?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ighravwe, D.E. & Oke, S.A., 2014. "A non-zero integer non-linear programming model for maintenance workforce sizing," International Journal of Production Economics, Elsevier, vol. 150(C), pages 204-214.
    2. Grosse, Eric H. & Glock, Christoph H., 2015. "The effect of worker learning on manual order picking processes," International Journal of Production Economics, Elsevier, vol. 170(PC), pages 882-890.
    3. Yu, Yang & Tang, Jiafu & Sun, Wei & Yin, Yong & Kaku, Ikou, 2013. "Reducing worker(s) by converting assembly line into a pure cell system," International Journal of Production Economics, Elsevier, vol. 145(2), pages 799-806.
    4. Nakade, Koichi & Ohno, Katsuhisa, 1999. "An optimal worker allocation problem for a U-shaped production line," International Journal of Production Economics, Elsevier, vol. 60(1), pages 353-358, April.
    5. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    6. Lutz, CM & Davis, KR & Turner III, CF, 1994. "Development of operator assignment schedules: A DSS approach," Omega, Elsevier, vol. 22(1), pages 57-67, January.
    7. Grosse, E. H. & Glock, C. H. & Jaber, M. Y., 2013. "The effect of worker learning and forgetting on storage reassignment decisions in order picking systems," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 62648, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    8. Corominas, Albert & Pastor, Rafael & Plans, Joan, 2008. "Balancing assembly line with skilled and unskilled workers," Omega, Elsevier, vol. 36(6), pages 1126-1132, December.
    9. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    10. Grosse, E. H. & Glock, C. H., 2015. "The effect of worker learning on manual order picking processes," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 69316, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    11. Costa, Alysson M. & Miralles, Cristóbal, 2009. "Job rotation in assembly lines employing disabled workers," International Journal of Production Economics, Elsevier, vol. 120(2), pages 625-632, August.
    12. Hewitt, Mike & Chacosky, Austin & Grasman, Scott E. & Thomas, Barrett W., 2015. "Integer programming techniques for solving non-linear workforce planning models with learning," European Journal of Operational Research, Elsevier, vol. 242(3), pages 942-950.
    13. Techawiboonwong, Atthawit & Yenradee, Pisal & Das, Sanchoy K., 2006. "A master scheduling model with skilled and unskilled temporary workers," International Journal of Production Economics, Elsevier, vol. 103(2), pages 798-809, October.
    14. Vairaktarakis, George L. & Cai, Xiaoqiang & Lee, Chung-Yee, 2002. "Workforce planning in synchronous production systems," European Journal of Operational Research, Elsevier, vol. 136(3), pages 551-572, February.
    15. Miralles, Cristobal & Garcia-Sabater, Jose Pedro & Andres, Carlos & Cardos, Manuel, 2007. "Advantages of assembly lines in Sheltered Work Centres for Disabled. A case study," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 187-197, October.
    16. Araújo, Felipe F.B. & Costa, Alysson M. & Miralles, Cristóbal, 2012. "Two extensions for the ALWABP: Parallel stations and collaborative approach," International Journal of Production Economics, Elsevier, vol. 140(1), pages 483-495.
    17. Fowler, John W. & Wirojanagud, Pornsarun & Gel, Esma S., 2008. "Heuristics for workforce planning with worker differences," European Journal of Operational Research, Elsevier, vol. 190(3), pages 724-740, November.
    18. Moreira, Mayron César O. & Costa, Alysson M., 2013. "Hybrid heuristics for planning job rotation schedules in assembly lines with heterogeneous workers," International Journal of Production Economics, Elsevier, vol. 141(2), pages 552-560.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2022. "Model-dependent task assignment in multi-manned mixed-model assembly lines with walking workers," Omega, Elsevier, vol. 113(C).
    2. Hashemi-Petroodi, S. Ehsan & Thevenin, Simon & Kovalev, Sergey & Dolgui, Alexandre, 2023. "Markov decision process for multi-manned mixed-model assembly lines with walking workers," International Journal of Production Economics, Elsevier, vol. 255(C).
    3. Severino, Gonzalo & Rivera, José & Parot, Roberto & Otaegui, Ernesto & Fuentes, Andrés & Reszka, Pedro, 2024. "Workforce and task optimization to guarantee oxygen bottling under a COVID-19 pandemic scenario: A Chilean case study," International Journal of Production Economics, Elsevier, vol. 271(C).
    4. Sikora, Celso Gustavo Stall & Lopes, Thiago Cantos & Magatão, Leandro, 2017. "Traveling worker assembly line (re)balancing problem: Model, reduction techniques, and real case studies," European Journal of Operational Research, Elsevier, vol. 259(3), pages 949-971.
    5. Henao, César Augusto & Mercado, Yessica Andrea & González, Virginia I. & Lüer-Villagra, Armin, 2023. "Multiskilled personnel assignment with k-chaining considering the learning-forgetting phenomena," International Journal of Production Economics, Elsevier, vol. 265(C).
    6. Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
    7. Battaïa, Olga & Dolgui, Alexandre, 2022. "Hybridizations in line balancing problems: A comprehensive review on new trends and formulations," International Journal of Production Economics, Elsevier, vol. 250(C).
    8. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Malyutin, Sergey & Soukhal, Ameur, 2018. "Optimal workforce assignment to operations of a paced assembly line," European Journal of Operational Research, Elsevier, vol. 264(1), pages 200-211.
    9. Karim Aroui & Gülgün Alpan & Yannick Frein, 2017. "Minimising work overload in mixed-model assembly lines with different types of operators: a case study from the truck industry," International Journal of Production Research, Taylor & Francis Journals, vol. 55(21), pages 6305-6326, November.
    10. Ferreira, Cristiane & Figueira, Gonçalo & Amorim, Pedro, 2021. "Scheduling Human-Robot Teams in collaborative working cells," International Journal of Production Economics, Elsevier, vol. 235(C).

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y. & Malyutin, Sergey & Soukhal, Ameur, 2018. "Optimal workforce assignment to operations of a paced assembly line," European Journal of Operational Research, Elsevier, vol. 264(1), pages 200-211.
    2. Mao, Zhaofang & Sun, Yiting & Fang, Kan & Huang, Dian & Zhang, Jiaxin, 2024. "Balancing and scheduling of assembly line with multi-type collaborative robots," International Journal of Production Economics, Elsevier, vol. 271(C).
    3. Olcay Polat & Can B. Kalayci & Özcan Mutlu & Surendra M. Gupta, 2016. "A two-phase variable neighbourhood search algorithm for assembly line worker assignment and balancing problem type-II: an industrial case study," International Journal of Production Research, Taylor & Francis Journals, vol. 54(3), pages 722-741, February.
    4. Delorme, Xavier & Dolgui, Alexandre & Kovalev, Sergey & Kovalyov, Mikhail Y., 2019. "Minimizing the number of workers in a paced mixed-model assembly line," European Journal of Operational Research, Elsevier, vol. 272(1), pages 188-194.
    5. Shandong Mou, 2022. "Integrated Order Picking and Multi-Skilled Picker Scheduling in Omni-Channel Retail Stores," Mathematics, MDPI, vol. 10(9), pages 1-19, April.
    6. Valeva, Silviya & Hewitt, Mike & Thomas, Barrett W. & Brown, Kenneth G., 2017. "Balancing flexibility and inventory in workforce planning with learning," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 194-207.
    7. Bai, Danyu & Tang, Mengqian & Zhang, Zhi-Hai & Santibanez-Gonzalez, Ernesto DR, 2018. "Flow shop learning effect scheduling problem with release dates," Omega, Elsevier, vol. 78(C), pages 21-38.
    8. Battaïa, Olga & Dolgui, Alexandre, 2013. "A taxonomy of line balancing problems and their solutionapproaches," International Journal of Production Economics, Elsevier, vol. 142(2), pages 259-277.
    9. Sebnem Demirkol Akyol & Adil Baykasoğlu, 2019. "A multiple-rule based constructive randomized search algorithm for solving assembly line worker assignment and balancing problem," Journal of Intelligent Manufacturing, Springer, vol. 30(2), pages 557-573, February.
    10. Liseth Contreras Hernandez & Hanser S. Jiménez G. & Priscilla P. L. Dantas & Cristiano A. V. Cavalcante, 2022. "Using multi-criteria decision making for selecting picking strategies," Operational Research, Springer, vol. 22(4), pages 3265-3290, September.
    11. Zhang, Jun & Liu, Feng & Tang, Jiafu & Li, Yanhui, 2019. "The online integrated order picking and delivery considering Pickers’ learning effects for an O2O community supermarket," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 123(C), pages 180-199.
    12. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    13. Glock, Christoph H. & Grosse, Eric H. & Abedinnia, Hamid & Emde, Simon, 2019. "An integrated model to improve ergonomic and economic performance in order picking by rotating pallets," European Journal of Operational Research, Elsevier, vol. 273(2), pages 516-534.
    14. Sana Bouajaja & Najoua Dridi, 2017. "A survey on human resource allocation problem and its applications," Operational Research, Springer, vol. 17(2), pages 339-369, July.
    15. I. Kudelska & G. Pawłowski, 2020. "Influence of assortment allocation management in the warehouse on the human workload," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(2), pages 779-795, June.
    16. Mossa, G. & Boenzi, F. & Digiesi, S. & Mummolo, G. & Romano, V.A., 2016. "Productivity and ergonomic risk in human based production systems: A job-rotation scheduling model," International Journal of Production Economics, Elsevier, vol. 171(P4), pages 471-477.
    17. Dominic Loske & Matthias Klumpp & Maria Keil & Thomas Neukirchen, 2021. "Logistics Work, Ergonomics and Social Sustainability: Empirical Musculoskeletal System Strain Assessment in Retail Intralogistics," Logistics, MDPI, vol. 5(4), pages 1-25, December.
    18. Boysen, Nils & Schulze, Philipp & Scholl, Armin, 2022. "Assembly line balancing: What happened in the last fifteen years?," European Journal of Operational Research, Elsevier, vol. 301(3), pages 797-814.
    19. Ameknassi, Lhoussaine & Aït-Kadi, Daoud & Rezg, Nidhal, 2016. "Integration of logistics outsourcing decisions in a green supply chain design: A stochastic multi-objective multi-period multi-product programming model," International Journal of Production Economics, Elsevier, vol. 182(C), pages 165-184.
    20. Jiuh‐Biing Sheu & Tsan‐Ming Choi, 2023. "Can we work more safely and healthily with robot partners? A human‐friendly robot–human‐coordinated order fulfillment scheme," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 794-812, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:170:y:2015:i:pb:p:489-500. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.