IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v103y2006i2p798-809.html
   My bibliography  Save this article

A master scheduling model with skilled and unskilled temporary workers

Author

Listed:
  • Techawiboonwong, Atthawit
  • Yenradee, Pisal
  • Das, Sanchoy K.

Abstract

No abstract is available for this item.

Suggested Citation

  • Techawiboonwong, Atthawit & Yenradee, Pisal & Das, Sanchoy K., 2006. "A master scheduling model with skilled and unskilled temporary workers," International Journal of Production Economics, Elsevier, vol. 103(2), pages 798-809, October.
  • Handle: RePEc:eee:proeco:v:103:y:2006:i:2:p:798-809
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(06)00101-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Gabszewicz, J. & Turrini, A., 2000. "Workers' skills, product quality and industry equilibrium," International Journal of Industrial Organization, Elsevier, vol. 18(4), pages 575-593, May.
    2. Billionnet, Alain, 1999. "Integer programming to schedule a hierarchical workforce with variable demands," European Journal of Operational Research, Elsevier, vol. 114(1), pages 105-114, April.
    3. Pinker, Edieal J. & Larson, Richard C., 2003. "Optimizing the use of contingent labor when demand is uncertain," European Journal of Operational Research, Elsevier, vol. 144(1), pages 39-55, January.
    4. Oded Berman & Richard C. Larson & Edieal Pinker, 1997. "Scheduling Workforce and Workflow in a High Volume Factory," Management Science, INFORMS, vol. 43(2), pages 158-172, February.
    5. Joseph M. Milner & Edieal J. Pinker, 2001. "Contingent Labor Contracting Under Demand and Supply Uncertainty," Management Science, INFORMS, vol. 47(8), pages 1046-1062, August.
    6. Wild, Bernhard & Schneewei, Christoph, 1993. "Manpower capacity planning -- A hierarchical approach," International Journal of Production Economics, Elsevier, vol. 30(1), pages 95-106, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. D. E. Ighravwe & S. A. Oke, 2017. "A manufacturing system energy-efficient optimisation model for maintenance-production workforce size determination using integrated fuzzy logic and quality function deployment approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(4), pages 683-703, December.
    2. Azizi, Nader & Zolfaghari, Saeed & Liang, Ming, 2010. "Modeling job rotation in manufacturing systems: The study of employee's boredom and skill variations," International Journal of Production Economics, Elsevier, vol. 123(1), pages 69-85, January.
    3. Van den Bergh, Jorne & Beliën, Jeroen & De Bruecker, Philippe & Demeulemeester, Erik & De Boeck, Liesje, 2013. "Personnel scheduling: A literature review," European Journal of Operational Research, Elsevier, vol. 226(3), pages 367-385.
    4. De Bruecker, Philippe & Van den Bergh, Jorne & Beliën, Jeroen & Demeulemeester, Erik, 2015. "Workforce planning incorporating skills: State of the art," European Journal of Operational Research, Elsevier, vol. 243(1), pages 1-16.
    5. Broos Maenhout & Mario Vanhoucke, 2017. "A resource type analysis of the integrated project scheduling and personnel staffing problem," Annals of Operations Research, Springer, vol. 252(2), pages 407-433, May.
    6. Kafiabad, Shayan Tavakoli & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2020. "Integrated planning of operations and on-job training in maintenance logistics networks," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    7. repec:dau:papers:123456789/4010 is not listed on IDEAS
    8. Battaïa, Olga & Delorme, Xavier & Dolgui, Alexandre & Hagemann, Johannes & Horlemann, Anika & Kovalev, Sergey & Malyutin, Sergey, 2015. "Workforce minimization for a mixed-model assembly line in the automotive industry," International Journal of Production Economics, Elsevier, vol. 170(PB), pages 489-500.
    9. Dellaert, Nico & Jeunet, Jully & Mincsovics, Gergely, 2011. "Budget allocation for permanent and contingent capacity under stochastic demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 128-138, May.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dellaert, Nico & de Kok, Ton, 2004. "Integrating resource and production decisions in a simple multi-stage assembly system," International Journal of Production Economics, Elsevier, vol. 90(3), pages 281-294, August.
    2. Susan Feng Lu & Lauren Xiaoyuan Lu, 2017. "Do Mandatory Overtime Laws Improve Quality? Staffing Decisions and Operational Flexibility of Nursing Homes," Management Science, INFORMS, vol. 63(11), pages 3566-3585, November.
    3. Sandeep Rath & Kumar Rajaram, 2022. "Staff Planning for Hospitals with Implicit Cost Estimation and Stochastic Optimization," Production and Operations Management, Production and Operations Management Society, vol. 31(3), pages 1271-1289, March.
    4. Marty Stuebs & Li Sun, 2010. "Business Reputation and Labor Efficiency, Productivity, and Cost," Journal of Business Ethics, Springer, vol. 96(2), pages 265-283, October.
    5. Jonathan F. Bard & Lin Wan, 2008. "Workforce Design with Movement Restrictions Between Workstation Groups," Manufacturing & Service Operations Management, INFORMS, vol. 10(1), pages 24-42, November.
    6. repec:dau:papers:123456789/4010 is not listed on IDEAS
    7. Dellaert, Nico & Jeunet, Jully & Mincsovics, Gergely, 2011. "Budget allocation for permanent and contingent capacity under stochastic demand," International Journal of Production Economics, Elsevier, vol. 131(1), pages 128-138, May.
    8. Saravanan Kesavan & Bradley R. Staats & Wendell Gilland, 2014. "Volume Flexibility in Services: The Costs and Benefits of Flexible Labor Resources," Management Science, INFORMS, vol. 60(8), pages 1884-1906, August.
    9. Menezes, Mozart B.C. & Kim, Seokjin & Huang, Rongbing, 2006. "Optimal workforce size and allocation for urban retail chains," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1151-1163, December.
    10. Nasuh Buyukkaramikli & Henny Ooijen & J. Bertrand, 2015. "Integrating inventory control and capacity management at a maintenance service provider," Annals of Operations Research, Springer, vol. 231(1), pages 185-206, August.
    11. Eryn Juan He & Joel Goh, 2022. "Profit or Growth? Dynamic Order Allocation in a Hybrid Workforce," Management Science, INFORMS, vol. 68(8), pages 5891-5906, August.
    12. D Thiel, 2009. "Dynamic modelling of labour assignment flexibility in the French fresh food industry," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(5), pages 652-662, May.
    13. Brusco, Michael J., 2015. "A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives," European Journal of Operational Research, Elsevier, vol. 247(1), pages 46-59.
    14. M A Haughton, 2009. "An alternative tactic to deal with the contingency of driver absenteeism," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(9), pages 1207-1220, September.
    15. Ağralı, Semra & Taşkın, Z. Caner & Ünal, A. Tamer, 2017. "Employee scheduling in service industries with flexible employee availability and demand," Omega, Elsevier, vol. 66(PA), pages 159-169.
    16. Pinker, Edieal J. & Larson, Richard C., 2003. "Optimizing the use of contingent labor when demand is uncertain," European Journal of Operational Research, Elsevier, vol. 144(1), pages 39-55, January.
    17. Nasuh Buyukkaramikli & J. Bertrand & Henny Ooijen, 2013. "Flexible hiring in a make to order system with parallel processing units," Annals of Operations Research, Springer, vol. 209(1), pages 159-178, October.
    18. L Wan & J F Bard, 2007. "Weekly staff scheduling with workstation group restrictions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(8), pages 1030-1046, August.
    19. Bhattacharyya, Ranajoy & Saha, Bibhas, 2011. "Wage bargaining and quality competition," MPRA Paper 30968, University Library of Munich, Germany.
    20. X Zhang & A Chakravarthy & Q Gu, 2009. "Equipment scheduling problem under disruptions in mail processing and distribution centres," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(5), pages 598-610, May.
    21. Amani Kahloul & Rim Lahmandi-Ayed & Hejer Lasram & Didier Laussel, 2017. "Democracy and competition: Vertical differentiation and labor in a general equilibrium model," Journal of Public Economic Theory, Association for Public Economic Theory, vol. 19(4), pages 860-874, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:103:y:2006:i:2:p:798-809. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.